§ 26-519 — Permitted development in the resource protection area (RPA)

Code of the City of Chesapeake, Virginia (Supp. No. 148: codified through Ordinance No. 26-O-071, enacted August 11, 2026) · Chesapeake City Code § 26-519

Corpus is an independent public-information project, not the official City of Chesapeake website. Stable reference: corpuslaw.us/code/a1f90096-988e-492c-bd48-4dcfe42a0602

Sec. 26-519. - Permitted development in the resource protection area (RPA).

(a) In addition to the general performance standards set forth in this article, the following standards shall apply to all use, land disturbance, development, or redevelopment proposed within the RPA: (1) Land disturbance and development may be allowed in the RPA, subject to the approval of the CBPA review committee only if such development (i) is water dependent; (ii) constitutes redevelopment outside or within the IDA meeting requirements in section 26-519; (iii) is a new use established pursuant to section 26-519; (iv) is a road or driveway crossing meeting the requirements set forth in section 26-519; or (v) is a flood control or stormwater management facility meeting the requirements set forth in section 26-519. Additionally, the following conditions shall apply: a. A water quality impact assessment and resiliency assessment as set forth in section 26-523 shall be performed. b. A new or expanded water dependent facility may be allowed provided that the following criteria are met: 1. The facility does not conflict with the comprehensive plan; 2. All non-water dependent components are located outside of the RPA; and 3. Access to the water-dependent facility is provided with the least amount of land disturbance necessary. Where practicable, a single point of access will be provided. c. Redevelopment outside the IDA shall be permitted in the RPA only under the following conditions: 1. There is no increase in impervious cover; 2. There is no further encroachment within the RPA than existed under the previous development; 3. The development complies with the performance standards in this article, including, without limitation, buffer standards in section 26-519; 4. The development conforms to applicable erosion and sediment control and stormwater management criteria set forth in the erosion and sediment control ordinance, the stormwater management ordinance, Virginia law and regulations, and all applicable stormwater management requirements of other state and federal agencies; and 5. Approval is obtained from the CBPA review committee, as provided in section 26-518. d. Roads and driveways not otherwise exempt under section 26-526, may be constructed in or across the RPA, only if each of the conditions set out below are met. As used herein, the term "driveway" may include private commercial drive aisles and entrance improvements approved by the director of development and permits, or designee, and planter islands required by the director of development and permits, or designee. The term shall not include parking spaces, parking facilities, signs, or any other accessory building, structure or improvement requiring disturbance of the RPA. 1. The director of development and permits or designee finds that there are no reasonable alternatives to aligning the road or driveway in or across the RPA; 2. The alignment and design of the road or driveway are optimized, consistent with other applicable requirements, to minimize encroachment in the RPA and adverse effects on water quality; 3. The design and construction of the road or driveway satisfy all applicable criteria of this article, including submission of a water quality impact assessment and resiliency assessment; 4. The road or driveway complies with the standards in the Code and the Chesapeake Public Facilities Manual, site plan, subdivision plan and plan of development requirements; and 5. Approval is obtained from the CBPA review committee, as provided in section 26-518. e. Flood control and BMPs that drain or treat water from multiple developments or from a significant portion of a CBPA watershed may be permitted in the RPA, provided that: 1. The administrator has approved a storm water management plan consistent with section 26-348 and 9 VAC 25-875, et seq.; 2. The director of development and permits or designee has conclusively established that the location of the facility within the RPA is the optimum location; 3. The size of the facility is the minimum necessary to provide necessary flood control, stormwater treatment, or both; 4. The facility complies with this article, including without limitation, the stormwater management ordinance and regulations adopted thereunder, and the Chesapeake Public Facilities Manual; 5. All applicable state and federal permits are obtained from the appropriate federal and state agencies having jurisdiction; 6. The facility meets the performance standards set forth in this article; 7. Routine maintenance is allowed to be performed on such facilities to assure that they continue to function as designed; and 8. Approval is obtained from the CBPA review committee, as provided in section 26-518. If all requirements