For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 32-271 — Parking lot construction requirements generally

Code of the City of Portsmouth, Virginia (Codified through Ordinance No. 2026-64, enacted June 23, 2026. (Supp. No. 66)) · Portsmouth City Code § 32-271

Corpus is an independent public-information project, not the official City of Portsmouth website. Stable reference: corpuslaw.us/code/af2c4e51-9f14-429f-a006-0171b719f6bd

Sec. 32-271. - Parking lot construction requirements generally.

All parking lots shall be constructed in accordance with the following requirements for on-site and off-site improvements: (1) On-site improvements. On-site improvements shall consist of either: a. Parkway curbs or curbs and gutters around the entire interior perimeter of the parking lot; or b. Wheel stops located at the end of each designated parking space in the parking lot, as determined by the city engineer in his sole discretion. (2) Off-site improvements. Off-site improvements to the right-of-way adjacent to the property being improved shall consist of seven-inch thick concrete aprons from the property line to the curb or edge of street pavement, not to exceed 15 feet in length measured from the edge of the curb or street pavement. The developer of the parking lot shall install curbs and gutters, with necessary street widening and sidewalks along the entire street frontage of the property being improved to the adjoining property lines. The developer shall also install drainage pipes in all ditches along the street frontage of the property. The off-site drainage requirements of section 33-33 of this Code shall apply to these improvements. The city engineer may modify or waive the required installation for street curbs, gutters, and/or sidewalks if he determines that the public safety will not be adversely affected by such waiver. A modification or waiver may only be issued if the subject property is located in an industrial M-1, industrial M-1-R, or industrial M-2 zoning district; if the street to be improved is not located within or immediately adjacent to a residentially-zoned area; or if the street serves primarily as an alley or service road and does not front on a commercial or residential area. Regardless of any modification or waiver of the curbing and guttering or sidewalk requirements, the city engineer may still require the widening of the roadway in accordance with city specifications. (3) Existing parking lots. For the expansion of existing parking lots, the city engineer may grant an exception from the construction requirements of subsections (1) and (2) of this section if he deems that such an exception is necessary to prevent a demonstrable hardship upon the property owner based on the relative size of the expansion, and that the public health or safety will not be adversely affected by the exception. (4) Construction methods and materials. Bituminous concrete or Portland cement concrete shall be utilized for all street improvements and widening and shall be designed and installed subject to the approval of the city engineer according to the street classification and use. All parking facilities shall be paved with bituminous concrete or Portland cement concrete. Parking lot wheel stops shall be constructed of concrete or of an equal material as approved by the city engineer. The city engineer may require paving surfaces and/or construction techniques which minimize surface stormwater runoff in areas where it is deemed necessary. The developer may select precast interlocking blocks, porous-type asphalt paving, detention basins or other methods approved by the city engineer. In M-1 and M-2 industrial zones, the city engineer may modify or waive the required installation of paving on storage areas away from street frontage so long as same do not result in dust, dirt, sand, gravel and similar materials being deposited or tracked on public streets or rights-of-way. Storage areas are defined as an area used for storage of materials and equipment not on a trailer, and non-temporary (greater than 30 days) storage of motor vehicles and trailers. Access aisles of storage areas shall be paved to the standards of a parking lot, and shall be no less than 24 feet wide. (5) Phased improvements. The improvements to streets and parking facilities in this article may be phased in accordance with the schedule of improvements approved by the city engineer after considering the proposed use of the parking facility including the anticipated number of persons utilizing the area during the period of construction of the facility.

(Code 1988, § 32-271; Ord. No. 1991-24, § 1, 3-26-1991; Ord. No. 1995-118, § 1, 12-12-1995)

Ask a question about Portsmouth law

Corpus searches the Portsmouth sections it holds and shows the ones that match, with their citations. Free, no sign-in.