§ 5-6-130 — Accidental discharge and slug control plan
Code of the City of Alexandria, Virginia (Supp. No. 156: codified through Ordinance No. 5616, adopted January 24, 2026) · Alexandria City Code § 5-6-130
Corpus is an independent public-information project, not the official City of Alexandria website. Stable reference: corpuslaw.us/code/990527d8-6080-4437-8ec1-c2a2e70166b6
Sec. 5-6-130 - Accidental discharge and slug control plan.
(a) The Engineer shall evaluate whether each industrial user needs an accidental discharge and slug control plan. Where reasonably appropriate and required by the engineer, an industrial user shall provide protection from spills, leaks and/or slug discharges of prohibited materials and other wastes regulated under this division. For the purpose of this section, a slug discharge is any discharge of a nonroutine, episodic nature, including but not limited to an accidental spill or a noncustomary batch discharge. If the authority determines that an industrial use shall implement an accidental discharge and slug control plan is needed, the plan shall contain, at a minimum, the following elements: (1) a description of the user's discharge practices, including nonroutine batch discharges; (2) a description of stored chemicals; (3) procedures for immediately notifying the authority of a slug discharge, including any discharge that would be a violation of section 5-6-111, with procedures for follow-up written notification within five days of the discharge; (4) if necessary, procedures to prevent adverse impacts from accidental spills, including inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site run-off, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents), and measures and equipment for emergency response. (b) Facilities to prevent such spills, leaks or slug discharges shall be provided and maintained at the industrial user's expense. Detailed plans showing such facilities and the operating procedures to provide this protection shall be submitted to the engineer for review, and shall be approved by the engineer prior to facility construction. The authority, acting through the engineer, shall have the authority and responsibility to enter upon the property of an industrial user, at any reasonable time, for the purpose of investigating or testing any facility to assure that an accidental spill and slug control plan is at all times fully effective. Accidental spill and slug control plan requirements may be part of the industrial user permit issued to industrial users. (c) Immediately following a leak or spill, the industrial user shall notify the engineer or other authority personnel by telephone of the fact of the leak or spill, the extent of the leak or spill, and the known causes. Within five days following the leak or spill, the user shall submit to the engineer a detailed written report describing the cause of the leak or spill and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage or other liability which may be incurred as a result of damage to the POTW or any other property or of injury to persons caused by the leak or spill. Any such notification shall not relieve the user of any liabilities, fines or other applicable penalties which may be imposed under this code or other applicable laws. (Ord. No. 4501, 10/13/07, Sec. 1)
Ask a question about Alexandria law
Corpus searches the Alexandria sections it holds and shows the ones that match, with their citations. Free, no sign-in.