set out in subsections (1) through (5) are not satisfied, an exception in accordance with section 26-528 shall be required. Notwithstanding the foregoing, it is not the intent of this article to permit flood control or BMPs in the RPA where such facilities only collect and treat runoff from an individual lot or a portion of an individual lot. (b) RPA buffer requirements. (1) To minimize the adverse effects of land-disturbance, development and redevelopment activities on the RPA, state waters and aquatic life, a 100-foot wide buffer area of woody vegetation that is effective in retarding runoff, preventing erosion, and filtering nonpoint source pollution from runoff shall be retained if present or established if it does not exist with a minimum tree canopy coverage of 50 percent, calculated in accordance with the CBPA Specifications Manual. The planting of trees shall be incorporated into the re-establishment of the 100-foot buffer, as appropriate to site conditions and in such a manner to maximize the buffer function. The inclusion of native species in tree planting is preferred. (2) The buffer area shall be located adjacent to and landward of other RPA components and along both sides of any water body with perennial flow. The 100-foot buffer area shall be designated as the landward component of the RPA. Notwithstanding permitted uses, encroachments, and vegetation clearing, as set forth in this section, the 100-foot wide buffer is not reduced in width. The 100-foot buffer area shall be deemed to achieve a 75 percent reduction of sediments and a 40 percent reduction of nutrients. The 100-foot buffer area shall not be subject to encroachment except as follows: a. Agricultural lands as provided in subsection 26-519(b)(5). b. When the application of the 100-foot buffer area will result in the loss of a reasonable buildable area on a lot or parcel recorded prior to January 21, 1992, the CBPA review committee may permit encroachments in the buffer area through an administrative review process in accordance with the following criteria: 1. Encroachments into the buffer area shall be the minimum necessary to achieve a reasonable buildable area for a principal structure and necessary utilities, as determined by the CBPA review committee; 2. Where practicable, a vegetated area that will maximize water quality protection, mitigate the effects of the buffer encroachment, and equal the area of encroachment into the buffer area shall be established elsewhere on the lot or parcel. Such vegetated area, where established, shall include the planting of trees as appropriate to site conditions. Inclusion of native species in tree planting is preferred; and 3. The encroachment may not extend into the seaward 50 feet of the buffer area. c. When the application of the buffer area would result in the loss of buildable area on a lot or parcel recorded after January 21, 1992, and prior to March 1, 2002, encroachments into the buffer may be allowed through approval by the CBPA review committee, provided that the landowner is able to show: 1. The lot or parcel was created as a result of a legal process conducted in conformity with the City of Chesapeake's subdivision regulations and has been approved by the director of planning, or designee, and the director of development and permits, or designee, as part of a valid final site plan or final subdivision plan approved prior to March 1, 2002; 2. If the prior approval of the encroachment included the use of a best management practice (BMP), the BMP shall be evaluated to determine if it continues to function effectively or will be re-established, repaired, and maintained as necessary to ensure that it will function effectively, as determined by the director of development and permits, or designee; 3. The encroachment is the minimum necessary to achieve a reasonable buildable area for a principal structure and necessary utilities, as determined by the CBPA review committee; 4. Where practicable, a vegetated area greater than or equal to the area of encroachment will be established elsewhere on the lot to maximize water quality protection and mitigate the effects of the encroachment. Where established, such vegetated areas shall include the planting of trees as appropriate to site conditions. The inclusion of native species in tree planting is preferred; and 5. The encroachment does not extend into the seaward 50 feet of the buffer area. 6. The criteria in subsections 1. and 2. above may be satisfied by a written memorandum from the director of development and permits, or designee, that prior approval of the buffer encroachment has been given based on the location of appropriate best management practices landward of the 100-foot buffer area as necessary to collectively achieve water quality protection, pollutant removal and water resource conservation at least the equivalent of the full 100-foot buffer area and that where established, the approved BMP continues to function effectively. d. Encroachment into the 100-foot buffer area in the IDA to the extent permitted under section 26-521. e. Exceptions, exemptions and nonconforming waivers