For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.44.100 — INSPECTION OF SEWER LINES; CORRECTIONS

City Code of Salt Lake City, Utah (2026 S-21: current through Ord. 49-26, passed September 15, 2026) · Salt Lake City Code § 17.44.100

Corpus is an independent public-information project, not the official City of Salt Lake City website. Stable reference: corpuslaw.us/code/42724d19-a3d9-40b4-aa88-e334382faeb7

17.44.100: INSPECTION OF SEWER LINES; CORRECTIONS:

The inspection of sewer lines between the POTW sewer main and within three feet (3') of the building foundation shall be under the direction of the director. The POTW shall be notified on a regular working day at least twenty four (24) hours in advance of the time the permittee requests inspection. The entire length of the building sewer, including the junction at the POTW sewer shall be fully exposed. Any portion of the work not done in accordance with these requirements and the instruction of the POTW, or its inspectors, shall be corrected promptly. There shall be no backfilling until the inspection is made and the work accepted. No certificate of inspection shall be issued until the work is satisfactorily performed and accepted. (Ord. 36-93 § 5, 1993: prior code § 37-4-11)

Ask a question about Salt Lake City law

Corpus searches the Salt Lake City sections it holds and shows the ones that match, with their citations. Free, no sign-in.