§ 26-221 — Definitions
Code of the City of Chesapeake, Virginia (Supp. No. 148: codified through Ordinance No. 26-O-071, enacted August 11, 2026) · Chesapeake City Code § 26-221
Corpus is an independent public-information project, not the official City of Chesapeake website. Stable reference: corpuslaw.us/code/7fe52fc8-ba9f-4f06-9b36-90f7c0ca8a73
Sec. 26-221. - Definitions.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section: Borrow pit means any operation where topsoil, sand, clay, gravel or other materials indigenous to the excavation site, or any combination thereof, are or have been excavated below ground level and transported off-site for any purpose. The proposed or actual end use of the property upon which the excavation operation is or was conducted shall have no bearing on whether such operation falls within this definition of a borrow pit. The cessation of excavation or the commencement of an end use shall not change the classification of the excavated area as a borrow pit, unless or until express approval of the end use is given by the City. Specifically exempt from the definition of borrow pit are the following: (1) Excavations conducted for the sole purpose of preparing a site for the construction of roads, driveways, building foundations, swimming pools, utilities other than drainage facilities, or similar features necessarily incidental to, and constructed in accordance with, approved construction plans for residential dwelling units, subdivisions or commercial and industrial developments, provided that such construction takes place within the city upon the same site as the excavation operation, and further provided that the amount of materials excavated does not exceed that which is necessary for approved construction activities. (2) Excavations conducted by the City of Chesapeake, its boards, commissions and local authorities, or by public service corporations if for the sole purpose of installing, repairing, removing or relocating utility facilities within the city. (3) Excavations conducted for the sole purpose of constructing a detention area or a retention area within the city, provided that: i) all requirements set forth in division 3 of this article have been met, including approval of construction plans for an on-site development or subdivision by the director, (ii) all applicable requirements of Article VIII of this Chapter are met; and (iii) the excavation at no time exceeds 20 feet in depth and/or 20 acres in size, measured from top of bank, unless a conditional use permit for a borrow pit has been obtained from the city council. (4) Excavations conducted solely for the purpose of constructing a fish farm pond to be regularly stocked with aquatic life for commercial or recreational fishing activities; provided that: i) an erosion and sediment control plan showing the location, size, maximum depth, and side slopes of the fish farm pond, as well as any stockpile areas, is submitted to the director for approval; ii) a land-disturbing permit is issued by the director on the basis of an approved erosion and sediment control plan; iii) the excavation does not exceed 1.5 acres in area or 25 feet in depth; iv) the slopes of the fish farm pond are no greater than three feet horizontal to one foot vertical (3:1) from top of bank to the bottom of the excavation; v) the fish farm pond is located at least 25 feet from all property lines, as measured from top of bank; and vi) the fish farm pond complies with all other applicable provisions in the city code and zoning ordinance. If at any time after completion of the excavation, the excavation area is not used as a fish farm pond, the owner of the property shall be required to: i) obtain a conditional use permit for a borrow pit, ii) fill the excavated area, or iii) take such other action as may be necessary to obtain approval of the excavated area for a lawful use. (5) Excavations conducted solely for purposes of constructing a fire pond, provided that each of the following is met: (i) the location, dimensions and final depth of the fire pond are shown on an approved final subdivision plan or on an approved final site plan prior to the commencement of excavation; (ii) the Chesapeake Fire Department ("Fire Department") certifies that the fire pond, including its proposed size and depth, is necessary to serve the fire suppression needs of the subdivision or development shown on the approved final subdivision plan or on the approved final site plan; (iii) the excavation shall not exceed 1.5 acres in size or 20 feet in depth, unless a need for greater size or depth is clearly demonstrated by the applicant and certified by the Fire Department; (iv) the fire pond is constructed with side slopes no less than three foot horizontal to one foot vertical (3:1) from the top of bank to the bottom of the side walls; (v) the fire pond is located at least 25 feet from all property boundaries; (vi) permanent emergency access to the fire pond is provided from a public street as required and approved by the Fire Department; and (vii) a private impoundment and maintenance agreement is provided to, and approved by, the director. Detention area means any operation where topsoil, sand, clay, gravel or other materials indigenous to the excavation site, or any combination thereof, are excavated in connection with a development or subdivision approved by the city in accordance with chapter 70, the subdivision ordinance of the city, for the purpose of providing a facility to temporarily detain groundwater or stormwater onsite, provided that all requirements in division 3 of this article are met, and further provided that such excavation at no time exceeds 20 feet in depth and/or 20 acres in size, measured from top of bank. Director means the director of development and permits, or designee. Excavation means any digging, scooping or other method of removing earth materials. Fill material means any material, including but not limited to topsoil, sand or clay, transported onto an excavation site from any other location, regardless of the source of such material, which is stored on-site or used for fill purposes. The term shall also mean any material, other than topsoil, sand or clay, which is located on-site at the time of, or prior to, the commencement of excavation and which is, or is intended to be, stored on-site or used for fill purposes during the conduct of excavation or restoration activities. Person means any individual, corporation, partnership, association, agency, governmental body or other legal entity, other than the city. Retention area means any operation where topsoil, sand, clay, gravel or other materials indigenous to the excavation site, or any combination thereof, are excavated in connection with a development or subdivision approved by the city in accordance with chapter 70, the subdivision ordinance of the city, for the purpose of providing a facility to permanently detain groundwater or stormwater on-site, provided that all requirements in division 3 of this article are met, and further provided that such excavation at no time exceeds 20 feet in depth and/or 20 acres in size. Site means any parcel of real property located within the city, depicted by boundaries described by deed or shown on the city tax map, upon which an excavation operation is or is intended to be conducted. The term "site" may also refer to a residential subdivision located within the city, under single ownership, where an approved subdivision plat has been recorded in the clerk's office for the circuit court of the city and where a lawful excavation operation is or is intended to be conducted within the boundaries of such subdivision. The term "site" may also refer to a commercial or industrial development located within the city, under single ownership, where a final site plan has been approved by the city and where a lawful excavation operation is or is intended to be conducted within the boundaries of such development. The use of the term "on-site" or "excavation site" in this article shall be synonymous with the use of the term "site." The use of the term "off-site" in this article shall denote a parcel or parcels of real property other than those upon which a permitted and approved excavation operation in question is or is intended to be conducted.
(Ord. No. 93-O-054, § 9-1, 4-20-93; Ord. No. 93-O-099, § 9-1, 7-27-93; Ord. No. 93-O-218, § 9-1, 12-21-93; Ord. No. 00-O-044, 4-25-00; Ord. No. 06-O-144, 11-28-06; Ord. No. 09-O-098, 8-11-09)
Ask a question about Chesapeake law
Corpus searches the Chesapeake sections it holds and shows the ones that match, with their citations. Free, no sign-in.
