For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.
Black Friday: $25 off forming an LLC in any stateLLC formation, through Dec. 1.See the deal →

§ 14-23 — Program components

Code of Ordinances of the Town of Leesburg, Virginia (Codified through Ordinance No. 2026-O-003, adopted March 24, 2026. (Supp. No. 27)) · Leesburg Code of Ordinances § 14-23

Corpus is an independent public-information project, not the official City of Leesburg website. Stable reference: corpuslaw.us/code/82d105f6-e0bf-4389-b066-033d3db2fbc4

Sec. 14-23. - Program components.

(a) Elements. The town stormwater quantity and quality management and erosion and sediment control program shall consist of the following elements: (1) Illicit discharge detection and elimination; (2) VSMP compliance; (3) Construction site stormwater control; (4) Postconstruction stormwater control; and (5) Stormwater management system maintenance. It shall be unlawful to cause a stormwater discharge from a municipal separate storm sewer or a land-disturbing activity without a permit from a permit issuing authority, unless such discharge is explicitly allowed without a permit under the provisions of this article. (b) Illicit discharge detection and elimination. The following shall be the illicit discharge and detection and elimination requirements: (1) Discharges to the stormwater management system. It is the intent of the town to prohibit the entry of any substance other than stormwater, whether liquid or solid, into the stormwater management system. For illustrative purposes, prohibited substances include, but are not limited to: waste, trash, and garbage; food and kitchen waste; leakage from dumpsters or trash containers; gasoline, waste oil, lubricants, grease, antifreeze, or any other automotive, motor, or equipment fluids; fertilizers, grass clippings, mulch, and any yard waste; any chemical or solvent; soluble and non-soluble metals; wash water, detergents, and cleaning agents; paints; plastics; soot, ash, and sludge; animal waste; eroded soils and sediment; carcasses; chlorinated swimming pool water; and, any material that impedes or interferes with the free flow of stormwater. (2) Unlawful. It shall be unlawful to: a. Cause or allow illicit discharges to the town's stormwater management system; b. Discharge materials other than stormwater to the stormwater management system by spills, dumping, or disposal without a VSMP permit; c. Cause or allow industrial waste to be discharged into the stormwater management system without a VSMP permit; d. Cause a connection to the stormwater conveyance system that will or has the potential to allow for an illicit discharge to enter the system; or e. Violate any condition or provision of this article or any permit granted for stormwater discharges. (c) Not unlawful discharge. The following activities shall not be unlawful as illicit discharges subject to the provisions in subsection (d) of this section: (1) Water line flushing; (2) Landscape irrigation; (3) Diverting stream flows or rising groundwater; (4) Uncontaminated groundwater infiltration; (5) Uncontaminated pumped groundwater; (6) Discharges from potable water sources; (7) Foundation drains; (8) Air conditioning condensate; (9) Irrigation water; (10) Springs; (11) Water from crawl space pumps; (12) Footing drains; (13) Lawn watering; (14) Individual residential car washing; (15) Flows from riparian habitats and wetlands; (16) Dechlorinated swimming pool discharges; (17) Street washing; and (18) Discharges or flows from firefighting activities. (d) Written notice. If any of the activities listed in subsection (c) of this section are found by the director to be a source of pollutants to the waters of the state, the director shall serve written notice to the person performing such activities and shall order that such activities be stopped or conducted in such manner as to avoid the discharge of pollutants. The notice shall state the date by which the activity shall cease or be conducted without pollution. Failure to comply with any such order within the time stated in the notice shall constitute a violation of this article. (1) Inspections and sampling. The following shall be the procedure for inspection and sampling: a. The director shall have authority to enter onto public and private property to carry out all inspections, surveillance, and sampling procedures necessary to determine compliance and noncompliance with the conditions of the town's VSMP permit and this article, including the prohibition of illicit discharges to the stormwater management system. The director may sample stormwater outfalls or other components of the stormwater management system as may be appropriate in the administration and enforcement of this article. b. If an illicit discharge as defined herein is detected, it shall be a violation of this article and the owner shall be notified in writing of the actions that must be taken to correct deficiencies along with a specific time for taking corrective action. If the corrective action is not performed within the specified time, the town may perform the necessary corrections and bill the property owner. If the owner fails to reimburse the town within 30 days, the town shall have a lien against the property in the amount of such costs, plus interest at the legal rate, and may enforce same in the same manner as a lien for real property taxes may be enforced. Any relief obtained under this section shall not prevent the town from seeking other and further relief authorized under the provisions of section 14-24 c. The director is authorized to require immediate