For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 40.2-310 — Resilient Site and Building Bonuses

Code of the City of Portsmouth, Virginia (Codified through Ordinance No. 2026-64, enacted June 23, 2026. (Supp. No. 66)) · Portsmouth City Code § 40.2-310

Corpus is an independent public-information project, not the official City of Portsmouth website. Stable reference: corpuslaw.us/code/c2ee000e-c600-4ae1-9506-5380ab97841f

Sec. 40.2-310. - Resilient Site and Building Bonuses.

(A) Purpose. This section is intended to promote sustainable development within the City of Portsmouth by creating bonuses for addressing global climate change, protecting natural resources, reducing stormwater runoff and pollutants, mitigating sea level rise, and ensuring a high quality of life for future Portsmouth residents. The following resilient site and building bonuses are provided below. (1) Type of Bonuses. (a) Development providing resilient site and building features in accordance with the provisions of this section shall be eligible for bonuses shown in Table 40.2-310(1) and including: (i) A total density bonus of up to a maximum of 20 percent beyond the maximum allowable gross residential density; (ii) An increase in the maximum allowable height of up to maximum of 20 feet in residential districts and 24 feet in commercial districts beyond the maximum allowed in the base zoning district; (iii) An increase in the maximum allowable building coverage by a maximum of 15 percent beyond the maximum allowed in the base zoning district; or (iv) A reduction in the off-street parking requirements of up to 15 percent of the minimum amount of required parking. (B) Standards. (1) Development may include an appropriate number of resilient site and building features to take advantage of more than one type of bonus, but in no instance shall the amount of a bonus be increased or decreased (as appropriate) beyond the maximum listed in this subsection. (2) Individual resilient site and building features shall not count as double bonuses if duplicated, unless indicated in Table 40.2-310(2). (C) Applicability. (1) The bonuses included in this section are available to new development in the commercial, industrial, special, Downtown (D1), and UR-M zoning districts. (2) Resilient site and building bonuses shall be limited to those related to building height or gross residential density in the D1 district. (D) Procedure. (1) Development seeking to use resilient site and building bonuses shall include a written request with the development application. (2) Review for compliance with this section, and receipt of a bonus in accordance with this section shall occur during review of a Use Permit (Sec. 40.2-533), a Zoning Text and Zoning Map Amendment (Sec. 40.2-532), a Site Plan (Article IV, Division IV), or a Zoning Permit (Sec. 40.2-530), as appropriate. (3) Resilient site and building features required as part of an approved Use Permit can only be modified by City Council. (4) The bonus shall be based on the number of resilient site and building features provided, in accordance with Table 40.2-310(1) Resilient Site and Building Bonuses and Table 40.2-310(2) Menu of Resilient Site and Building Features. TABLE 40.2-310(1): RESILIENT SITE AND BUILDING BONUSES TYPE OF BONUS | MINIMUM NUMBER OF FEATURES PROVIDED OPTION 1: From Group A | OPTION 2: From Group B Increase in gross residential density by up to 10 percent beyond district maximum | 1 | 2 Increase in building height by 10 feet for residential developments and 12 feet for commercial developments beyond district maximum | 1 | 2 Increase in the maximum building coverage by up to 5 percent | 1 | 2 Modification in the minimum number of required off-street parking spaces by up to 5 percent | 1 | 2 Increase in gross residential density up to 20 percent beyond district maximum | 2 | 4 Increase in building height by 20 feet for residential development and 24 for commercial developments beyond district maximum | 2 | 4 Increase in the maximum building coverage by up to 15 percent | 2 | 4 Modification to the minimum number of required off-street parking spaces by up to 15 percent | 2 | 4 (E) Menu of Resilient Site and Building Features. One or more of the following resilient site and building features shown in Table 40.2-301(2) may be offered by an applicant for proposed development in accordance with Table 40.2-310(1), Resilient Site and Building Bonuses. TABLE 40.2-310(2): MENU OF RESILIENT SITE & BUILDING FEATURES SCHEDULE | FEATURE ENERGY A | Generation of a minimum of 20 percent of the electricity needed by the development from alternative energy sources (such as solar, wind, geothermal, or biomass) within five years and provide documentation