For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 17.48.100 — JOINT WHICH CONNECTS TO POTW SEWER; SPECIFICATIONS

City Code of Salt Lake City, Utah (2026 S-21: current through Ord. 49-26, passed September 15, 2026) · Salt Lake City Code § 17.48.100

Corpus is an independent public-information project, not the official City of Salt Lake City website. Stable reference: corpuslaw.us/code/9ded40e7-b3f1-403b-a60b-5670eb8837ec

17.48.100: JOINT WHICH CONNECTS TO POTW SEWER; SPECIFICATIONS:

The connection of the "wye" onto the main sewer shall be entirely surrounded with a collar of a design specified by the POTW construction standards. Connection work shall be done only by the POTW, or in the presence of the POTW inspector. The trench shall not be backfilled until the building sewer line has been connected, tested and approved by the POTW inspector. (Ord. 36-93 § 6, 1993: prior code § 37-3-16)

Ask a question about Salt Lake City law

Corpus searches the Salt Lake City sections it holds and shows the ones that match, with their citations. Free, no sign-in.