For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 30-23 — Fees—Generally

Code of the City of Hampton, Virginia (Supp. No. 32: codified through Ordinance No. 26-0009, adopted June 10, 2026) · Hampton City Code § 30-23

Corpus is an independent public-information project, not the official City of Hampton website. Stable reference: corpuslaw.us/code/216001ac-39f3-4433-9f93-41fd5d586915

Sec. 30-23. - Fees—Generally.

(a) The director of public works shall issue a permit for a sewer connection, as provided for in section 30-22, when and after the applicant therefor has paid into the city treasury a tap connection fee based on average construction costs as follows: (1) Lots having a frontage of not more than thirty (30) feet: Four hundred dollars ($400.00). (2) Lots having over thirty (30) feet of frontage, but not more than forty (40) feet: Five hundred dollars ($500.00). (3) Lots having over forty (40) feet of frontage, but not more than fifty (50) feet: Six hundred dollars ($600.00). (4) Lots having over fifty (50) feet of frontage, but not more than sixty (60) feet: Seven hundred dollars ($700.00). (5) Lots in excess of sixty (60) feet of frontage: Seven hundred dollars ($700.00) for the first sixty (60) feet and ten dollars ($10.00) per foot for each additional foot of frontage. The frontage of lots shall be calculated on the shorter frontage, when the property has more than one frontage line, except for connections to serve buildings used or to be used for industrial purposes. (b) Notwithstanding the provisions of subsection (a) above, the amount to be paid for a sewer connection in the following cases shall not be less than the amount indicated below: (1) For a two-family duplex: Six hundred eighty dollars ($680.00). (2) For an apartment house: Three hundred fifty dollars ($350.00) for each apartment therein. (3) For a lot embracing more than one building, mobile home or housekeeping trailer requiring sewer service, served by a single connection: Three hundred fifty dollars ($350.00) for each unit served or to be served. (4) For a building used or to be used for commercial purposes: Seven hundred dollars ($700.00). (c) The amount to be paid in for sewer connections to serve buildings used or to be used for industrial purposes shall be eight cents ($0.08) per square foot of building space, but in no case less than seven hundred dollars ($700.00). (d) In the event a single family residence is located on acreage and there is no enclosure separating the residence from the remaining acreage, the sewer connection fee shall be based upon the minimum frontage required for a lot in the particular zone in which the residence is located, or to be located, and meeting all side yard setback requirements. (e) The connection, through an existing sewer connection, of any separate residential, commercial or industrial unit shall be deemed a "sewer connection" within the meaning of this section. (f) In the event that any person required by this article to have his property connected to a public sewer shall fail, after ten (10) days' notice in writing from the city manager, to have such connection made, it shall be the duty of the director of public works to compute the sewer connection fee applicable in each instance under the provisions of this section and certify the same to the city treasurer. The amount so certified shall be a lien against the real estate as a part of and the same as taxes duly assessed against the real estate by the city.

(Code 1956, § 17-48; Code 1964, § 30-20; Ord. No. 267; Ord. No. 383; Ord. No. 1457, 1-24-07)

Ask a question about Hampton law

Corpus searches the Hampton sections it holds and shows the ones that match, with their citations. Free, no sign-in.