§ 15-2 — Definitions
Code of the City of Norfolk, Virginia (Supp. No. 166: codified through Ordinance No. 50,383, adopted June 9, 2026) · Norfolk City Code § 15-2
Corpus is an independent public-information project, not the official City of Norfolk website. Stable reference: corpuslaw.us/code/012fb805-989a-4d04-b62a-454d43dd4c15
Sec. 15-2. - Definitions.
As used in this chapter, unless the context requires a different meaning, the following definitions shall have the meanings set out below: Agreement in lieu of a plan: A contract between the city and the owner that specifies conservation measures that must be implemented in the construction of a single-family residence; this contract may be executed by the city in lieu of a formal site plan. Applicant: Any person submitting an erosion and sediment control plan for approval or requesting the issuance of a permit, when required, authorizing land-disturbing activities to commence. Board: Virginia Department of Soil and Water Conservation Board. Chesapeake Bay Preservation Area or CBPA: Any land designated by the city pursuant to Part III of the Chesapeake Bay Preservation Area Designation and Management Regulations, 9 VAC 10-20-70, and section 62.1-44.15:52 of the Code of Virginia. A Chesapeake Bay Preservation Area consists of a resource protection area, intensely developed area, and a resource management area. The general limits of the CBPA are shown on the official zoning map and the general requirements pertaining to CBPAs are detailed in section 11-2 of the zoning ordinance. Construction footprint: The area of impervious surface, including, but not limited to, buildings, roads and drives, parking areas, sidewalks, and the area necessary for construction of such improvements. Erosion and sediment control plan, conservation plan or plan: A document containing material for the conservation of soil and water resources of a unit or group of units of land. It may include appropriate maps, an appropriate soil and water plan inventory, and management information with needed interpretations and a record of decisions contributing to conservation treatment. The plan shall contain all major conservation decisions and all information deemed necessary by the plan-approving authority to assure that the entire unit or units of land will be so treated to achieve the conservation objectives. Erosion impact area: An area of land not associated with current land-disturbing activity but subject to persistent soil erosion resulting in the delivery of sediment onto neighboring properties or into state waters. This definition shall not apply to any lot or parcel of land ten thousand (10,000) square feet or less used for residential purposes or to shorelines where the erosion results from wave action or other coastal processes. Land disturbance or land-disturbing activity: Any man-made change to the land surface, including, but not limited to, clearing, grading, excavating, transporting and filling of land, or other construction activities which would disturb the natural vegetation or the existing contours of the land, which may result in soil erosion from water or wind and the movement of sediments into public or private storm drainage facilities, state waters, or onto lands in the commonwealth. Natural channel design concepts: The utilization of engineering analysis and fluvial geomorphic processes to create, rehabilitate, restore, or stabilize an open conveyance system for the purpose of creating or recreating a stream that conveys its bankfull storm event within its banks and allows larger flows to access its bankfull bench and its floodplain. Owner: The owner or owners of the freehold of the premises or lesser estate therein, a mortgagee or vendee in possession, assignee of rents, receiver, executor, trustee, lessee or other person, firm or corporation in control of a property. Peak flow rate: The maximum instantaneous flow from a given storm condition at a particular location. Permittee: The person to whom the permit authorizing land-disturbing activities is issued or the person who certifies that the approved erosion and sediment control plan will be followed. Person: Any individual, landowner, occupier, owner's agent, contractor, subcontractor, permittee, equipment operator, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative county, city, town or other political subdivision of the commonwealth, any interstate body, or any other legal entity. Responsible land disturber: An individual from the project or development team, who will be in charge of and responsible for carrying out a land disturbing activity covered by an approved plan or agreement in lieu of a plan, who (i) holds a Responsible Land Disturber certificate of competence, (ii) holds a current certificate of competence from the Board in the areas of Combined Administration, Program Administration, Inspection, or Plan Review, (iii) holds a current Contractor certificate of competence for erosion and sediment control, or (iv) is licensed in Virginia as a professional engineer, architect, certified landscape architect or land surveyor pursuant to Article 1 (section 54.1-400 et seq.) of Chapter 4 of Title 54.1. Runoff volume: The volume of water that runs off the land development project from a prescribed storm event. Virginia Erosion and Sediment Control Program or VESCP: A program approved by the Board that has been established by a VESCP authority for the effective control of soil erosion, sediment deposition, and nonagricultural runoff associated with a land-disturbing activity to prevent the unreasonable degradation of properties, stream channels, waters, and other natural resources and shall include such items where applicable as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement where authorized in this article, and evaluation consistent with the requirements of this article and its associated regulations. Virginia Erosion and Sediment Control Program authority or VESCP authority: An authority approved by the Board to operate a Virginia Erosion and Sediment Control Program. An authority may include a state entity, including the Department; a federal entity; a district, county, city, or town; or for linear projects subject to annual standards and specifications, electric, natural gas and telephone utility companies, interstate and intrastate natural gas pipeline companies, railroad companies, or authorities created pursuant to section 15.2-5102. State waters: All waters on the surface and under the ground wholly or partially within or bordering the commonwealth or within its jurisdictions. Water quality volume: The volume equal to the first one-half inch of runoff multiplied by the impervious surface of the land development project.
(Ord. No. 38,347, § 1, 5-14-96; Ord. No. 39,340, § 1, 10-20-98; Ord. No. 41,726, § 1, 2-15-05; Ord. No. 45,600, § 1, 6-24-14, eff. 7-1-14)
Ask a question about Norfolk law
Corpus searches the Norfolk sections it holds and shows the ones that match, with their citations. Free, no sign-in.
