§ 7-1211 — Modification, replacement, or installation of additional wireless facilities on an existing structure
Code of the City of Alexandria, Virginia (Supp. No. 156: codified through Ordinance No. 5616, adopted January 24, 2026) · Alexandria Zoning Ordinance § 7-1211
Corpus is an independent public-information project, not the official City of Alexandria website. Stable reference: corpuslaw.us/code/38ee65d4-ae62-4228-b8c7-e4de106c04b4
7-1211 - Modification, replacement, or installation of additional wireless facilities on an existing structure.
(A) Definition. For purposes of this section 7-1211, the term "eligible facilities request" shall have the same meaning as in 47 C.F.R. § 1.6100, or any successor regulation. (B) Application required. A wireless services provider or wireless infrastructure provider shall apply for a permit for any eligible facilities request. (C) Application process. (1) An applicant for an eligible facilities request permit shall file an application with the director on such forms and subject to such procedures as the director may establish for the purpose, which shall include a statement identifying the applicant and providing a valid electronic mail address for the applicant. (2) The director shall determine whether the proposed modification, replacement or installation constitutes an eligible facilities request. Within 30 days after receipt of an application and a valid electronic mail address for the applicant, the director shall notify the applicant by electronic mail whether the application qualifies as an eligible facilities request. (3) If the proposed modification, replacement or installation does constitute an eligible facilities request, the application shall be further reviewed in accordance with 47 C.F.R. § 1.6100 and the application may be approved in accordance with the timeframes and procedures of that regulation. (4) If the proposed modification, replacement or installation is for a small cell facility and does not constitute an eligible facilities request the application shall be reviewed in accordance with this section. (5) If the proposed modification, replacement or installation is for a standard facility and does not constitute an eligible facilities request the application shall be reviewed in accordance with the procedures and standards set forth in this section. (D) Filing fee. The fee for processing an application under this section shall be (1) $500.00 for standard facilities per application and (2) shall be $100.00 each for the first five permit requests and $50.00 for each additional permit request on an application for small cell facilities.
Ask a question about Alexandria law
Corpus searches the Alexandria sections it holds and shows the ones that match, with their citations. Free, no sign-in.
