For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-3-63 — Standards and procedures

Code of the City of Alexandria, Virginia (Supp. No. 156: codified through Ordinance No. 5616, adopted January 24, 2026) · Alexandria City Code § 5-3-63

Corpus is an independent public-information project, not the official City of Alexandria website. Stable reference: corpuslaw.us/code/361c17ad-13f8-4e03-b8fb-8e45dce99cb8

Sec. 5-3-63 - Standards and procedures.

(a) The horizontal location of all existing underground utility lines and those underground utility lines proposed by any operator shall be indicated on all site plans, subdivision plans, or engineering plans prior to approval. (b) Depending upon the size and importance of the utility line to be affected, the affected operator shall determine whether or not an inspection by its representative at the site of excavation is necessary during the crossing of its utility lines. (c) Pre-construction meetings between excavators and utility operators shall be scheduled prior to all excavation projects whenever considered necessary by the city manager or his designated representative. (Code 1963, Sec. 39A-24)

Ask a question about Alexandria law

Corpus searches the Alexandria sections it holds and shows the ones that match, with their citations. Free, no sign-in.