For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14-323 — Definitions

Code of the City of Richmond, Virginia, 2026 (Recodification codified through Ordinance No. 2025-207, adopted October 14, 2025) · Richmond, Va., City Code § 14-323

Corpus is an independent public-information project, not the official City of Richmond website. Stable reference: corpuslaw.us/code/38a4cc0b-7c77-4012-b680-44ec1e481e11

Sec. 14-323. - Definitions.

The following words and terms used in this article have the following meanings, unless the context clearly indicates otherwise. In addition, some terms not defined herein are defined at 9VAC25-875-20 of the Virginia Erosion and Stormwater Management Regulations, as amended, and are incorporated herein by reference. Administrator means the Director of Public Utilities or his or her designee. Agreement in lieu of a soil erosion control and stormwater management plan means an executed agreement in lieu of a soil erosion control and stormwater management plan, which shall be a contract between the City and a Richmond erosion and stormwater management program permittee, that is on a form approved by the Administrator, and that specifies methods that the permittee shall implement to comply with the Richmond erosion and stormwater management program requirements for the construction of a detached, separately constructed, single-family residence or farm building or structure on a parcel of land with a total impervious cover percentage, including the impervious cover from the farm building or structure to be constructed, of less than five percent. Applicant means any person submitting an application for a permit under this article. Best management practice or BMP means schedules of activities, prohibitions of practices, maintenance procedures, and other management practices, including both structural and nonstructural practices, to prevent or reduce the pollution of surface water and groundwater systems from the impacts of land disturbing activities. Board means the State Water Control Board. Channel means a natural stream or manmade waterway. Chesapeake Bay Preservation Act means Article 2.5 (§ 62.1-44.15:67 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia. Chesapeake Bay Preservation Act land disturbing activity means a land disturbing activity, including clearing, grading, or excavation that results in a land disturbance equal to or greater than 2,500 square feet and less than one acre in areas of the City designated as subject to the regulations adopted pursuant to the Chesapeake Bay Preservation Act, Code of Virginia, § 62.1-44.15:67 et seq. Chesapeake Bay Preservation Area means any land designated by a local government pursuant to Part III (9VAC25-830-70 et seq.) of the Chesapeake Bay Preservation Area Designation and Management Regulations and § 62.1-44.15:74 of the Code of Virginia. A Chesapeake Bay Preservation Area shall consist of a Resource Protection Area and a Resource Management Area as defined in the Chesapeake Bay Preservation Area Designation and Management Regulations (9VAC25-830). Clean Water Act means the Federal Clean Water Act (33 USC § 1251 et seq.), formerly referred to as the Federal Water Pollution Control Act or Federal Water Pollution Control Act Amendments of 1972, Public Law 92-500, as amended by Public Law 95-217, Public Law 95-576, Public Law 96-483, and Public Law 97-117, or any subsequent revisions thereto. Common plan of development or sale means a contiguous area where separate and distinct construction activities may be taking place at different times on different schedules. Comprehensive stormwater management plan means a plan, which may be integrated with other land use plans or regulations that specifies how the water quality components, quantity components, or both of stormwater are to be managed on the basis of an entire watershed or a portion thereof. The plan may also provide for the remediation of erosion, flooding, and water quality and quantity problems caused by prior development. Construction activity means any clearing, grading, or excavation associated with large construction activity or associated with small construction activity. Control measure means any best management practice or stormwater facility, or other method used to minimize the discharge of pollutants to State waters. Dam means a barrier to confine or raise water for storage or diversion, to create a hydraulic head, to prevent gully erosion, or to retain soil, rock or other debris. Denuded is a term applied to land that has been physically disturbed and no longer supports vegetative cover. Department of Environmental Quality means the Virginia Department of Environmental Quality. Development means land disturbance and the resulting landform associated with the construction of residential, commercial, industrial, institutional, recreation, transportation or utility facilities, or structures, or the clearing of land for non-agricultural or non-silvicultural purposes. Dike means an earthen embankment constructed to confine or control water, especially one built along the banks of a river to prevent overflow of lowlands; levee. Discharge when used without qualification, means the discharge of a pollutant. Discharge of a pollutant means: (1) Any addition of any pollutant or combination of pollutants to state waters from any point source; or (2) Any addition of any pollutant or combination of pollutants to the waters of the contiguous zone or the ocean from any point source other than a vessel or other floating craft which is being used as a means of transportation. The term "discharge of a pollutant" includes additions of pollutants into surface waters from: surface