Sec. 26-244. - Operation and performance standards.

Borrow pit excavations shall be conducted in compliance with the following: (1) Site plan approval. Upon obtaining a conditional use permit for a borrow pit, the holder of such permit shall submit to the director for review and approval a site plan showing the proposed location, depth, acreage, setbacks and sloping of the borrow pit, as well as any additional information which the director may require. The holder shall also submit to the director copies of the plan of operation and end-use approved by city council as part of the conditional use permit. The site plan submitted to the director shall in all cases be consistent with the plan of operation and end-use plan. No excavation activities shall commence until such time that the director has approved the site plan for the borrow pit. (2) Restoration plan approval. All site plans submitted to the director pursuant to subsection (1) of this section shall be accompanied by a restoration plan showing the following: a. Restoration contour plan, prepared by a professional engineer or certified land surveyor, showing proposed contours at two-foot intervals and datum used. The plan shall also show the proposed topography of the area for a distance of at least 200 feet from the edge of the excavation. b. Final depth of the excavation and final grade of slopes. c. Proposed dates for commencing and completing restoration activities. d. A planting plan for all areas not to be inundated, including a list of materials proposed for the replacement of topsoil, replanting, fertilization and bank stabilization. The planting plan shall set forth the amount of planting to be performed on-site, the types of vegetation to be planted, the depth to which the topsoil is to be spread and the amount and type of fertilizer which is to be applied. No excavation activities shall commence until such time as the director has approved a restoration plan for the borrow pit. (3) Location. No borrow pit shall be excavated within 1,000 feet of any existing residence not owned by the owner of the site upon which the excavation is to be conducted. This distance may be adjusted by city council upon a determination that a reduction of the setback will not have an adverse impact on existing residences located within 1,000 feet of the proposed borrow pit operation. In no event, however, shall the city council reduce the distance between the edge of a borrow pit and an existing residence not owned by the owner of the site on which the excavation is to be conducted below 250 feet. No borrow pit shall be excavated in wetlands as defined in section 26-167 or as authorized by the city wetlands board. The foregoing location requirements shall not apply where: a. The director determines that the primary purpose of the borrow pit is to serve as a necessary drainage facility for a proposed residential, business or industrial development; and b. The borrow pit has been included in and depicted on a preliminary site plan or subdivision plan filed with the city as a necessary drainage facility. If each of the foregoing requirements is met for any proposed or approved borrow pit, the setback requirements for detention and retention areas set forth in section 26-268 shall apply. (4) Setbacks. No borrow pit shall be located within 125 feet from any existing or proposed public street or right-of-way. Outer edges of all borrow pits shall be set back from exterior lot lines of abutting properties as required below. Applicable setback distances shall be determined in reference to the more intensive of the zoned or actual use of the abutting property. Required Setback From Edge of Borrow Pit to Exterior Lot Lines Use of Abutting Property | Required Setback from Lot Line, in Feet Vacant | 200 Open space | 200 Recreational | 200 Agricultural | 150 Residential | 500 Institutional | 200 Commercial | 150 Public property | 150 Industrial | 50 Waterbody, watercourse | 150 Existing well | 500 The setback areas prescribed above shall not be used for any purpose, other than for approved access roads, during the excavation of the borrow pit. The setback areas prescribed above may be reduced by the city council where property lines abut tidal waters, existing utility easements or railroad tracks. The setback areas prescribed above for residential properties and existing wells may be adjusted by the city council where necessary to negate any adverse impact which might occur to adjoining properties without the imposition of unreasonable and overly burdensome restrictions on land use. In no event, however, shall the setback area for residential properties or existing wells be reduced below 250 feet. The foregoing setback requirements shall not apply where: a. The director determines that the primary purpose of the borrow pit is to serve as a necessary drainage facility for a proposed residential, business or industrial development; and b. The borrow pit has been included in and depicted on a preliminary site plan or subdivision plan filed with the city as a necessary drainage facility. If each of the foregoing requirements is met for any proposed or approved borrow pit, the setback requirements for detention and retention areas set forth in section 26-268 shall apply. (5) Sloping and grading. The walls and banks of all excavations shall be sloped in accordance with the specifications indicated in the restoration plan submitted to and approved by the director. Sloping shall be accomplished continually during the excavation process and shall be completed as soon as practicable after excavation activities cease. Upon completion of restoration activities, all borrow pits shall be left with slopes no greater than three feet horizontal to one foot vertical, such sloping to be maintained continuously from the top of the bank to the bottom of the excavation. Where a borrow pit is located in a residential area or an area zoned for residential use, the borrow pit shall be left with slopes no greater than four feet horizontal to one foot vertical, such sloping to be maintained continuously from the top of the bank to the bottom of the excavation. However, upon express consent by the director through site plan approval, a borrow pit may be left with slopes no greater than two feet horizontal to one foot vertical commencing five feet below the normal water level and continuing to the bottom of the excavation. Slopes from the top of the bank to five feet below normal water level shall in every case be no greater than four to one for borrow pits located in residential areas or in areas zoned for residential use and no greater than three to one for borrow pits located in all other areas. All two-to-one slopes permitted by the director shall be formed with undisturbed materials. No overburden, fill material or disturbed