For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 41.1-8 — Required; application generally

Code of the City of Hampton, Virginia (Supp. No. 32: codified through Ordinance No. 26-0009, adopted June 10, 2026) · Hampton City Code § 41.1-8

Corpus is an independent public-information project, not the official City of Hampton website. Stable reference: corpuslaw.us/code/4ec6e9a4-fef0-486b-b4cb-29e6fb74e200

Sec. 41.1-8. - Required; application generally.

(a) Any person who desires to use or develop any wetland within this city, other than for the purpose of conducting the activities specified in section 41.1-7, shall first file an application for a permit directly with the wetlands board or with the commission. (b) The permit application shall include the following: (1) The name and address of the applicant; (2) A detailed description of the proposed activities; (3) A map, drawn to an appropriate and uniform scale, showing the area of wetlands directly affected; the location of the proposed work thereon; the area of existing and proposed fill and excavation; the location, width, depth, and length of any proposed channel and the disposal area; and the location of all existing and proposed structures, sewage collection and treatment facilities, utility installations, roadways and other related appurtenances or facilities, including those on adjacent uplands; (4) A statement indicating whether use of a living shoreline as defined in Section 28.2-104.1 of the Code of Virginia, as amended, for a shoreline management practice is not suitable, including reasons for the determination; (5) A description of the type of equipment to be used and the means of equipment access to the activity site; (6) The names and addresses of owners of record of adjacent land and known claimants of water rights in or adjacent to the wetland of whom the applicant has notice; (7) An estimate of cost; (8) The primary purpose of the project; (9) Any secondary purposes of the project, including further projects; (10) The public benefit to be derived from the proposed project; (11) A complete description of measures to be taken during and after the alteration to reduce detrimental offsite effects; (12) The completion date of the proposed work, project or structure; and (13) Such additional materials and documentation as the wetlands board may require. (c) A nonrefundable processing fee of three hundred fifty dollars ($350.00) shall accompany each permit application. In the case of an after-the-fact permit application, the fee shall be three hundred fifty dollars ($350.00).

(Ord. No. 1104, 9-22-93; Ord. No. 1392, 3-23-05; Ord. No. 1477, 5-24-07; Ord. No. 20-0006, 6-10-20; Ord. No. 23-0015, 12-13-23)

Ask a question about Hampton law

Corpus searches the Hampton sections it holds and shows the ones that match, with their citations. Free, no sign-in.