§ 1-7 — Review process for building permits
Code of the City of Hampton, Virginia (Supp. No. 32: codified through Ordinance No. 26-0009, adopted June 10, 2026) · Hampton Zoning Ordinance § 1-7
Corpus is an independent public-information project, not the official City of Hampton website. Stable reference: corpuslaw.us/code/cac4f47a-97cf-43ca-bb6f-b9260644e46a
Sec. 1-7. - Review process for building permits.
Prior to the issuance of a building or zoning permit, an application therefor shall be submitted to the zoning administrator for review. Unless waived by the zoning administrator, all such applications shall include: (1) A current physical property survey of the intended development site that is produced and sealed by a professional land surveyor licensed by the Commonwealth of Virginia; and (2) A scaled two-dimensional plan or drawing of the intended development that accurately depicts: (a) The lot/parcel boundaries; (b) The location, shape and dimensions of all proposed property improvements in relation to all existing on-site property improvements; (c) All adjacent and on-site easements, right-of-way, waterbodies/waterways and resource protection area features; (d) The existing and intended use of each building or part of a building; (e) The number of families the building is designed to accommodate; (f) The location and the number of off-street parking and off-street loading spaces; and (g) Such other information with regard to the lot/parcel and buildings/structures as may be necessary to determine and provide for the enforcement of the provisions of this ordinance.
Ask a question about Hampton law
Corpus searches the Hampton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