abatement of any violation of this article that constitutes an immediate threat to the health, safety or well-being of the public. If any such violation is not abated immediately as directed by the director, the town, or its designated contractor, is authorized to enter onto private property and take any and all measures required to remediate the violation. Any expense related to such remediation undertaken by the town shall be fully reimbursed by the property owner and/or responsible party. Any relief obtained under this section shall not prevent the town from seeking other and further relief authorized under the provisions of section 14-24 d. If deemed necessary to prevent future occurrences of illicit discharges, the director shall have the authority to require a stormwater pollution prevention plan, as set forth in the DCSM, from any person whose discharge causes, or may cause, a violation of this article. (2) Erosion impact areas and environmentally sensitive areas. The following shall be the provisions to determine erosion impact areas and environmentally sensitive areas: a. The town council may designate portions of the town as erosion impact areas after conducting an investigation and a public hearing. The designated area may consist of a single parcel, or multiple parcels, and may include parcels where there is no active erosion, but where sheet flow from the parcel causes or significantly contributes to erosion on adjacent parcels. b. The director may require the development of an erosion and sediment control plan for any portion of the town designated as an erosion impact area. c. Areas of the town consisting of slopes greater than 25 percent or consisting of highly erodible soils shall be designated as environmentally sensitive areas. d. When a parcel in an erosion impact area or an environmentally sensitive area is subject to the construction site stormwater runoff controls of subsection (f) of this section or the postconstruction stormwater runoff controls of subsection (g) of this section, the director may, as a condition of approval, require the development and implementation of an erosion and sediment control plan. (e) VSMP compliance. Except as provided herein, no person may engage in any land-disturbing activity, and no grading, building, land disturbing, or similar permit shall be issued for a property, until the items required by this section are submitted to and approved by the director. (1) VSMP compliance elements. a. A permit application on a form provided by the director that includes a general permit registration statement, if such registration statement is required; b. Evidence of general permit coverage, if such general permit coverage is required; c. Compliance with construction site stormwater control requirements in subsection (f), including an approved erosion and sediment control plan and pollution prevention plan; and, d. Compliance with postconstruction stormwater control requirements in subsection (g), including an approved stormwater management plan, and compliance with stormwater management system maintenance requirements in subsection (h), including an approved stormwater maintenance agreement. (2) Stormwater pollution prevention plan. a. The applicant must develop prior to a land-disturbing activity, implement, and keep at the site for inspection a stormwater pollution prevention plan that meets the requirements of this section. b. The stormwater pollution prevention plan required by the general permit must comply with the requirements set forth in 9VAC25-870-54 and the terms of the general permit as set forth in 9VAC25-880-70. c. The stormwater pollution prevention plan must be amended whenever there is a change in design, construction, operation, or maintenance that has a significant effect on the discharge of pollutants to waters of the state and that is not addressed in the existing plan. d. The stormwater pollution prevention plan must be maintained at a central location onsite. If an onsite location is unavailable, notice of the plan's location must be posted near the main entrance at the construction site. Operators must make the plan available for public review in accordance with the general permit, either electronically or in hard copy. (3) Fees and bonds. All fees required to be paid pursuant to Section 1.04 of the Subdivision and Land Development Regulations must be received and the performance bonding requirements pursuant to Division 6 of the Subdivision and Land Development Regulations must be satisfied. (4) Grandfathering. A land-disturbing activity as defined in 9VAC25-870-48 shall be grandfathered and meet the technical criteria in 9VAC25-870-93 through 9VAC25-870-99, except that the more stringent of the technical criteria in 9VAC25-870-93 through 9VAC25-870-99 or the Town Code in effect prior to July 1, 2014, shall apply to the land-disturbing activity. (5) Monitoring and inspections. a. The director shall inspect land-disturbing activities for: 1. Compliance with the approved erosion and sediment control plan; 2. Compliance with the approved stormwater management plan; 3. Development, updating, and implementation of the pollution prevention plan; 4. Development and implementation of any additional control measures necessary to address a TMDL. b. The director may, at reasonable times, and under reasonable circumstances, enter any establishment or upon any property, public or private, for the purpose of obtaining information or conducting surveys or investigations necessary in the enforcement of the provisions of VSMP compliance elements. c. In accordance with a