Sec. 32-61. - Schedule of fees and charges.

(a) Nonresidential construction. An inspection fee as set forth in appendix A to this Code shall be charged for land disturbance in the right-of-way, not exceeding 100 square feet. An additional fee as set forth in appendix A to this Code shall be charged for such land disturbance in excess of 100 square feet. The unit fee for utility poles shall be as set forth in appendix A to this Code per pole. Installation of underground utilities shall be charged as above. The area of land disturbance for purpose of calculating the inspection fee for the installation of underground utilities shall be the linear length of the line installed by three feet wide. (b) Residential construction. For each permit issued under this article, an inspection fee as set forth in appendix A to this Code per residential lot shall be charged. The inspection fee shall cover any disturbance in the right-of-way, with the exception of driveway aprons. (c) Inspections and reinspections. The city engineer or designee shall inspect all such work, which shall be subject to conditions prescribed as to materials and construction. If reinspection is required due to a condition caused by the permittee a reinspection fee as set forth in appendix A to this Code must be paid prior to the reinspection. (d) Individual work locations included on one permit. Up to ten individual work locations may be included on one permit if: (i) each cut is not larger than one square yard in area, (ii) all such cuts are within 300 linear feet along any one street, (iii) the inclusion of additional cuts will not increase the inspection services required for any one cut, and (iv) all such cuts will be able to be repaved or resurfaced at one time. For each such permit issued, charges for repaving or resurfacing will be levied based on the schedule contained in subsection (b) of this section prorated to the nearest one-tenth of a square yard for the total area involved. (e) Underestimations. Should it develop that the amount of land or pavement removed or disturbed was underestimated, the applicant shall pay any resulting difference in fees. (f) Fees for street or lane closures. A fee as set forth in appendix A to this Code shall be charged for temporary street or lane closures necessitated by work in the right-of-way. (g) Franchise utilities. For permits issued under this article for land disturbance work in the right-of-way to an entity which is subject to the jurisdiction of the state corporation commission and which furnishes utility services in the city, or to an entity which has entered into a franchise agreement with the city for use of the right-of-way, the permit fee (inclusive of all inspection, reinspection, lane closure, or other charges imposed by any other provision of this section) shall be an amount equal to one percent of the total cost of construction as provided in the project engineer's cost estimate.

(Code 1973, § 32-48; Code 1988, § 32-61; Ord. No. 2002-43, § 1, 7-9-2002; Ord. No. 2020-34, § 4, 5-12-2020; Ord. No. 2023-125, § 2, 12-12-2023)