granted under sections 26-525 through 26-526. (3) The 100-foot vegetated buffer area shall be continuously maintained to meet each of the following additional performance standards: a. In order to maintain the functional value of the 100-foot RPA buffer area, existing vegetation shall be retained. The city manager's designee may authorize removal of existing vegetation in the RPA only to provide for reasonable sightlines, access paths, general wood lot management, and best management practices, including those that prevent upland erosion and concentrated flows of stormwater, pursuant to the following: 1. In general, where the removal of trees within the buffer area is proposed, mature trees shall be preserved and trimmed or pruned in lieu of removal as site conditions permit and any removal should be limited to the fewest number of trees feasible. Any trees removed shall be replaced to provide 50 percent tree canopy coverage as required in subsection 26-520(b)(3)a. 2. When trees are proposed for removal or pruning to provide for sight lines, vistas, and access paths, they shall be replaced with vegetation that is equally effective in retarding runoff, preventing erosion, and filtering nonpoint source pollution from runoff. When trees are removed to provide for sight lines and vistas, they shall be replaced with trees as appropriate to site conditions and in such a manner as to maximize the buffer function and to protect the quality of state waters. Inclusion of native species in tree replanting is preferred. 3. Any access paths shall be constructed and surfaced so as to effectively control erosion. 4. Dead, diseased or dying trees or shrubbery and noxious weeds (such as Johnson grass, kudzu, and multiflora rose), may be removed and thinning of trees may be allowed pursuant to sound horticulture practice and with the approval of the director of development and permits, or designee, provided that any trees removed shall be replaced to provide 50 percent tree canopy coverage as required in subsection 26-520(b)(3)a. 5. For shoreline erosion control projects, trees and woody vegetation may be removed, provided that necessary control techniques are employed, and appropriate vegetation is established to protect or stabilize the shoreline in accordance with the best available technical advice and applicable permit conditions or requirements. (a.) The removal of mature trees for the installation and maintenance of proposed shoreline erosion control projects shall only be permitted as necessary for the installation and maintenance of the projects consistent and with the best technical advice, project plans, and applicable permit conditions or requirements. (b.) Trees shall be incorporated in the project when vegetation is being established as appropriate to the site conditions and the project specifications. Inclusion of native species in tree planting is preferred. (c.) Shoreline erosion control within the RPA shall be consistent with the Wetlands Act (Chapter 13 Title 28.2), the Virginia Marine Resources Commission (VMRC) Tidal Wetlands Guidelines which provide for "minimum standards for the protection and conservation of wetlands," and "ensure protection of shorelines and sensitive coastal habitat from sea level rise and coastal hazard." (4) Adaptation measures proposed for location within the RPA shall meet the following conditions: a. The selected adaptation measure shall be a nature-based solution that utilizes environmental processes, natural systems, or natural features identified as being appropriate for existing site conditions. Adaptation measures should consist of trees, vegetation, stone or enhance existing natural elements. b. An identified adaptation measure shall be selected from one of the following sources: Chesapeake Bay program approved BMP list, the Virginia Stormwater BMP Clearinghouse, the VMRC Tidal Wetlands Guidelines, or be a project that is eligible for funding by the Virginia Community Flood Preparedness Fund Grant. c. Adaptation measures approved for use in the RPA shall be designed, installed, and maintained in accordance with the applicable specifications for the selected adaptation measure. d. Adaptation measures should be placed channelward of the proposed development whenever possible and should maximize the preservation of mature trees and other natural vegetation to minimize adverse impacts to the RPA and to maximize water quality benefits. e. The use of fill as a component of an adaptation measure may be permitted, provided it meets the following conditions: 1. The grading and slope created by the use of fill shall be no greater than necessary based upon the project specifications and implemented in a manner that minimizes the impact of runoff. 2. Fill shall have the necessary biogeochemical characteristics, including sufficient organic content, to support the growth of vegetation and adequate permeability to allow infiltration consistent with project specifications. 3. The use of fill shall not exacerbate stormwater runoff, and lateral flow onto adjacent properties shall be controlled. Any impacts on the management of stormwater upland of the RPA created by the use of fill shall be mitigated, as necessary. 