Sec. 33.3-12. - Water quality impact assessment.
(a) Purpose and intent. The purpose of the water quality impact assessment is to: (1) Identify the impacts of proposed development on water quality and other environmentally sensitive lands; (2) Ensure that, where development does take place within sensitive lands, it will be located on those portions of a site in a manner that will be least disruptive to the natural functions of sensitive lands; (3) Protect individuals from investing funds for improvements proposed for location on lands unsuited for such development because of high ground water, erosion, or vulnerability to flood and storm damage; and (4) Specify mitigation which will address water quality protection. (b) Water quality impact assessment required. A water quality impact assessment is required, including a review fee of two hundred dollars ($200.00), for any proposed development disturbing over one (1) acre of land area, or any land disturbance exceeding two thousand five hundred (2,500) square feet within the Chesapeake Bay preservation district as set forth in the city zoning ordinance, except those uses exempt from the stormwater management requirements per section 33.3-8 of this article. An assessment must apply the stormwater management technical criteria set forth in section 33.3-13 of this article to the entire land-disturbing activity. A water quality impact assessment shall include the following elements, which shall be considered a minimum unless the administrator determines that some of the elements are unnecessary due to the scope and nature of the proposed uses and development of land. (1) Information on the type and location of stormwater discharges, information on the features to which stormwater is being discharged including surface waters or karst features, if present, and the pre-development and post-development drainage areas; (2) A general description of the proposed stormwater management facilities and the mechanism through which the facilities will be operated and maintained after construction is complete; (3) Information on the proposed stormwater management facilities, including: a. The types of facilities; b. Location, including geographic coordinates; c. Acres treated; and d. The surface waters or karst features, if present, into which the facility will discharge. (4) Hydrologic and hydraulic computations, including runoff characteristics; (5) Documentation and calculations verifying compliance with the water quality and quantity requirements of section 33.2-13 of this article. (6) A map or maps of the site that depicts the topography of the site and includes: a. All contributing drainage areas; b. Existing streams, ponds, culverts, ditches, wetlands, other water bodies, and floodplains; c. Soil types, geologic formations if karst features are present in the area, forest cover and other vegetative areas, and groundwater levels, including seasonal fluctuations; d. Current land use including existing structures, roads, and locations of known utilities and easements; e. Sufficient information on adjoining parcels to assess the impacts of stormwater from the site on these parcels; f. The limits of clearing and grading, and the proposed drainage patterns on the site; g. Proposed buildings, roads, parking areas, utilities, and stormwater management facilities; and h. Proposed land use with tabulation of the percentage of surface area to be adapted to various uses, including but not limited to planned locations of utilities, roads, and easements. (7) Information related to the following: a. Disturbances or destruction of wetlands and RPA features and justification for such action; b. Disruptions or reductions in the supply of water to wetlands, streams, lakes, rivers, or other water bodies, which may include but is not limited to changes in the incidence or duration of flooding on the site and upstream and downstream from it; c. Disruptions to existing hydrology including wetland and stream circulation patterns; d. Source location and description of proposed fill material; e. Location of dredge material and location of dumping area for such material; and f. Location of and impacts on shellfish beds, submerged aquatic vegetation, and fish spawning areas. (8) Any other information which the developer or the administrator believes is reasonably necessary for an evaluation of the proposed development; (9) Listing of all requisite permits from all applicable agencies necessary to develop the project; (10) Proposed mitigation measures for the potential hydrogeological impacts. Potential mitigation measures include: a. Proposed erosion and sediment control concepts, which may include minimizing the extent of the cleared area, perimeter controls, reduction of runoff velocities, and measures to stabilize disturbed areas; b. Proposed stormwater management system; c. Creation of wetlands to replace those lost; and d. Minimizing cut and fill.
(Ord. No. 24-0013, 9-11-24)
Ask a question about Hampton law
Corpus searches the Hampton sections it holds and shows the ones that match, with their citations. Free, no sign-in.