§ 37.1-3 — Definitions
Code of Ordinances, City of Newport News, Virginia (Supp. No. 82: codified through Ordinance No. 8209-26, enacted September 22, 2026) · Newport News City Code § 37.1-3
Corpus is an independent public-information project, not the official City of Newport News website. Stable reference: corpuslaw.us/code/5d5ee33e-95dd-4df6-995d-d8cee538d61f
Sec. 37.1-3. - Definitions.
The following words and terms used in this chapter shall have the following meanings: Adaptation measure means a project, practice, or approach to mitigate or address an impact of climate change including sea-level rise, storm surge, and flooding (including increased or recurrent flooding). Adequate channel means a channel that will convey the designated frequency storm event without overtopping the channel bank nor causing erosive damage to the channel bed or banks. Adequate stormwater management system or adequate system means the stormwater management infrastructure and equipment of the city and all improvements thereto that will convey the designated frequency storm event without overtopping the channel banks, causing erosive damage or flooding. Administrator means the VESMP authority including the staff person or department responsible for administering the VESMP on behalf of the city. Agreement in lieu of a plan means a contract between the VESMP authority and the owner or permittee that specifies methods that shall be implemented to comply with the requirements of the VESMA and this chapter for the construction of a (i) single-family detached residential structure; or (ii) farm building or structure on a parcel of land with a total impervious cover percentage, including the impervious cover from the farm building or structure to be constructed, of less than five percent; such contract may be executed by the VESMP authority in lieu of a formal soil erosion control and/or a stormwater management plan. Agricultural lands means those lands used for the planting and harvesting of crops or plant growth of any kind in the open, pasture, horticulture, dairying, floriculture, or in the raising of poultry and/or livestock, except land used for gardening or landscaping. Applicant means any person submitting a soil erosion control, a stormwater management plan, an Agreement in Lieu, or requesting the issuance of a permit for land-disturbing activities to a VESMP authority for approval in order to obtain authorization to commence a land-disturbing activity. Best management practice or BMP means schedules of activities, prohibitions of practices, maintenance procedures, and other management practices, including both structural and nonstructural practices, to prevent or reduce the pollution of surface waters and groundwater systems. (1) Nonproprietary best management practice means both structural and nonstructural practices to prevent or reduce the pollution of surface waters and groundwater systems that are in the public domain and are not protected by trademark or patent or copyright. (2) Proprietary best management practice means both structural and nonstructural practices to prevent or reduce the pollution of surface waters and groundwater systems that are privately owned and controlled and may be protected by trademark or patent or copyright. Board means the State Water Control Board. Buffer area means an area of natural or established vegetation managed to protect other components of a Resource Protection Area and state waters from significant degradation due to land disturbances. This buffer area consists of three (3) trophic layers: trees, shrubs and ground cover. Canopy tree means a tree that typically reaches thirty-five (35) feet in height or taller when mature. Causeway means a temporary structural span constructed across a flowing watercourse or wetland to allow construction traffic to access the area without causing erosion damage. Certified inspector means an employee or agent of the city who (i) holds a certificate of competence from the board in the area of project inspection; or (ii) is enrolled in the board's training program for project inspection and successfully completes such program within one (1) year after enrollment. Certified plan reviewer means an employee or agent of the city who (i) holds a certificate of competence from the board in the area of plan review; (ii) is enrolled in the board's training program for plan review and successfully completes such program within one (1) year after enrollment; or (iii) is licensed as a professional engineer, architect, certified landscape architect or land surveyor pursuant to Article 1, Chapter 4 of Title 54.1 of the Code of Virginia (1950, as amended). Certified program administrator means an employee or agent of the city who (i) holds a certificate of competence from the board in the area of program administration; or (ii) is enrolled in the board's training program for program administration and successfully completes such program within one (1) year after enrollment. Channel means a natural stream or manmade waterway. Chesapeake Bay Preservation Act land-disturbing activity means a land-disturbing activity including clearing, grading, or excavation that results in a land disturbance equal or greater than two thousand five hundred (2,500) square feet in all areas of jurisdictions designated as subject to the regulations adopted pursuant to the Chesapeake Bay Preservation Act, Code of Virginia, § 62.1-44.15:67, et seq. and the regulations incorporated at 9VAC25-830 of the Virginia Administrative Code. Chesapeake Bay Preservation Act means Article 2.5 (§ 62.1-44.15:67 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia. Chesapeake Bay Preservation Area means any land adopted by the City Council subject to the determination of the City Manager, or designee, on a site-specific basis pursuant to Part III (9VAC25-830-70 et seq.) of the Chesapeake Bay Preservation Area Designation and Management Regulations and § 62.1-44.15:74 of the Code of Virginia. A Chesapeake Bay Preservation Area shall consist of a Resource Protection Area, a Resource Management Area as defined in the Chesapeake Bay Preservation Area Designation and Management Regulations (9VAC25-830), and any designated Industrial Waterfront Intensely Developed Areas. City Manager means the chief administrative officer of the city. Clean Water Act or CWA means the federal Clean Water Act (33 USC § 1251 et seq.), formerly referred to as the Federal Water Pollution Control Act or Federal Water Pollution Control Act Amendments of 1972, Public Law 92-500, as amended by Public Law 95-217, Public Law 95-576, Public Law 96-483, and Public