Chapter 17.44 — CONSTRUCTION, CONNECTION AND REPAIR PERMITS
City Code of Salt Lake City, Utah (2026 S-21: current through Ord. 49-26, passed September 15, 2026), Salt Lake City, UT · 21 sections. Independent public-information project, not the official City of Salt Lake City website.
- § 17.44.010 — SEWER WORK; PERMIT REQUIRED
- § 17.44.020 — PERMIT; APPLICATION FOR SEWER CONNECTIONS
- § 17.44.030 — ADDITIONAL SURVEYS OR INSPECTIONS; FEE
- § 17.44.040 — PERMIT; APPLICATION FOR REPAIRS AND REPLACEMENTS; FEE
- § 17.44.050 — TRIAL SEWER SURVEY FEE
- § 17.44.060 — PERMIT; ISSUANCE CONDITIONS; SEWER ASSESSMENT PAYMENT
- § 17.44.070 — ASSESSMENTS IN ADDITION TO FEES
- § 17.44.080 — PERMIT; NOT TRANSFERABLE
- § 17.44.090 — TIME FOR COMPLETION OF WORK
- § 17.44.100 — INSPECTION OF SEWER LINES; CORRECTIONS
- § 17.44.110 — REINSPECTION; ADDITIONAL FEE
- § 17.44.120 — FAILURE TO REMEDY DEFECTIVE WORK
- § 17.44.130 — PERMIT; REVOCATION CONDITIONS
- § 17.44.140 — STARTING WORK WITHOUT PERMIT; STOP WORK ORDER
- § 17.44.150 — SURVEY STAKES; REMOVAL OR COVERING PROHIBITED
- § 17.44.160 — SURVEY STAKES; RESETTING FEE
- § 17.44.170 — EXTENSIONS; APPLICATION AND ADVANCING OF EXPENSES
- § 17.44.180 — EXTENSIONS; STATEMENT OF COSTS
- § 17.44.190 — EXTENSIONS; CONSTRUCTION WORK
- § 17.44.200 — EXTENSIONS; REFUND OF EXPENSES; CONDITIONS
- § 17.44.210 — RETURN OF CITY'S EXPENSES
