11-413 - Cost of public improvements.

(A) The planning commission shall require payment in full or guarantee of payment in full of all costs or a proportionate share of costs for the construction and installation of landscaping, public streets, alley, sidewalks, curbs, gutters, sewers, drains and other public improvements, facilities or services within an approved site plan, subject however to the following minimum schedule: (1) Local streets or alleys within site: All costs. (2) Collector or arterial street within site: All cost of sidewalk, curb, gutter, driveway and grading and 36 foot wide pavement in single, two-unit, and multi-unit (up to four units) zones or 44-foot-wide pavement in multi-unit, mixed-use, commercial and industrial zones. Pavement in excess of these requirements will be installed at city cost. (3) (a) Streets abutting site: All cost of curb, gutter, sidewalks, driveways and grading on abutting side. Paving of the traveled way will be installed at city cost. (b) Exception: All costs when an additional lane or service road is required to service the site. (c) Width of streets shall be governed by the requirements of section 7-5-28 of the city code. (4) Storm and sanitary sewers: All costs, including sewers required to serve upper areas of drainage shed and including the cost of connecting to an existing separated sanitary sewer line, unless a hardship as described in section 5-6-25 of the city code is found in which case the planning commission may waive this requirement and approve the site plan with conditions otherwise appropriate, including the payment of a pro rata share of the cost of connection. (5) Natural streams and channels: Where a natural stream or channel abuts or crosses the site and a portion of the site to be used is within the floodplain of the stream or channel, the owner or developer shall be required at his expense to improve the stream or channel to the extent necessary to provide sufficient waterway to carry the projected 100-year flood for the stream or channel. (6) (a) Natural or landscaped open space: All costs of landscaping, including new trees and shrubs, surface or ground treatment, and protection and preservation of existing ground cover, trees and plants as shown on the landscape plan as part of the approved preliminary site plan. When both site plans and erosion and sedimentation control plans are required to be submitted for a development tract of land, at least the minimum cost of replacement trees, as specified in the city erosion and sedimentation control handbook tree replacement guidelines for any trees designated to be retained in compliance with the preliminary site plan crown area coverage requirements of section 11-410(CC). (b) A 100 percent bond or escrow for all landscaping shall be required and retained by the city until such time as a minimum of 90 percent of the planting, including any replanting, shall have survived for a period of three years. Replacement landscaping shall be installed during every intervening fall and spring planting season until the three year/90 percent survival requirement is met. Nothing in this section 11-413(A)(6)(b) shall relieve an applicant, owner or successor in interest of its requirement to provide and maintain required landscaping in perpetuity. (7) Fire hydrants, underground conduits for street lighting and street trees, both on site and on public rights-of-way adjacent to site: All costs. (B) A corporate surety bond, letter of credit, certificate of deposit or similar financial guarantee for at least the sum estimated to be the full cost of the improvements, of a company authorized to do business in the state, or a cash escrow for the estimated full amount of improvements, shall be deemed to be a satisfactory guarantee.

Ask a question about Alexandria law

Corpus searches the Alexandria sections it holds and shows the ones that match, with their citations. Free, no sign-in.