Law 97-117, or any subsequent revisions thereto. Code of Virginia means the laws adopted by the Virginia General Assembly embraced in titles, chapters, articles and sections made effective February 1, 1950, as amended thereafter. Cofferdam means a watertight temporary structure in a river, lake, etc., for keeping the water from an enclosed area that has been pumped dry so that bridge foundations, dams, etc., may be constructed. Common Plan of Development or Sale means a contiguous area where separate and distinct construction activities may be taking place at different times on different schedules. Construction activity means any clearing, grading, or excavation associated with large or small construction activity. Control measure means any BMP, stormwater facility, or other method used to minimize the discharge of water and pollutants to state waters. CWA and regulations means the Clean Water Act and applicable regulations published in the Code of Federal Regulations promulgated thereunder. For the purposes of this chapter, it includes state program requirements. Dam means a barrier to confine or raise water for storage or diversion, to create a hydraulic head, to prevent gully erosion, or to retain soil, rock or other debris. Denuded means a term applied to land that has been physically disturbed and no longer supports vegetative cover. Department means the Virginia Department of Environmental Quality. Developed mixed-use shall mean any property used for both residential living purposes and other non-dwelling use. Developed multifamily residential property shall mean any property used primarily for residential living purposes that contains dwelling units that are stacked vertically or one (1) on top of another and are two (2) or more dwelling units in height. Developed other property shall mean developed property that does not serve a primary purpose of providing permanent dwelling units. Developed property shall mean a parcel of real property that has been altered in whole or in part by the addition of improvements, such as buildings, structures, pavement, compacted gravel, and/or other impervious surfaces. Developed residential property shall mean any property used primarily for residential living purposes that does not have a separate dwelling unit located vertically or stacked above the single dwelling unit's footprint. Development means land disturbance and the resulting landform associated with the construction of residential, commercial, industrial, institutional, recreation, transportation, or utility facilities or structures or the clearing of land for non-agricultural or non-silvicultural purposes. Diameter at breast height (DBH) means the diameter of a tree measured outside its bark at a point four and one-half (4.5) feet above the existing grade. Dike means an earthen embankment constructed to confine or control water, especially one built along the banks of a river to prevent overflow of lowlands; levee. Director shall mean the director of the department of engineering or their designee. Discharge, when used without qualification, means to dispose, deposit, spill, pour, inject, dump, leak or place by any means, or that which is disposed, deposited, spilled, poured, injected, dumped, leaked or placed by any means a pollutant. Discharge of a pollutant means: (1) Any addition of any pollutant or combination of pollutants to state waters from any point source; or (2) Any addition of any pollutant or combination of pollutants to the waters of the contiguous zone or the ocean from any point source other than a vessel or other floating craft which is being used as a means of transportation. This definition includes additions of pollutants into surface waters from: surface runoff that is collected or channeled by man; discharges through pipes, sewers, or other conveyances owned by a state, municipality, or other person that do not lead to a treatment works; and discharges through pipes, sewers, or other conveyances, leading into privately owned treatment works. This term does not include an addition of pollutants by any indirect discharger. District or Soil and Water Conservation District means a political subdivision of the Commonwealth organized in accordance with the provisions of Article 3 (§ 10.1-506 et seq.) of Chapter 5 of Title 10.1 of the Code of Virginia. Disturbed land area means an area cleared or graded as necessary for the construction of improvements including, but not limited to, buildings, roads and drives, parking areas, and sidewalks. Diversion means a channel with a supporting ridge on the lower side constructed across or at the bottom of a slope for the purpose of intercepting surface runoff. Dormant means denuded land that is not actively being brought to a desired grade or condition. Drainage area means a land area, water area, or both from which runoff flows to a common point. Dripline means a vertical projection to the ground surface from the furthest tips of a tree's leaf canopy. Dwelling unit shall mean a single housing unit, mobile home, townhouse, condominium or apartment providing complete, independent living facilities for one (1) or more persons, including provisions for living, sleeping, eating, cooking and sanitation. Energy dissipator means a nonerodible structure which reduces the velocity of concentrated flow to reduce its erosive effects. Environmental Protection Agency or EPA means the United States Environmental Protection Agency. Equivalent residential unit (ERU) shall mean the equivalent impervious area of the developed residential property class per dwelling unit located within the city based on the statistical average horizontal impervious area of developed residential property in the city. One (1) ERU shall equal one thousand seven hundred seventy-seven (1,777) square feet of impervious surface area. Erosion and sediment control plan means a document containing material for the conservation of soil and water resources of a unit or group of units of land. It may include appropriate maps, an appropriate soil and water plan inventory and management information with needed interpretations, and a record of decisions contributing to conservation treatment. The plan shall contain all major conservation decisions to ensure that the entire unit or units of land will be so treated to achieve the conservation objectives. Erosion impact area means an area of land that is not associated with a current land-disturbing activity but is subject to persistent soil erosion resulting in the delivery of sediment onto neighboring properties or into state waters. This definition shall not apply to any lot