from a certified professional A | Proof of purchase of carbon offsets in an amount equivalent to 15 percent of the construction costs within five years B | Install and operate solar photovoltaic panels or solar thermal heating devices on at least 30 percent of the roof area A | Install and operate solar photovoltaic panels or solar thermal heating devices on at least 60 percent of the roof area A | Install solar-powered battery backup generators with the capacity to provide electricity to the entire development RECYCLING/WASTE REDUCTION A | Utilize approved recycled materials for 50 percent of private streets, off-street parking, sidewalks, curbs and 25 percent of building materials and site amenities B | Provide at least one enclosed recycling station per building suitable for storage and collection of recyclable generated on-site B | Provide on-site composting station or location for all occupants SITE CONFIGURATION B | Provision of a community garden with at least 30 square feet per dwelling unit that is controlled by a property-owners association or multifamily entity B | Use of paving materials in driveways and parking lots that have solar reflectance index (SRI) score of at least 29 (SRI is a measure of a parking lot's ability to reject solar heat; a higher SRI yields a cooler parking lot) A | Include underground parking or a parking structure that accounts for at least 75% of the required off street parking RESOURCE CONSERVATION A | Provision of 150-foot undisturbed buffers adjacent to all perennial stream banks, wetlands, and bodies of water B | Use only native vegetation for required landscaping A | Preservation of at least 15 percent of the tree canopy on a site comprised of the canopies of trees 10 inches or greater in DBH (Diameter at Breast Height) A | Provide double the minimum required open space set-aside amount AA | Remediate site contamination on a documented "brownfield" site (by means of a Phase II Environmental Site Assessment) (credited as provision of two schedule "A" features) TRANSPORTATION B | Inclusion of showering and dressing facilities in nonresidential development for employees using alternative forms of transportation B | Provide preferred parking spaces and signage for carpool, shared-use, and/or low-emitting vehicles located closest to the building entrance equal to 10% of required off-street parking A | Provide a receptacle to accommodate use of electric vehicle supply equipment (EVSE) and verify that the electrical system has sufficient capacity to charge a minimum of two electric vehicles simultaneously at a minimum of Level 2 charging levels. BUILDING CONFIGURATION A | Inclusion of green or blue roofs on at least 50 percent of the roof area within the development B | Inclusion of green or blue roofs on at least 25 percent of the roof area within the development A | Use roofing materials that have a SRI equal to or greater than 78 for low-sloped roofs (<2:12) or 29 for steep-sloped roofs (>2:12) for a minimum of 75% of the roof surface of all new buildings within the development A | Inclusion of green walls on at least 30 percent of the wall area within the development B | Inclusion of green walls on at least 15 percent of the wall area within the development B | Obtain Elizabeth River Project's River Star Homes or River Star Business certification B | Meet minimum Energy Star (or equivalent) criteria for at least 75 percent of the residential floor area AA | Design the building to achieve a minimum LEED certification of platinum (credited as provision of two schedule "A" features) A | Design the building to achieve a minimum LEED certification of gold B | Design the building to achieve a minimum LEED certification of silver A | Design buildings such that 50 percent of the residential units are consistent with Universal Design practices B | Design buildings such that 25 percent of the residential units are consistent with Universal Design practices B | Use flood damage resistant construction materials beyond those required by standards in the City's flood regulations. WATER CONSERVATION A | Inclusion of a recycled or grey water system for landscaping irrigation that accounts for 75% of water used. B | Inclusion of drip or subsurface irrigation systems for all landscape irrigation equipped with pressure regulators, filters, and emitters INNOVATIVE STRATEGY B | Provide documentation of implementation of an innovative product or strategy that increases the resiliency of the development that is not provided in this section.

(Ord. No. 2023-43, § 53, 5-23-2023)

Ask a question about Portsmouth law

Corpus searches the Portsmouth sections it holds and shows the ones that match, with their citations. Free, no sign-in.