Sec. 70-167. - Construction of improvements required.
(a) Pavement structure capable of carrying the anticipated traffic, and curbs and gutters, shall be required on all new streets. Street signs and traffic control devices shall be erected at all street intersections within or abutting the subdivision. All new streets shall be marked, and existing streets shall be remarked in accordance with the specifications of the director of development and permits, or designee. When development takes place on streets accepted and maintained by the city, as of the effective date of the ordinance from which this chapter is derived, improvements shall be limited to rights-of-way dedications and reservations, as determined by section 70-95, and to ditch relocation and shoulder improvements. However, curb and gutter extension shall be required of all development and subdivisions where such improvements exist within 500 feet along the street or highway. A street improvement plan shall be drawn and submitted to the director of development and permits, or designee, for approval and shall show the proposed street and lot drainage properly related to the city datum along with the elevation of existing and proposed ground surface at all street intersections and points of grade change along centerlines of streets together with the proposed grade lines connecting therewith. (b) Sidewalks shall be required on both sides of all new streets. The dedication of land for, and construction of, sidewalks shall further be required when the property being subdivided or developed fronts on an existing street if: (1) Abutting property on either side of the property has an existing sidewalk, or (2) When the need for the sidewalk is substantially generated and reasonably required by the proposed development and is in accordance with the adopted comprehensive plan. In determining whether sidewalk is required under this subsection, the director of development and permits may consult with the planning director and/or city attorney and shall consider whether the proposed development creates a potential origin or destination of pedestrian traffic, or if the lack of sidewalk creates a dangerous or unsafe condition. (c) A storm drainage system shall be provided for by means of storm sewer pipes, swales, ditches and other facilities which shall be designed and installed in accordance with criteria established by the director of development and permits, or designee. Such additional drainage measures shall be installed as deemed necessary by the director for the proper functioning of septic tanks under criteria of the state health department. Storm drainage systems shall include, in addition to their physical components, all easements, maintenance provisions, etc., as required for their proper functioning and maintenance according to the aforementioned criteria. Nothing in this section shall be construed to prohibit storm water management as defined in section 26-344 from being located in any zoning district subject to the requirements of the zoning ordinance. (d) Street lights shall be designed and installed in each subdivision in accordance with city standards. The subdivider shall show the location of all proposed streets on the construction plans submitted to the director of development and permits, or designee, for approval. The subdivider shall be responsible for the construction and operational costs for a two-year period beginning with the energizing of the lighting system. Evidence of compliance with this requirement shall be secured prior to the director of development and permits, or designee, approving the final plat. Compliance may take the form of cash to be held by the city until installation has been completed, or such costs may be included in the bonding figure for other required improvements. The cost of operation of the lighting for a two-year period, however, shall be a cash settlement as a prerequisite to the approval of the final plat by the director of development and permits, or designee. (e) Underground installation of utility lines. (1) Permanent electrical lines carrying less than 50,000 volts and permanent telephone, cable, water, sewer and gas lines installed in subdivisions and developments subject to the terms of this chapter shall be installed underground in each such subdivision or development in accordance with standards established by the director of development and permits, or designee. This requirement shall not apply to electrical distribution transformers, switchgear, meters, meter and telephone pedestals, service connections and other related devices which are installed aboveground in normal industry practice for the purpose of connecting, coordinating, monitoring, servicing or otherwise maintaining the service provided by the lines which are installed underground. (2) The subdivider or developer shall show the location of all existing and proposed underground utility lines on the construction plans submitted to the director of development and permit, or designee, for approval. The location of all existing or proposed aboveground utility lines which are within the proposed subdivision or development, or to which the proposed utility lines within the subdivision or development will be connected, shall also be shown. When aboveground utility lines are shown within the subdivision or development on the construction plans, a written explanation regarding the existence or proposed existence of such lines shall accompany the construction plans. (3) The director of development and permits, or designee, shall not approve any final plat or site unless such plan or plat provides for the installation of utility lines in accordance with the terms of this chapter.
(Code 1970, § 25-44; Ord. of 1-19-82, § 2; Ord. of 2-21-89; Ord. of 7-18-89; Ord. No. 96-O-012, 1-16-96; Ord. No. 98-O-073, 5-19-98; Ord. No. 99-O-156 (alternate version 9-30-99), 12-21-99; Ord. No. 05-O-128, 10-18-05; Ord. No. 09-O-052, 5-19-09; Ord. No. 19-O-139, 10-15-19)
Ask a question about Chesapeake law
Corpus searches the Chesapeake sections it holds and shows the ones that match, with their citations. Free, no sign-in.