or parcel of land of ten thousand (10,000) square feet or less used for residential purposes or to shorelines where the erosion results from wave action or other coastal processes. ERU rate shall mean the service charge fee charged for one (1) ERU as established in this article. ESC means erosion and sediment control. Farm building or structure means the same as that term is defined in § 36-97 of the Code of Virginia and also includes any building or structure used for agritourism activity, as defined in § 3.2-6400 of the Code of Virginia, and any related impervious services including roads, driveways, and parking areas. Flood fringe means the portion of the floodplain outside the floodway that is usually covered with water from the one hundred-year flood or storm event. This includes the flood or floodway fringe designated by the Federal Emergency Management Agency. Flooding means a volume of water that is too great to be confined within the banks or walls of the stream, water body, or conveyance system and that overflows onto adjacent lands, thereby causing or threatening damage. Floodplain means the area adjacent to a channel, river, stream, or other water body that is susceptible to being inundated by water normally associated with the one (1) percent annual flood or storm event. This includes the floodplain designated by the Federal Emergency Management Agency. Flood-prone area means the component of a natural or restored stormwater conveyance system that is outside the main channel. Flood-prone areas may include the floodplain, the floodway, the flood fringe, wetlands, riparian buffers, or other areas adjacent to the main channel. Floodway means the channel of a river or other watercourse and the adjacent land areas, usually associated with flowing water, that must be reserved in order to discharge the one (1) percent annual flood or storm event without cumulatively increasing the water surface elevation more than one (1) foot. This includes the floodway designated by the Federal Emergency Management Agency. Flume means a constructed device lined with erosion-resistant materials intended to convey water on steep grades. General permit means a permit authorizing a category of discharges under the CWA and the VESMA within a geographical area. Groundwater means all subsurface water, including, but not limited to, that part within the zone of saturation. Highly erodible soils means soils which have an erodibility index of eight (8) which is the generally accepted threshold at which the rate of soil loss becomes critical in relation to soil replacement, resulting in severe soil erosion. The equation for the erodibility index is EI=RKLS/T, where: R = the rainfall and runoff factor; K = the soil susceptibility to water erosion; LS = the combined effects of slope length and steepness; and T = the soil loss tolerance. The identified highly erodible soils in the city are: 16D Craven-Uchee Complex, 16C Craven-Uchee Complex, 21B Slagle fine sandy loam, and 9B Craven fine sandy loam. Hydrologic Unit Code or HUC means a watershed unit established in the most recent version of Virginia's 6th Order National Watershed Boundary Dataset unless specifically identified as another order. Impervious cover means a surface composed of any material which significantly impedes or prevents natural infiltration of water into the soil including, but not limited to buildings and other structures and their components, streets, parking, and any concrete, asphalt, compacted gravel surface, or any other resistant surface. Natural waterbodies and open, uncovered retention/detention facilities shall not be considered as impervious surfaces. Impervious surface area means a surface that is covered with material that is resistant to infiltration by water, including, but not limited to, most conventionally surfaced streets, roofs, sidewalks, parking lots and other similar structures. "Conventionally surfaced" includes concrete, asphalt, compacted gravel, and any other resistant surface. Incorporated place means a city, town, township, or village that is incorporated under the Code of Virginia. Industrial wastes means liquid or other wastes resulting from any process of industry, manufacture, trade or business, or from the development of any natural resources. Industrial waterfront intensely developed area (industrial waterfront IDA or IWIDA) means any portion of Chesapeake Bay Preservation Area so designated by the City Council. Industrial waterfront IDAs are industrial areas located along the shoreline that, because of the intensity of their use, are characterized by an absence of natural environmental features and a preponderance of impervious surface and bulkheaded or riprapped shoreline. Infiltration facility means a stormwater management facility which temporarily stores stormwater and discharges it via infiltration through the surrounding soil. Inspection means an on-site review of the project's compliance with the approved plan, the local stormwater management program, a state-issued stormwater construction general or individual permit as applicable, and any applicable design criteria, conduct surveys or investigations necessary in the implementation or enforcement of the VESMA and applicable regulations. Karst area means any land area predominantly underlain at the surface or shallow subsurface by limestone, dolomite, or other soluble bedrock regardless of any obvious surface karst features. Karst features means sinkholes, sinking and losing streams, caves, large flow springs, and other such landscape features found in karst areas. Land disturbance or land-disturbing activity means a manmade change to the land surface that may result in soil erosion or has the potential to change its runoff characteristics, including construction activity such as the clearing, grading, excavating, or filling of land, except that the term shall not include those exemptions specified in § 62.1-44.15:34 of the Code of Virginia. Land-disturbance approval means an approval, allowing a land-disturbing activity to commence, issued by the VESMP authority after the requirements of § 62.1-44.15:34 of the Code of Virginia have been met. Landward fifty (50) feet of Resource Protection Area (RPA) buffer means the fifty (50) feet of the RPA one hundred-foot buffer which resides between the seaward fifty (50) feet of RPA and Resource Management Area (RMA) components identified in section 37.1-49(a)(2). Large construction activity means construction activity including clearing, grading, and excavation, except operations that result in the disturbance of less than five (5) acres of total land