Sec. 34-6. - Construction of building sewer connections—Generally.
In the event an application for connection to any main or public sewer is approved, the connection shall be constructed by the utilities division strictly in accordance with the facts stated in the application and in accordance with department of public works standards. The building sewer shall be constructed with reference to the connections as located by the utilities division. If said connection is to a main or public sewer located in city rights-of-way the utilities division shall construct the connection with clean-out to the street right-of-way line. If the connection is to a main or public sewer located in an easement, the utilities division shall make the connection to the sewer and lay approximately five feet of pipe for the building sewer to be connected. If the connection is to a main or public sewer located in an easement and is to serve an adjoining property, the utilities division shall make the connection to the sewer and construct the service line to the property line of the adjoining property and install a clean-out. The contractor shall notify the utilities division 48 hours prior to excavating building sewer trench, and said trench shall be excavated up to and including the main or public sewer in cases where the sewer is located in an easement.
(Code 1959, § 29-7; Ord. No. O-87-265, § 1, 11-24-87, eff. 1-1-88)