4. The use of fill for an adaptation measure shall not negatively impact septic systems and drainfields located within the RPA. Where present, the proximity of the adaptation measure using fill should be considered such that fill will not interfere with the proper function or maintenance of either of these features. 5. The use of fill shall be consistent with any applicable local, state, or federal floodplain requirements. The applicant shall provide documentation to verify that proposed adaptation measures do not conflict with any constraints or requirements of floodplain management or flood control provision, including the federal floodplain management regulations found in Title 40 CFR Part 60. The allowance of fill under these provisions does not negate those independent requirements. f. The preservation of existing natural vegetation shall be maximized, including mature trees, and land disturbance and impervious surfaces consistent with design specifications shall be minimized. g. Adaptation measures shall comply with all federal, state, and local requirements, including any required permits and conditions such as the need for a water quality impact assessment (WQIA) and resiliency assessment. h. Nothing in these provisions shall be construed to authorize approval or allowance of an adaptation measure in contravention of floodplain management requirements, including the city floodplain management ordinance. i. Prior to any land disturbing activity, a protective barrier, consisting of TP-1 safety fencing, shall be installed around the perimeter of the required 100-foot buffer area and shall remain in place during the entire construction period. Perimeter protective barriers shall only be required if the limits of land disturbance are entirely within the RMA. If RPA disturbance is approved, protective barriers shall be placed in designated locations to protect the portions of the RPA that are not to be disturbed. j. Natural growth of understory and groundcover shall also be preserved to form trophic layers of vegetation. (5) On agricultural lands, the 100-foot buffer area shall be managed to prevent runoff and appropriate measures taken to prevent noxious weeds from invading the vegetation. Encroachments into the agricultural 100-foot buffer area may be permitted by the city manager's designee only as follows: a. Agricultural activities may encroach into the landward 50 feet of the 100-foot buffer when at least one agricultural best management practice which, in the opinion of the Virginia Dare Soil and Water Conservation District Board, addresses the more predominant water quality issue on the adjacent land (erosion control or nutrient management) is being implemented on the land adjacent to the buffer, provided that the combination of the undisturbed buffer area and the BMP achieves water quality protection, pollutant removal, and water resource conservation at least the equivalent of the 100-foot buffer area. If nutrient management is identified as the predominant water quality issue, a nutrient management plan, including soil tests, must be developed consistent with the Virginia Nutrient Management Training and Certification Regulations administered by the state department of conservation and recreation. b. Agricultural activities may encroach within the landward 75 feet of the 100-foot buffer area when agricultural BMPs which address erosion control, nutrient management, and pest chemical control, are being implemented on the land adjacent to the buffer. The erosion control practices must be sufficient to prevent erosion from exceeding the soil loss tolerance level, referred to as "T," as defined in the "National Soil Survey Handbook" of November 1996, in the "Field Office Technical Guide" of the U. S. Department of Agriculture Natural Resource Conservation Service. A nutrient management plan, including soil tests, must be developed, consistent with the Virginia Nutrient Management Training and Certification Regulations (4VAC50-85-10, et seq.) administered by the state department of conservation and recreation. In conjunction with the remaining buffer area, this collection of BMPs shall be presumed to achieve water quality protection at least the equivalent of that provided by the 100-foot buffer area. c. The 100-foot buffer area is not required adjacent to agricultural drainage ditches if at least one best management practice (BMP) is installed which, in the opinion of the Virginia Dare Soil and Water Conservation District Board, addresses the more predominant water quality issue on the land adjacent to the ditch, if either erosion control or nutrient management is being implemented on the adjacent land.

(Ord. No. 03-O-160, 12-9-03; Ord. No. 05-O-095, 7-20-05; Ord. No. 08-O-110, 8-12-08; Ord. No. 09-O-098, 8-11-09; Ord. No. 10-O-098, 7-27-10; Ord. No. 12-O-077, 7-24-12; Ord. No. 14-O-062, 5-27-14; Ord. No. 25-O-109, 10-28-25)

Ask a question about Chesapeake law

Corpus searches the Chesapeake sections it holds and shows the ones that match, with their citations. Free, no sign-in.