area. Large construction activity also includes the disturbance of less than five (5) acres of total land area that is a part of a larger common plan of development or sale if the larger common plan will ultimately disturb five (5) acres or more. Large construction activity does not include routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original purpose of the facility. Layout means a conceptual drawing sufficient to provide for the specified stormwater management facilities required at the time of approval. Linear development project means a land-disturbing activity that is linear in nature such as, but not limited to, (i) the construction of electric and telephone utility lines, and natural gas pipelines; (ii) construction of tracks, rights-of-way, bridges, communication facilities and other related structures of a railroad company; (iii) highway construction projects; (iv) construction of stormwater channels and stream restoration activities; and (v) water and sewer lines. Private subdivision roads or streets shall not be considered linear development projects. Live watercourse means a definite channel with bed and banks within which concentrated water flows continuously. Local erosion and sediment control program or local control program means an outline of the various methods employed by the city to regulate land-disturbing activities and thereby minimize erosion and sedimentation in compliance with the state program and may include such items as local ordinances, policies and guidelines, technical materials, inspection, enforcement, and evaluation. Locality means the City of Newport News. Localized flooding means smaller scale flooding that may occur outside of a stormwater conveyance system. This may include high water, ponding, or standing water from stormwater runoff, which is likely to cause property damage or unsafe conditions. Main channel means the portion of the stormwater conveyance system that contains the base flow and small frequent storm events. Manmade means constructed by man. Map means the Chesapeake Bay Preservation Area Map. Mature tree means a canopy tree with a Diameter at Breast Height (DBH) of twelve (12) inches or greater or an understory tree with a DBH of four (4) inches or greater. Minimize means to reduce or eliminate the discharge of pollutants to the extent achievable using stormwater controls that are technologically available and economically practicable. Minor modification means modifications and amendments to an existing general permit before its expiration not requiring extensive review and evaluation including changes in EPA promulgated test protocols, increasing monitoring frequency requirements, changes in sampling locations, and changes to compliance dates within the overall compliance schedules. A minor permit modification or amendment does not substantially alter permit conditions, substantially increase or decrease the amount of surface water impacts, increase the size of the operation, or reduce the capacity of the facility to protect human health or the environment. Municipal Separate Storm Sewer System or MS4 means the storm sewer system owned or operated by the city. Nature-based solution means an approach that reduces the impacts of sea-level rise, flooding, and storm events through the use of environmental processes and natural systems. Natural channel design concepts means the utilization of engineering analysis and fluvial geomorphic processes to create, rehabilitate, restore, or stabilize an open conveyance system for the purpose of creating or recreating a stream that conveys its bankfull storm event within its banks and allows larger flows to access its bankfull bench and its floodplain. Natural stream means a tidal or nontidal watercourse that is part of the natural topography. It usually maintains a continuous or seasonal flow during the year and is characterized as being irregular in cross-section with a meandering course. Constructed channels such as drainage ditches or swales shall not be considered natural streams; however, channels designed utilizing natural channel design concepts may be considered natural streams. Nonerodible means a material, e.g., riprap, concrete, plastic, etc., that will not experience surface wear due to natural forces. Nonpoint source pollution means pollution such as sediment, nitrogen, phosphorous, hydrocarbons, heavy metals, and toxic substances whose sources cannot be pinpointed but rather are washed from the land surface in a diffuse manner by stormwater runoff. Nontidal wetlands means those wetlands other than tidal wetlands that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support a prevalence of vegetation typically adapted for life in saturated soil conditions, as defined by the U.S. Environmental Protection Agency, in 33 C.F.R. 328.3b. Noxious weeds means non-native weeds that are difficult to control effectively, including, but not limited to Johnson Grass, Kudzu, and multiflora rose. Onsite stormwater management facilities means facilities which are designed to control stormwater runoff emanating from a specific site. Operator means the owner or operator of any facility or activity subject to the VESMA and this chapter. In the context of stormwater associated with a large or small construction activity, operator means any person associated with a construction project that meets either of the following two (2) criteria: (i) the person has direct operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications; or (ii) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other permit or VESMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). Other waste means materials that can adversely affect waters of the United States should they be discharged into same, including, but not limited to, garbage, refuse, lime, fertilizer, ashes, offal, tar, paint, solvents, petroleum products, antifreeze and chemicals. Owner means the same as that term is defined in § 62.1-44.3 of the Code of Virginia. For a regulated land-disturbing activity that does not require a permit, owner also means the owner or owners of the freehold of the premises or lesser estate therein, mortgagee or vendee in possession, assignee of rents, receiver, executor, trustee, lessee, or other person, firm, or corporation in control of a property. Peak flow rate means the maximum instantaneous flow from a prescribed design storm at a particular location. Percent impervious means the impervious area within the site divided by the area of the site multiplied by one hundred (100). Permit or VESMP Authority Permit means an approval to conduct a land-disturbing activity