Sec. 35.1-103. - Permits for installation of public improvements and inspections.
At the time of approval of the site plan, in order to proceed with the installation of any required public improvements, the owner or developer must have applied for and obtained all necessary and applicable permits. (A) Infrastructure permit. An infrastructure permit will be issued by the director of public works for all proposed public improvements to be constructed outside of existing public rights-of-way, but within proposed public rights-of-way or easements. At the time of approval of the site plan, the owner and/or developer shall obtain such permit and shall pay all applicable fees for the cost of permitting and inspection of the public improvements. It shall be a violation of the City Code to construct public improvements without possession of a valid infrastructure permit. Work within existing public rights-of-way shall be permitted through a right-of-way permit in accordance with section 34-41 of the City Code. (B) Permitting and inspection fees. Permitting and inspection fees shall be paid prior to the issuance of the infrastructure permit for the installation of public improvements, according to the following schedule: (1) One dollar ($1.00) per linear foot of mainline sanitary sewer line, plus (2) One dollar ($1.00) per linear foot of curb and gutter, and sidewalk plus (3) One dollar ($1.00) per linear foot of storm sewer line. (C) Term of permit. (1) A permit issued under this chapter shall be valid for a period of one (1) year; provided however, such permit may be extended for an additional one (1) year period prior to the expiration of the original permit, by written approval of the director of public works, upon receipt of evidence of reasonable progress toward the completion of the public improvements and compliance with all conditions of approval. (2) If the owner or developer fails to commence construction of the public improvements within one (1) year after the date of the permit issuance, and the permit is not extended as set forth in subsection (C)(1) hereinabove, then the infrastructure permit shall become null and void. A new infrastructure permit must be obtained, new permit fees must be paid for and new surety must be provided as set forth in this section in order to commence construction of the public improvements. However, if the infrastructure permit is extended as set forth in subsection (C)(1) hereinabove, no new fees or surety will be required. (D) Revocation of permit. In the event that public improvements are not being installed in accordance with city standards, the director of public works shall give written notice of construction deficiencies (notice to comply) to the permittee by registered or certified mail to the address specified by the permittee in his permit application, or by delivery at the site of the public improvement activities to the agent or employee supervising such activities. If, after seven (7) days of the date of notice, the permittee has not corrected the deficiencies, the director of public works may revoke the infrastructure permit, and the permittee or person responsible for constructing the public improvements shall be deemed to be in violation of this section and, upon conviction, shall be subject to the penalties provided by paragraph (G) below. (E) Stop work orders. Upon notification of a violation of this article which threatens life, limb or property, the director of public works may, in conjunction with or subsequent to a notice to comply, as specified in paragraph (D) above, issue an order requiring that all or part of the public improvement construction on the site be stopped until the specified corrective measures have been taken. The order shall be served in the same manner as the notice to comply, and shall remain in effect for seven (7) days from the date of service, pending the completion of the corrective action. Upon completion of the corrective action, the order shall immediately be lifted. (F) Reinstatement of the permit. In the event that an infrastructure permit has been revoked, the owner or developer may seek reinstatement of the permit by correcting all identified deficiencies, and by paying a reinstatement fee of two hundred dollars ($200.00). (G) Penalties for violation. A violation of the conditions of this section shall be deemed a Class 1 misdemeanor and each day shall constitute a separate violation.
(Ord. No. 13-0008, 5-8-13)