performance bond with surety, cash escrow, letter of credit, any combination thereof, or such other legal arrangement or instrument, the director may also enter any establishment or upon any property, public or private, for the purpose of initiating or maintaining appropriate actions which are required by the permit conditions associated with a land-disturbing activity when a permittee, after proper notice, has failed to take acceptable action within the time specified. d. Pursuant to Code of Virginia, § 62.1-44.15:40, the director may require every person subject to VSMP compliance elements to furnish when requested such application materials, plans, specifications, and other pertinent information as may be necessary to determine the effect of his discharge on the quality of state waters, or such other information as may be necessary to accomplish the purposes of this article. e. Post-construction inspections of stormwater management facilities required by the provisions of this article shall be conducted by the director pursuant to the town's adopted and State Water Control Board-approved inspection program, and shall occur, at minimum, at least once every five years except as may otherwise be provided for in section (h). (6) Exemptions. The following activities are exempt from the compliance elements in subsection (1) above unless otherwise required by town code or state or federal law: a. Any land disturbance that requires only a site plan waiver or a standard zoning permit provided that it is less than one acre, not part of a larger common plan of development or sale that is one acre or greater, and that all erosion and sediment control requirements in subsection (f) are met; b. Any single-family residence separately built and disturbing less than one acre and not part of a common plan of development or sale, including additions or modifications to existing single-family detached residential structures, provided that all erosion and sediment control requirements in subsection (f) are met; c. Any land disturbance that is less than one acre and is not part of a common plan of development or sale that will result in a land-disturbing activity of one acre or greater provided that all erosion and sediment control requirements in subsection (f) are met, that all postconstruction stormwater control requirements in subsection (g) are met, and that all stormwater management system maintenance requirements in subsection (h) are met; d. Discharges to a sanitary sewer or a combined sewer; e. Routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original construction of a project. The paving of an existing road with a compacted or impervious surface and re-establishment of associated existing ditches and shoulders shall be deemed routine maintenance if performed in accordance with this subsection; f. Conducting land-disturbing activities in response to a public emergency where the related work requires immediate authorization to avoid imminent endangerment to human health or the environment. In such situations, the director shall be advised of the disturbance within seven days of commencing the land-disturbing activity and compliance with this article shall be required within 30 days of commencing the land-disturbing activity; g. Permitted surface or deep mining operations and projects, or oil and gas operations and projects conducted under the provisions of the Code of Virginia Title 45.1; h. Land clearing for agricultural or silvicultural purposes, and related activities, in accordance with Code of Virginia, § 62.1-44.15:34.C.2; and, i. Activities under a state or federal reclamation program to return an abandoned property to an agricultural or open land use. (f) Construction site stormwater control. The following shall be the construction site stormwater control provisions: (1) Minimum requirements. Any proposed disturbance of the natural terrain of any subdivision or development where the disturbed area is greater than 500 square feet or includes the removal or addition of soil in excess of 12 inches in depth shall comply with the town's DCSM and land subdivision ordinance. (2) Erosion and sediment control plan. All proposed land disturbance shall be subject to the following construction site stormwater control requirements prior to any clearing of the site or issuance of any building, land use, or land development permit: a. An erosion and sediment control plan approved by the director for disturbances over 500 square feet. In addition to director approval, for all disturbances 5,000 square feet or greater, a formal grading/land disturbance permit is required to be obtained from the Loudoun County Department of Building and Development in accordance with the memorandum of understanding executed between the town and the county dated February 3, 2010, as amended. b. Documentation that any and all necessary permits and plans have been obtained including but not limited to permits required to meet the state pollution discharge elimination system permit regulations, wetlands permits, county grading permits as well as FEMA conditional letters of map revision. c. The erosion and sediment control plan shall be of sufficient detail to demonstrate, to the satisfaction of the director, compliance with the provisions of DCSM and the state erosion and sediment control handbook, whichever is more restrictive. (3) Pollution prevention plan. A pollution prevention plan, if required by 9VAC25-870-56, must detail the design, installation, implementation, and maintenance of effective pollution prevention measures to minimize the discharge of pollutants. a. At a minimum, such measures must be designed, installed, implemented and maintained to achieve the following: 1. Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Wash waters must be treated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge; 2. Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials present on the site to precipitation and to stormwater; and, 3. Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures. b. The pollution prevention plan shall include effective best management practices to prohibit the following discharges: 1. Wastewater from washout of concrete, unless managed by an appropriate control; 2. Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; 3. Fuels, oils, or other pollutants used in vehicle and equipment operations and maintenance; and, 4. Soaps or solvents used in vehicle equipment washing; c. Discharges from dewatering activities, including discharges from dewatering of trenches and excavations, are prohibited unless managed by appropriate controls. (g) Postconstruction stormwater control. The following shall be the postconstruction stormwater control provisions: (1) Minimum requirements. All development, redevelopment, and land disturbing activities regulated pursuant to this article within the town shall comply with the DCSM and the technical criteria for land disturbing activities set forth in the regulations, as amended, whichever is more stringent, expressly to include 9VAC25-870-62 (applicability), 9VAC25-870-63 (water quality design criteria requirements), 9VAC25-870-65 (water quality compliance), 9VAC25-870-66 (water quantity), 9VAC25-870-69 (offsite compliance options), 9VAC25-870-72 (design storms and hydrologic methods), 9VAC25-870-74 (stormwater harvesting), 9VAC25-870-76 (linear development), 9VAC25-870-85 (stormwater management impoundment structures or facilities), and 9VAC25-870-92 (comprehensive stormwater management plans). (2) Stormwater management plan. A stormwater management plan shall be developed and submitted to the town for all development, redevelopment, and land disturbing activities regulated pursuant to this article, except that the director may execute an agreement in lieu of a stormwater management plan to comply with the requirements of this section. The stormwater management plan shall be implemented as approved or modified by the town. The stormwater management plan must apply the stormwater technical requirements of (1) above to the entire land disturbing activity. Individual lots or parcels in new residential, commercial, or industrial developments shall not be considered separate land-disturbing activities. Instead, the common plan, as a whole, shall be considered to be a single land-disturbing activity. The plan must also consider all sources of surface runoff and all sources of subsurface and groundwater flows converted to surface runoff. The plan shall contain maps, charts, graphs, tables, photographs, narrative descriptions, explanations, calculations, and citations to supporting references as appropriate to communicate the information required by this article. At a minimum, the stormwater management plan must contain the following: a. Information on the type and location of stormwater discharges; information on the features to which stormwater is being discharged including surface waters, and the pre-development and post-development drainage areas. b. Contact information including the name, address, and telephone number of the owner and the tax reference and parcel number of the property or properties affected. c. A narrative that includes a description of current site conditions and final site conditions. d. A general description of the proposed stormwater management facilities and the mechanism through which the facilities will be operated and maintained after construction is complete. e. Information on the proposed stormwater management facilities, including: 1. The type of facilities; 2. Location, including geographic coordinates; 3. Acres treated; and, 4. The surface waters into which the facility will discharge. f. Hydrologic and hydraulic computations, including runoff characteristics. g. Documentation and calculations verifying compliance with the water quality and water quantity requirements of (1) above. h. A map or maps of the site that depicts the topography of the site and includes: 1. All contributing drainage areas; 2. Existing streams, ponds, culverts, ditches, wetlands, other water bodies, and floodplains; 3. Soil types, relevant geological formations, forest cover, and other vegetative areas; 4. Current land use including existing structures, roads, and locations of known utilities and easements; 5. Sufficient information on adjoining parcels to assess the impacts of stormwater from the site on these parcels; 6. The limits of clearing and grading, and the proposed drainage patterns on the site; 7. Proposed buildings, roads, parking areas, utilities, and stormwater management facilities; and, 8. Proposed land use with tabulation of the percentage of surface area to be adapted to various uses, including but not limited to planned locations of utilities, roads, and easements. i. If an operator intends to meet the water quality requirements set forth in (1) above through the use of off-site credits in accordance with section (3), then a letter of availability from the off-site provider must be included. Approved off-site options must achieve the necessary reductions prior to the commencement of the applicant's land-disturbing activity except as otherwise allowed by Code of Virginia, § 62.1-44.15:35. j. Elements of the