issued by the Administrator for the initiation of a land-disturbing activity, in accordance with this article, and which may only be issued after evidence of general permit coverage has been provided by the Department. Permittee means the person to whom the VESMP Authority Permit is issued. Person means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, county, city, town, or other political subdivision of the Commonwealth, governmental body, including a federal or state entity as applicable, any interstate body, or any other legal entity. Plan-approving authority means the city manager, or designee, who is responsible for determining the adequacy of a conservation plan submitted for land-disturbing activities on a unit or units of lands and for approving plans. Plan of development means the development of a plan for review and approval by the VESMA to ensure compliance with § 62.1-44.15:74 of the Code of Virginia and this article, prior to any clearing or grading of a site or the issuance of a building permit. Point of discharge means a location at which concentrated stormwater runoff is released. Point source means any discernible, confined, and discrete conveyance including any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, rolling stock, concentrated animal feeding operation, landfill leachate collection system, vessel, or other floating craft from which pollutants are or may be discharged. This term does not include return flows from irrigated agriculture or agricultural stormwater runoff. Pollutant discharge means the average amount of a particular pollutant measured in pounds per year or other standard reportable unit as appropriate, delivered by stormwater runoff. Pollutant means dredged spoil, solid waste, incinerator residue, filter backwash, sewage, garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive materials (except those regulated under the Atomic Energy Act of 1954, as amended (42 USC § 2011 et seq.)), heat, wrecked or discarded equipment, rock, sand, cellar dirt and industrial, municipal, and agricultural waste discharged into water. It does not mean: (1) Sewage from vessels; or (2) Water, gas, or other material that is injected into a well to facilitate production of oil or gas, or water derived in association with oil and gas production and disposed of in a well if the well used either to facilitate production or for disposal purposes is approved by the Board and if the Board determines that the injection or disposal will not result in the degradation of ground or surface water resources. Pollution means such alteration of the physical, chemical, or biological properties of any state waters as will or is likely to create a nuisance or render such waters (a) harmful or detrimental or injurious to the public health, safety, or welfare, or to the health of animals, fish or aquatic life; (b) unsuitable with reasonable treatment for use as present or possible future sources of public water supply; or (c) unsuitable for recreational, commercial, industrial, agricultural, or other reasonable uses, provided that (i) an alteration of the physical, chemical, or biological property of state waters, or a discharge or deposit of sewage, industrial wastes or other wastes to state waters by any owner which by itself is not sufficient to cause pollution, but which, in combination with such alteration of or discharge or deposit to state waters by other owners, is sufficient to cause pollution; (ii) the discharge of untreated sewage by any owner into state waters; and (iii) contributing to the contravention of standards of water quality duly established by the State Water Control Board, are pollution for the terms and purposes of this chapter. Post-development refers to conditions that reasonably may be expected or anticipated to exist after completion of the land development activity on a specific site or tract of land. Predevelopment refers to the conditions that exist at the time that plans for the land-disturbing activity are submitted to the VESMP authority. Where phased development or plan approval occurs (preliminary grading, demolition of existing structures, roads and utilities, etc.), the existing conditions at the time prior to the commencement of land-disturbing activity shall establish predevelopment conditions. Prior developed lands means land that has been previously utilized for residential, commercial, industrial, institutional, recreation, transportation, or utility facilities or structures, and that will have the impervious areas associated with those uses altered during a land-disturbing activity. Public roads means a publicly-owned road designed and constructed in accordance with water quality protection criteria at least as stringent as requirements applicable to the Virginia Department of Transportation, including regulations promulgated pursuant to the Virginia Erosion and Stormwater Management Act § 62.1-44.15:24. This definition includes those roads where the Virginia Department of Transportation exercises direct supervision over the design or construction activities, or both, and cases where secondary roads are constructed or maintained, or both, in accordance with city standards. Qualified personnel means a person knowledgeable in the principles and practices of erosion and sediment and stormwater management controls who possesses the skills to assess conditions at the construction site for the operator that could impact stormwater quality and quantity and to assess the effectiveness of any sediment and erosion control measures or stormwater management facilities selected to control the quality and quantity of stormwater discharges from the construction activity. Redevelopment means the process of developing land that is currently or has been previously developed; provided that a parcel must be or have had impervious improvements within the five (5) years preceding the proposed development. Regional (watershed wide) stormwater management facility or regional facility means a facility or series of facilities designed to control stormwater runoff from a large contributing area, although only portions of the watershed may experience land development. Regional stormwater management plan or regional plan means a document containing material describing how runoff from open space, existing development and future planned development areas within a watershed will be controlled by coordinated design and implementation of regional stormwater management facilities. Regulations means the Virginia Stormwater Management Regulations (9VAC25-875). Resource Management Area (RMA) means that component of the