For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33.3-40 — Local erosion and sediment control program

Code of the City of Hampton, Virginia (Supp. No. 32: codified through Ordinance No. 26-0009, adopted June 10, 2026) · Hampton City Code § 33.3-40

Corpus is an independent public-information project, not the official City of Hampton website. Stable reference: corpuslaw.us/code/cf240718-80bd-4482-8712-4c4a5be91e87

Sec. 33.3-40. - Local erosion and sediment control program.

Pursuant to § 62.1-44.15:54 of the Code of Virginia, the city hereby establishes a Virginia Erosion and Sediment Control Program (VESCP) and adopts the regulations promulgated by the Board for the effective control of soil erosion and sediment deposition to prevent the unreasonable degradation of properties, stream channels, waters and other natural resources and the Virginian Stormwater Management Handbook. In accordance with § 62.1-44.15:52 of the Code of Virginia, any plan approved prior to July 1, 2014, that provides for stormwater management that addresses any flow rate capacity and velocity requirements for natural or man-made channels shall satisfy the flow rate capacity and velocity requirements for natural or man-made channels if the practices are designed to (i) detain the water volume equal to the first one-half inch of runoff multiplied by the impervious surface of the land development project and to release it over forty-eight (48) hours; (ii) detain and release over a 24-hour period the expected rainfall resulting from the one (1) year, 24-hour storm; and (iii) reduce the allowable peak flow rate resulting from the 1.5-, 2-, and 10-year, 24-hour storms to a level that is less than or equal to the peak flow rate from the site assuming it was in a good forested condition, achieved through multiplication of the forested peak flow rate by a reduction factor that is equal to the runoff volume from the site when it was in a good forested condition divided by the runoff volume from the site in its proposed condition, and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels. (a) For plans approved on and after July 1, 2014, the flow rate capacity and velocity requirements for natural and man-made channels shall be satisfied by compliance with water quantity requirements specified 9VAC25-875-600, unless such land-disturbing activities are in accordance with the grandfathering provisions of 9VAC25-875-490. (b) Pursuant to § 62.1-44.15:53 of the Code of Virginia, an erosion control plan shall not be approved until it is reviewed by a certified plan reviewer for ESC. Inspections of land-disturbing activities shall be conducted by a certified inspector for ESC. The Erosion and Sediment Control Program of city shall contain a certified program administrator for ESC, a certified plan reviewer for ESC, and a certified inspector for ESC (who may be the same person). (c) The city hereby designates the department as the VESCP plan-approving authority. (d) The program and regulations provided for in this ordinance shall be made available for public inspection at the office of the department.

(Ord. No. 24-0013, 9-11-24)

Ask a question about Hampton law

Corpus searches the Hampton sections it holds and shows the ones that match, with their citations. Free, no sign-in.