For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 38-67 — Schedule

Code of Ordinances, City of Newport News, Virginia (Supp. No. 82: codified through Ordinance No. 8209-26, enacted September 22, 2026) · Newport News City Code § 38-67

Corpus is an independent public-information project, not the official City of Newport News website. Stable reference: corpuslaw.us/code/0aa7c791-615f-4ff6-b62a-362aab0fc8a8

Sec. 38-67. - Schedule.

(a) Minimum permit and inspection fees for work for which a permit is required by this article shall be required in accordance with the following schedule except as otherwise specifically established by franchise agreement: Residential Apron | $75.00 Test Pit/Core | $75.00 Multiple Family/Commercial/Industrial/Utility— Single Location (single pole replacement, single meter assembly, reconnection, etc.) | $100.00 + $100.00 per month or fraction thereof of work duration. Utility—Linear (work that runs longitudinally with the right-of-way or spanning multiple parcels) | $100.00 + $2.50 per linear foot of the project. Blanket permit for tree trimming | $300.00 Renewal Fee—Residential | $75.00 Renewal/Extension Fee—MF/Comm/Ind/Utility Single Location | $250.00 per month or fraction thereof of extension of work period. Renewal/Extension Fee—Linear | $600.00 per month or fraction thereof of the extension of work period. (b) In lieu of separate permits for tree trimming, utilities regularly performing tree trimming within the various rights-of-way and easements of the city may apply for and be issued a blanket permit by the director of engineering pursuant to stated conditions and for a period not to exceed one (1) year. Such permit shall be issued only for work which does not entail the disruption of a right-of-way or easement and may be issued upon payment of an annual inspection fee of three hundred dollars ($300.00). (c) The renewal/extension fee may be waived or reduced by the director of engineering for good cause shown. (d) Permit fees are non-refundable. (e) All permit holders shall call for a city inspection prior to any work, prior to closure of the permit and any other times as deemed necessary by the city. Any projects completed without the required inspections shall be subject to the renewal fees as outlined in section 38-67(a). (f) Permit holders accumulating more than ten (10) expired permits will not be issued any new permits until the number of expired permits is reduced to ten (10) or less. (g) Classification of the work shall be made by the director of engineering or his designee.

(Ord. No. 62, § 26; Code 1961, § 36-61; Ord. No. 3051-83; Ord. No. 3111-83, § 1; Ord. No. 3223-84; Ord. No. 5933-03, § 1; Ord. No. 6863-12, § 1; Ord. No. 7271-16, § 1; Ord. No. 8069-25, § 1; Ord. No. 8154-26, § 1)

Ask a question about Newport News law

Corpus searches the Newport News sections it holds and shows the ones that match, with their citations. Free, no sign-in.