§ 9-6-3 — HOLDING BASINS REQUIRED

City Code of Ogden City, Utah (2026 S-26: code current through Ord. 2026-7, passed May 5, 2026) · Ogden City Municipal Code § 9-6-3

Corpus is an independent public-information project, not the official City of Ogden website. Stable reference: corpuslaw.us/code/b3dccf87-d3f9-468f-aba1-6aeb08885836

9-6-3: HOLDING BASINS REQUIRED:

Each developer shall provide a holding basin or other suitable structure, facility or land grading to delay the runoff of surface water from that development so that runoff will extend over a longer period of time and thereby reduce the amount of flooding which would otherwise result. The size of the holding basin and the size of the outlet required and other engineering items are to be determined by the developer and the Public Works Director, upon recommendation of the City Engineer, using general engineering data applicable to this area concerning runoff water generated by the type of development proposed, so that the new construction will not discharge onto adjacent streets or other land or into City storm sewer facilities surface water at a rate in excess of that discharged from that land prior to when the construction was made. (1979 Code § 14.48.030; amd. 1999 Code)

Ask a question about Ogden law

Corpus searches the Ogden sections it holds and shows the ones that match, with their citations. Free, no sign-in.