§ 14.32.095 — EXCESS CAPACITY

City Code of Salt Lake City, Utah (2026 S-21: current through Ord. 49-26, passed September 15, 2026) · Salt Lake City Code § 14.32.095

Corpus is an independent public-information project, not the official City of Salt Lake City website. Stable reference: corpuslaw.us/code/a90a4d59-1759-40ce-a64b-e00d91fcbd28

14.32.095: EXCESS CAPACITY:

Each competitive utility provider applicant shall, as a condition of the permit: a) demonstrate to the City that the facilities proposed to be installed are reasonably anticipated to provide sufficient capacity to satisfy the needs of such applicant for a minimum of five (5) years following installation, and b) install additional facilities designed to provide double the capacity indicated in item a in this section, or such lesser or greater additional capacity as shall reasonably be required by the City Engineer. By way of example, and without limiting the generality of the foregoing, an applicant proposing to install one "quad" conduit shall install two (2) quad conduit. Such excess capacity shall be owned by the applicant, but shall be leased or otherwise made available to other users pursuant to the City's public way ordinance. The City Engineer may waive this requirement if, in the judgment of the City Engineer, the requirement will have the effect of precluding a less intrusive alternative. For example, a user proposing to bore under the public way may be relieved of this requirement if a surface cut would be required to install excess capacity. (Ord. 70-99 § 1, 1999)

Ask a question about Salt Lake City law

Corpus searches the Salt Lake City sections it holds and shows the ones that match, with their citations. Free, no sign-in.