Chesapeake Bay Preservation Area that is not classified as the Resource Protection Area. RMAs include land types that, if improperly used or developed, have the potential for causing significant water quality degradation or for diminishing the functional value of a Resource Protection Area. Resource Management Area components. See section 37.1-49(a)(2). Resource Protection Area (RPA) means that component of the Chesapeake Bay Preservation Area comprised of lands adjacent to water bodies with perennial flow that have an intrinsic water quality value due to the ecological and biological processes they perform or are sensitive to impacts which may result in significant degradation to the quality of state and local waters. Resource Protection Area components. See section 37.1-49(a)(1). Responsible land disturber or RLD means a person holding a certificate issued by the department who is responsible for carrying out the land-disturbing activity in accordance with the approved erosion and sediment control plan. The RLD may be the owner, applicant, permittee, designer, superintendent, project manager, contractor, or any other project or development team member. The RLD must be designated on the erosion and sediment control plan, ESM plan, or permit as defined in this article as a prerequisite for engaging in land disturbance. In the absence of a specific responsible land disturber certificate issued by the Virginia Department of Conservation and Recreation, persons having the following are automatically considered to be responsible land disturbers: (1) persons holding combined administrator, administrator, plan reviewer, inspector, or contractor certificates issued by the Virginia Department of Environmental Quality; and (2) persons holding a valid professional engineer, land surveyor, landscape architect, or architect license issued by the Commonwealth of Virginia. The responsible land disturber cannot be an employee of any local department of conservation and recreation program authority or of the city (the local permit issuing authority). Runoff or stormwater runoff means that portion of precipitation that is discharged across the land surface or through conveyances to one (1) or more waterways. Runoff characteristics includes maximum velocity, peak flow rate, volume, and flow duration. Runoff volume means the volume of water that runs off the land development project from a prescribed storm event. Sanitary sewer means a system of underground conduits that collect and deliver sanitary wastewater to a wastewater treatment or pumping facility. Seaward fifty (50) feet of Resource Protection Area buffer means the fifty (50) feet of the RPA one hundred-foot buffer adjacent to RPA components identified in section 37.1-49(a)(1)a., b. and c. Sediment basin means a temporary impoundment built to retain sediment and debris with a controlled stormwater release structure. Sediment trap means a temporary impoundment built to retain sediment and debris which is formed by constructing an earthen embankment with a stone outlet. Service charge shall mean the user fee based upon the ERU rate applied to property owners of developed residential property, developed multifamily residential property and developed other property. Sewage means the water-carried human wastes from residences, buildings, industrial establishments or other places, together with such industrial wastes, stormwater or other water as may be present. Shore erosion control project means an erosion control project approved by local wetlands boards, the Virginia Marine Resources Commission, the Virginia Department of Environmental Quality or the United States Army Corps of Engineers and located on tidal waters and within nonvegetated or vegetated wetlands as defined in Title 28.2 of the Code of Virginia. Silvicultural activities means forest management activities, including but not limited to the harvesting of timber, the construction of roads and trails for forest management purposes, and the preparation of property for reforestation that are conducted in accordance with the silvicultural best management practices developed and enforced by the state forester pursuant to § 10.1-1105 of the Code of Virginia and are located on property defined as real estate devoted to forest use under § 58.1-3230 of the Code of Virginia. Site means the land or water area where any facility or land-disturbing activity is physically located or conducted, including adjacent land used or preserved in connection with the facility or land-disturbing activity. Areas channelward of mean low water in tidal Virginia shall not be considered part of a site. Site hydrology means the movement of water on, across, through, and off the site as determined by parameters including soil types, soil permeability, vegetative cover, seasonal water tables, slopes, land cover, and impervious cover. Slope drain means tubing or conduit made of nonerosive material extending from the top to the bottom of a cut or fill slope with an energy dissipator at the outlet end. Small construction activity means: (1) Construction activities including clearing, grading, and excavating that result in land disturbance of equal to or greater than one (1) acre and less than five (5) acres. Small construction activity also includes the disturbance of less than one (1) acre of total land area that is part of a larger common plan of development or sale if the larger common plan will ultimately disturb equal to or greater than one (1) and less than five (5) acres. Small construction activity does not include routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original purpose of the facility. (2) Any other construction activity designated by either the department or the EPA regional administrator, based on the potential for contribution to a violation of a water quality standard or for significant contribution of pollutants to surface waters. Soil erosion means the movement of soil by wind or water into state waters or onto lands in the Commonwealth. Soil erosion control and stormwater management plan means a document describing methods for controlling soil erosion and managing stormwater in accordance with the requirements adopted pursuant to the VESMA. The ESM plan may consist of aspects of the erosion and sediment control plan and the stormwater management plan as each is described in this chapter. Stabilized means land that has been treated to withstand normal exposure to natural forces without incurring erosion damage. State means the Commonwealth of Virginia. State Board means the Virginia Soil and Water Conservation Board. State Construction General