stormwater management plan that include activities regulated under Code of Virginia Chapter 4 (§ 54.1-400 et seq.) of Title 54.1 shall be appropriately sealed and signed by a professional registered in the Commonwealth of Virginia pursuant to Code of Virginia Article 1 (§ 54.1-400 et seq.) of Chapter 4 of Title 54.1. k. A construction record drawing for permanent stormwater management facilities shall be submitted to the director. The construction record drawing shall be appropriately sealed and signed by a professional registered in the Commonwealth of Virginia certifying that the stormwater facilities have been constructed in accordance with the approved plan. (3) Nutrient credit offsets. a. The director shall allow operators to utilize off-site compliance options in accordance with 9VAC25-870-69 under the following conditions: 1. Less than five acres of land will be disturbed; 2. The postconstruction phosphorus control requirement is less than ten pounds per year; or, 3. At least 75 percent of the required phosphorus nutrient reductions are achieved on-site. If at least 75 percent of the required phosphorus nutrient reductions cannot be met on-site, and the operator can demonstrate to the satisfaction of the director that (i) alternative site designs have been considered that may accommodate on-site best management practices, (ii) on-site best management practices have been considered in alternative site designs to the maximum extent practicable, (iii) appropriate on-site best management practices will be implemented, and, (iv) full compliance with postdevelopment nonpoint nutrient runoff compliance requirements cannot practicably be met on-site, then the required phosphorus nutrient reductions may be achieved, in whole or in part, through the use of off-site compliance options. b. The director may establish criteria for an operator to use nutrient credits in accordance with Code of Virginia, § 62.1-44.15:35 to meet required phosphorus reductions that do not meet the conditions of subsection a of this section. c. Notwithstanding subsections a. and b. of this section, offsite options shall not be allowed: 1. Unless the selected offsite option achieves the necessary nutrient reductions prior to the commencement of the operator's land-disturbing activity. In the case of a phased project, the operator may acquire or achieve offsite nutrient reductions prior to the commencement of each phase of land-disturbing activity in an amount sufficient for each phase. 2. In contravention of local water quality-based limitations at the point of discharge that are (i) consistent with the determinations made pursuant to Code of Virginia, § 62.1-44.19:7 subsection B, (ii) contained in the town's MS4 program plan accepted by the department, or (iii) as otherwise may be established or approved by the state water control board. (4) Stormwater management plan review. a. The director shall review stormwater management plans and shall approve or disapprove a stormwater management plan according to the following: 1. The director shall determine the completeness of a plan in accordance with section (g)(2) of this section, and shall notify the applicant, in writing, of such determination, within 15 calendar days of receipt. If the plan is deemed to be incomplete, the above written notification shall contain the reasons the plan is deemed incomplete. 2. The director shall have an additional 60 calendar days from the date of the communication of completeness to review the plan, except that if a determination of completeness is not made within the time prescribed in subsection a.1, then the plan shall be deemed complete and the director shall have 60 calendar days from the date of submission to review the plan. 3. The director shall review any plan that has been previously disapproved within 45 calendar days of the date of resubmission. 4. During the review period, the plan shall be approved or disapproved and the decision communicated in writing to the person responsible for the land-disturbing activity or his designated agent. If the plan is not approved, the reasons for not approving the plan shall be provided in writing. Approval or denial shall be based on the plan's compliance with the requirements of this chapter. 5. If a plan meeting all requirements of this article is submitted and no action is taken within the time provided above in subsection a.2 for review, the plan shall be deemed approved. b. Approved stormwater plans may be modified as follows: 1. Modifications to an approved stormwater management plan shall be allowed only after review and written approval by the director. The director shall have 60 calendar days to respond in writing either approving or disapproving such request. 2. The director may require that an approved stormwater management plan be amended, within a time prescribed by the director, to address any deficiencies noted during inspection. c. The director shall require the submission of a construction record drawing for permanent stormwater management facilities. The director may elect not to require construction record drawings for stormwater management facilities for which recorded maintenance agreements are not required pursuant to (h) below. (5) Exceptions. a. The director may grant exceptions to the technical requirements of (1) above provided that the exception is the minimum necessary to afford relief, reasonable and appropriate conditions are imposed so that the intent of this article is preserved, granting the exception will not confer any special privileges that are denied in other circumstances, and exception requests are not based on conditions or circumstances that are self-imposed or self-created. Economic hardship alone is not sufficient reason to grant an exception. 