sand, clay, topsoil, gravel or dirt shall be used to create two-to-one sloping. (6) Drainage. Drainage shall be provided, either natural or artificial, so that water does not collect or remain on any area within the site not being excavated. No borrow pit shall be constructed so as to obstruct or restrict the flow of private or public drainage. (7) Depth. The depth of a borrow pit shall be measured from the top of bank, using mean natural surface elevation, to the deepest level from which earth materials were excavated. In no event shall a borrow pit be excavated below the maximum depth depicted in the site plan approved by the director. Excavation below such depth and subsequent backfilling of the borrow pit with fill material, including but not limited to topsoil, sand or clay transported on-site, is not permitted unless and until all permits and authorizations required for a debris or sanitary landfill have been obtained. Absent such a permit for a debris or sanitary landfill, no fill materials shall be brought on-site or deposited into the borrow pit. (8) Access. a. Truck and vehicular access to any borrow pit shall be so arranged as to minimize danger to traffic and nuisance to surrounding properties. On-site access roads shall meet the standards imposed by the director prior to the commencement of excavation activities. b. At least 200 feet of pavement shall be required on-site, such pavement to commence from the point where on-site access roads connect with public streets or highways. When an access road connects to an unpaved street or highway, no pavement shall be required subject to the determination by the director or designee that such pavement is unnecessary to serve the purpose of requiring such pavement. When the unpaved street or highway becomes paved and publicly maintained, the owner or operator of the borrow pit shall pave the on-site access road for 200 feet as set out above. If the on-site paving is not provided and maintained, access from the site to the paved street or highway may be prohibited by the director or designee, in addition to any other remedies available to the City. c. Acceleration, deceleration and turn lanes shall also be required when determined by the director or designee to be necessary due to traffic volume. d. All access roads shall be constructed to intersect as nearly as possible at right angles with public streets and highways. No access road shall intersect any public street or highway at an angle less than 60 degrees. e. All streets and roads, whether public or private, utilized to access the excavation site shall be maintained free of dust and sediment. (9) Hours of operation. Operating hours for excavating and hauling shall be restricted to between 7:00 a.m. and 7:00 p.m. Where deemed necessary, the city council may impose more stringent restrictions on hours of operation as a stipulation to the conditional use permit. (10) Planting and roadside landscaping. All portions of the excavation site which are not to be covered by water as an end-use shall be covered with soil and vegetation in accordance with the planting plan submitted to and approved by the director under subsection (2) of this section. Unless otherwise permitted by city council, existing trees and vegetation along public street frontage shall be preserved and maintained during excavation and restoration activities. (11) Fencing. Where deemed necessary by the city council, the applicant or operator shall be required to erect a fence around the perimeter of the borrow pit. Such fence shall be chainlink anchor and shall be erected to a minimum height of six feet. The fence shall completely encircle the borrow pit and shall, unless otherwise specified by city council, remain erected after restoration and for so long as the excavated area is inundated. The fence shall be maintained in good repair. All gates and other entrances to the borrow pit shall be kept locked at all times when not in use. (12) Signs. Prior to commencing the excavation of a borrow pit, the holder of the conditional use permit shall post a sign on-site notifying the public that excavation activities are to be conducted upon such property in accordance with a conditional use permit issued by city council. Such signs shall remain on-site until all activities conducted under the conditional use permit, including grading and restoration, have been completed. In addition, commencing from the date the excavation begins until such time as the borrow pit is completely filled with earth materials, the excavation site shall be posted with one or more signs which clearly warn the public of danger and which indicate the maximum depth of the borrow pit. Such warning signs shall be maintained in good condition at all times. All signs required under this subsection shall be posted upon the site in full view of, and legible from, a public right-of-way. In cases where the site does not abut a public right-of-way, the location of the sign shall be specified by the director. (13) Noise. Where deemed necessary by the city council to protect against excessive noise, the applicant or operator shall be required to use submersible electric pumps to remove water from a borrow pit. (14) Damaged well restoration. If one or more private wells exist within a 2,000-foot radius of the proposed boundaries of any borrow pit, a hydrology study prepared by a qualified and licensed engineer shall be submitted with the application for the conditional use permit. The hydrology study shall include findings as to any adverse impact which the proposed excavation activities may have upon private wells existing within the 2,000-foot radius and shall further contain recommendations toward mitigating such impact. The city council may consider these findings and recommendations in adjusting setbacks and imposing other conditions upon the holder of the use permit. Such conditions shall be designed to avoid adverse impacts on well owners, including but not limited to requiring monitoring wells, additional hydrological studies or surety to protect well owners from loss. Any person owning or operating a borrow pit in a manner that adversely affects a well through contamination or diminution of groundwater shall provide the well owner with a replacement water supply equal in quality to the water supply and water supply system adversely affected by the borrow pit operations. There shall be a rebuttable presumption that the failure of any well located within a 2,000-foot radius of the boundaries of an active borrow pit due to a diminution or contamination of water has been caused by the excavation of such pit.

(Ord. No. 93-O-054, § 9-6, 4-20-93; Ord. No. 93-O-099, § 9-6, 7-27-93; Ord. No. 93-O-218, § 9-6, 12-21-93; Ord. No. 94-O-195, 9-27-94; Ord. No. 06-O-143, 11-28-06; Ord. No. 09-O-098, 8-11-09)