Permit or CGP means an approval to conduct a land-disturbing activity issued by the State Board in the form of a state stormwater individual permit or coverage issued under a state general permit or an approval issued by the State Board for stormwater discharges from an MS4. Under these state permits, the Commonwealth imposes and enforces requirements pursuant to the Federal Clean Water Act and regulations, the Virginia Stormwater Management Act and the Regulations. State erosion and sediment control program or state program means the program administered by the board as it relates to this chapter, including regulations designed to minimize erosion and sedimentation. State project means the construction of any facility or expansion of an existing facility including, but not limited to land clearing, soil movement, or land development, which is undertaken by any state agency, board, commission, authority or any branch of state government, including state supported institutions of higher learning. State Water Control Law means Chapter 3.1 (§ 62.1-44.2 et seq.) of Title 62.1 of the Code of Virginia. State waters means all water, on the surface and under the ground, wholly or partially within or bordering the Commonwealth or within its jurisdiction, including wetlands. Storm sewer inlet means a structure through which stormwater is introduced into an underground conveyance system. Storm sewer system means the system of roads, streets, catch basins, curbs, gutters, ditches, pipes, lakes, ponds, channels, storm drains and other facilities designed or used for collecting, storing or conveying stormwater or through which stormwater is collected, stored or conveyed. Stormwater means precipitation that is discharged across the land surface or through conveyances to one (1) or more waterways and that may include stormwater runoff, snow melt runoff, and surface runoff and drainage. Stormwater conveyance system means a combination of drainage components that are used to convey stormwater discharge, either within or downstream of the land-disturbing activity. This includes: (1) Manmade stormwater conveyance system means a pipe, ditch, vegetated swale, or other stormwater conveyance system constructed by man except for restored stormwater conveyance systems; (2) Natural stormwater conveyance system means the main channel of a natural stream and the flood-prone area adjacent to the main channel; or (3) Restored stormwater conveyance system means a stormwater conveyance system that has been designed and constructed using natural channel design concepts. Restored stormwater conveyance systems include the main channel and the flood-prone area adjacent to the main channel. Stormwater detention means the process of temporarily impounding runoff and discharging it through a hydraulic outlet structure to a downstream conveyance system. Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including the quantity and quality, the period of release or the velocity of flow. Stormwater management plan means a document containing material describing methods for complying with the requirements of the VESMP. Stormwater management revenues or revenues shall mean all rates, service charges, fees, assessments, rentals, other charges or other income received in connection with the management and operation of the system, including amounts received from the investment or deposit of money in any fund or account and any amounts contributed by the city council from general revenues of the city. Stormwater management system or system shall mean the stormwater management infrastructure and equipment of the city and all improvements thereto. Infrastructure and equipment shall include structural and natural stormwater control facilities of all types including, without limitation, retention and detention basins, conduits, pumping stations, and other plants, structures, and real and personal property used for support of the system. Stormwater Pollution Prevention Plan or SWPPP means a document that is prepared in accordance with good engineering practices and that identifies potential sources of pollutants that may reasonably be expected to affect the quality of stormwater discharges. A SWPPP required under the VESMP for construction activities shall identify and require the implementation of control measures and shall include or incorporate by reference an approved erosion and sediment control plan, an approved stormwater management plan, and a pollution prevention plan. Subdivision means the same as defined in the City Code of Ordinances Appendix B (Subdivision Regulations), Article II (Definitions). Surface runoff means stormwater runoff from rain, snow or other forms of precipitation. Surface waters means: (1) All waters that are currently used, were used in the past, or may be susceptible to use in interstate or foreign commerce, including all waters that are subject to the ebb and flow of the tide; (2) All interstate waters, including interstate wetlands; (3) All other waters such as intrastate lakes, rivers, streams (including intermittent streams), mudflats, sandflats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, or natural ponds the use, degradation, or destruction of which would affect or could affect interstate or foreign commerce including any such waters: a. That are or could be used by interstate or foreign travelers for recreational or other purposes; b. From which fish or shellfish are or could be taken and sold in interstate or foreign commerce; or c. That are used or could be used for industrial purposes by industries in interstate commerce; (4) All impoundments of waters otherwise defined as surface waters under this definition; (5) Tributaries of waters identified in subdivisions 1 through 4 of this definition; (6) The territorial sea; and (7) Wetlands adjacent to waters (other than waters that are themselves wetlands) identified in subdivisions 1 through 6 of this definition. (8) Waste treatment systems, including treatment ponds or lagoons designed to meet the requirements of the CWA and the law, are not surface waters. Surface waters do not include prior converted cropland. Notwithstanding the determination of an area's status as prior converted cropland by any other agency, for the purposes of the CWA, the final authority regarding the CWA jurisdiction remains with the EPA. SWM means stormwater management. Temporary vehicular stream crossing means a temporary nonerodible structural span installed across a flowing watercourse for use by construction traffic. Structures may include bridges, round pipes or pipe arches constructed on or through nonerodible