17.48.100: JOINT WHICH CONNECTS TO POTW SEWER; SPECIFICATIONS:
The connection of the "wye" onto the main sewer shall be entirely surrounded with a collar of a design specified by the POTW construction standards. Connection work shall be done only by the POTW, or in the presence of the POTW inspector. The trench shall not be backfilled until the building sewer line has been connected, tested and approved by the POTW inspector. (Ord. 36-93 § 6, 1993: prior code § 37-3-16)