1. Exceptions to the requirement that the land-disturbing activity obtain a general permit shall not be given by the director, nor shall the director approve the use of a BMP not found on the Virginia BMP Clearinghouse website or any other control measure duly approved by the department. 2. Exceptions to requirements for phosphorus reductions shall not be allowed unless offsite options otherwise permitted pursuant to 9VAC25-870-69 have been considered and found not available. b. The director may grant exceptions to the water quantity requirements of 9VAC25-870-66 in cases where stormwater detention would conflict with the town's flood management programs. (h) Stormwater management system maintenance. The following shall be the stormwater management system maintenance requirements: (1) Minimum maintenance requirements. The owner of any component of the stormwater management system shall provide adequate maintenance to ensure that the system functions as designed. The following requirements apply to all existing and future facilities constructed in the town: a. The owner shall enter into a maintenance agreement with the town that outlines facility-specific maintenance requirements in accordance with the following: 1. The maintenance agreement shall provide all necessary provisions to ensure compliance with this section and shall be submitted to the director for review and approval prior to the approval of the stormwater management plan in section 14-23(g)(2). 2. Maintenance agreement forms shall be prepared in a format acceptable to the director of public works and the town attorney. 3. The maintenance agreement shall run with the land and be set forth in an instrument recorded in the county land records prior to general permit termination or earlier if required by the director. b. On completion of construction and town approval of a new BMP or system of BMPs, the owner shall enter into a two-year performance for maintenance bond with the town in an amount approved by the director of public works as being equivalent to two years of routine maintenance of the facility. Performance for maintenance bond forms shall be provided by the director of public works. The performance for maintenance bond shall be released only after an inspection by the director of public works determines that the facility has been maintained and functions as designed. c. The owner shall prepare and submit an annual certification of maintenance to the town. 1. Certification shall be made by a registered engineer or licensed surveyor (qualified to perform such routine inspections) using a certification of maintenance form provided by the director of public works. 2. Such certification shall state the general condition of the facility and also state whether the infrastructure is functioning properly as originally designed. 3. If the facility is not functioning as designed, a plan for proposed remedial actions and a timeline for completion shall be noted in the certification report. The plan and timeline for completion are subject to the approval of the director of public works. If the director of public works determines that the proposed plan and timeline for completion is insufficient to protect the public health, safety, and welfare, the owner of the facility must either submit a new plan and timeline, or alternatively, the director may take action in accordance with subsection (d)(2) of this section. Once remedial actions have been completed, the owner shall submit a new certification in accordance with subsections (g)(1)a and b of this section. (2) Inspections and access. The owner shall provide the town with access to the facility to perform quality assurance and performance inspections. Failure to provide access shall be considered a violation of this article under section 14-24. If inadequate maintenance is observed by the town, the owner shall be notified in writing of the actions that must be taken to correct deficiencies along with a specific time for taking corrective action. If the corrective action is not performed within the specified time, the town may perform the necessary corrections and bill the property owner. If the owner fails to reimburse the town within 30 days, the town shall have a lien against the property in the amount of such costs, plus interest at the legal rate, and may enforce same in the same manner as a lien for real property taxes may be enforced. In addition to performing required maintenance, sanctions may be imposed as provided in section 14-24. (3) Applicable facilities. The director of public works shall have the ability to enforce the maintenance requirements noted herein for all stormwater systems within the town's corporate limits to include proposed facilities as well as existing facilities.

(Ord. No. 2007-0-21, § 1(21-5), 11-27-2007; Ord. No. 2014-O-014, § I, 5-13-2014; eff. 7-1-2014)

Ask a question about Leesburg law

Corpus searches the Leesburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.

Use the Leesburg code through the API

This call searches the Leesburg code. Change jurisdiction to the state's code to search its statutes and its cities, or to US for federal law. A free key gives 1,000 searches a month, and the MCP server works with no key.

curl -H "Authorization: Bearer $CORPUS_API_KEY" \
  "https://corpuslaw.us/api/v1/search?q=Program+components&jurisdiction=VA-LEESBURG"

Law search API · Docs · Get a free key · Connect the MCP server