material. Ten-year storm means a storm that is capable of producing rainfall expected to be equaled or exceeded on the average of once in ten (10) years. It may also be expressed as an exceedance probability with a ten (10) percent chance of being equaled or exceeded in any given year. Tidal shore means the area of land between mean low water level and mean high water level. Tidal wetlands means vegetated and non-vegetated wetlands as defined in § 28.2-1300 of the Code of Virginia, as amended. Total maximum daily load or TMDL means the sum of the individual wasteload allocations for point sources, load allocations (LAs) for nonpoint sources, natural background loading, and a margin of safety. TMDLs can be expressed in terms of either mass per time, toxicity, or other appropriate measure. The TMDL process provides for point versus nonpoint source trade-offs. Two-year storm means a storm that is capable of producing rainfall expected to be equaled or exceeded on the average of once in two (2) years. It may also be expressed as an exceedance probability with a fifty (50) percent chance of being equaled or exceeded in any given year. Understory tree means a tree that typically reaches twelve (12) feet to thirty-five (35) feet in height when mature. Undeveloped property (stormwater utility) shall mean any parcel that is in a natural state with no impervious area, such that the topography or soils on the property have not been altered to the extent that the rate of surface infiltration of stormwater has been affected. Usable land area means not less than eighty (80) percent of the minimum lot area required by the zoning ordinance (chapter 45 of the City Code) shall be usable land by reason of elevation above flood level and not less than fifty (50) percent of such required minimum lot area shall be usable by reason of absence of easements or servitudes; provided, however, that all of the minimum area required for the building itself together with its required front, side and rear yard lines shall be usable land landward of the Resource Protection Area (RPA). Virginia Erosion and Stormwater Management Act or VESMA means Article 2.3 (§ 62.1- 44.15:24 et seq.) of Chapter 3.1, State Water Control Law, of Title 62.1 of the Code of Virginia. Virginia Erosion and Stormwater Management Program or VESMP means a program established by the VESMP authority for the effective control of soil erosion and sediment deposition and the management of the quality and quantity of runoff resulting from land-disturbing activities to prevent the unreasonable degradation of properties, stream channels, waters, and other natural resources. The program shall include such items as local ordinances, rules, requirements for permits and land-disturbance approvals, policies and guidelines, technical materials, and requirements for plan review, inspection, and enforcement consistent with the requirements of the VESMA. Virginia Erosion and Stormwater Management Program authority or VESMP authority means the locality or the locality's designated entity approved by the department to operate the VESMP. Virginia Pollutant Discharge Elimination System (VPDES) permit or VPDES permit means a document issued by the department pursuant to the State Water Control Law authorizing, under prescribed conditions, the potential or actual discharge of pollutants from a point source to surface waters. Virginia Stormwater BMP Clearinghouse means a collection that contains detailed design standards and specifications for control measures that may be used in Virginia to comply with the requirements of the VESMA and associated regulations. Virginia Stormwater Management Handbook means a collection of pertinent information that provides general guidance for compliance with the VESMA and associated regulations and is developed by the department with advice from a stakeholder advisory committee. Wasteload allocation or wasteload means the portion of a receiving surface water's loading or assimilative capacity allocated to one (1) of its existing or future point sources of pollution. Wasteload allocations are a type of water quality-based effluent limitation. Water-dependent facility means a development of land that cannot exist outside the Resource Protection Area and must be located on the shoreline by reason of the intrinsic nature of its operation. These facilities include: (1) Beaches and other public water-oriented recreation areas. (2) Dry docks. (3) Fisheries or other marine resource facilities. (4) Fueling areas associated with marinas or marine vessels. (5) Intake and outfall structures of power plants, water treatment plants, sewage treatment plants, and storm sewers. (6) Loading, unloading and freight staging areas necessary for the convenient and efficient operation of ports and marinas (including staging areas for dry and liquid bulk and "high and dry" automated boat storage equipment). (7) Marinas and other boat docking structures (including all utility lines necessary for convenient and efficient operations). (8) Mooring slips, docks, piers, ports, buoys, launch ramps, access roads and paths necessary to conveniently and efficiently serve these facilities. (9) Nature study and passive recreation facilities with no structures or impervious surfaces. (10) Rail lines, conveyor systems and other related facilities necessary for convenient and efficient servicing and loading or unloading water-transported goods. (11) Seafood off-landing, handling or processing for water-transported seafood. (12) Shipbuilding, repair and maintenance yards. (13) Water-dependent portions of research facilities operated by educational institutions. Water quality technical criteria means standards set forth in regulations adopted pursuant to the VESMA that establish minimum design criteria for measures to control nonpoint source pollution. Water quantity technical criteria means standards set forth in regulations adopted pursuant to the VESMA that establish minimum design criteria for measures to control localized flooding and stream channel erosion. Watershed means a defined land area drained by a river or stream, karst system, or system of connecting rivers or streams such that all surface water within the area flows through a single outlet. In karst areas, the karst feature to which water drains may be considered the single outlet for the watershed. Wetlands means those areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas.
(Ord. No. 8009-24)
Ask a question about Newport News law
Corpus searches the Newport News sections it holds and shows the ones that match, with their citations. Free, no sign-in.