runoff that is collected or channeled by man; discharges through pipes, sewers, or other conveyances owned by a state, municipality, or other person that do not lead to a treatment works; and discharges through pipes, sewers, or other conveyances, leading into privately owned treatment works. The term "discharge of a pollutant" does not include an addition of pollutants by any indirect discharger. Diversion means a channel with a supporting ridge on the lower side constructed across or at the bottom of a slope for the purpose of intercepting surface runoff. Drainage area means a land area, water area, or both from which runoff flows to a common point. Energy dissipator means a non-erodible structure which reduces the velocity of concentrated flow to reduce its erosive effects. Environmental Protection Agency or EPA means the United States Environmental Protection Agency. Erosion and sediment control plan means a document containing material for the conservation of soil and water resources of a unit or group of units of land. The term "erosion and sediment control plan" may include appropriate maps, an appropriate soil and water plan inventory and management information with needed interpretations, and a record of decisions contributing to conservation treatment. The plan shall contain all major conservation decisions to ensure that the entire unit or units of land will be so treated to achieve the conservation objectives. Erosion impact area means an area of land that is not associated with a current land disturbing activity but is subject to persistent soil erosion resulting in the delivery of sediment onto neighboring properties or into State waters. The term "erosion impact area" shall not apply to any lot or parcel of land of 10,000 square feet or less used for residential purposes or to shorelines where the erosion results from wave action or other coastal processes. ESC means erosion and sediment control. ESM plan means a soil erosion control and stormwater management plan, commonly referred to as the "erosion control and stormwater management plan." Farm building or structure means the same as that term is defined in § 36-97 of the Code of Virginia and also includes any building or structure used for agritourism activity, as defined in Code of Virginia, § 3.2-6400, and any related impervious services including roads, driveways, and parking areas. Flood fringe means the portion of the floodplain outside the floodway that is usually covered with water from the 100-year flood or storm event. The term "flood fringe" includes the flood or floodway fringe designated by the Federal Emergency Management Agency. Flooding means a volume of water that is too great to be confined within the banks or walls of the stream, water body, or conveyance system and that overflows onto adjacent lands, thereby causing or threatening damage. Floodplain means the area adjacent to a channel, river, stream, or other water body that is susceptible to being inundated by water normally associated with the 100-year flood or storm event. The term "floodplain" includes the floodplain designated by the Federal Emergency Management Agency. Floodprone area means the component of a natural or restored stormwater conveyance system that is outside the main channel. Floodprone areas may include the floodplain, the floodway, the flood fringe, wetlands, riparian buffers, or other areas adjacent to the main channel. Floodway means the channel of a river or other watercourse and the adjacent land areas, usually associated with flowing water, that must be reserved in order to discharge the 100-year flood or storm event without cumulatively increasing the water surface elevation more than one foot. The term "floodway" includes the floodway designated by the Federal Emergency Management Agency. General permit means a permit authorizing a category of discharges under the Clean Water Act and the VESMA within a geographical area. Impervious cover means a surface composed of material that significantly impedes or prevents natural infiltration of water into soil. Inspection means an on-site review of the project's compliance with any applicable design criteria, or an on-site review to obtain information or conduct surveys or investigations necessary in the implementation or enforcement of the VESMA and applicable regulations. Karst area means any land area predominantly underlain at the surface or shallow subsurface by limestone, dolomite, or other soluble bedrock regardless of any obvious surface karst features. Karst features means sinkholes, sinking and losing streams, caves, large flow springs, and other such landscape features found in karst areas. Land disturbance or land disturbing activity means a manmade change to the land surface that may result in soil erosion or has the potential to change its runoff characteristics, including clearing, grading, or excavation, except that the term "land disturbance" or "land disturbing activity" shall not include the exemptions included in Section 14-324. Large construction activity means construction activity including clearing, grading, and excavation, except operations that result in the disturbance of less than five acres of total land area. The term "large construction activity" also includes the disturbance of less than five acres of total land area that is a part of a larger common plan of development or sale if the larger common plan will ultimately disturb five acres or more. The term "large construction activity" does not include routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original purpose of the facility. Layout means a conceptual drawing sufficient to provide for the specified stormwater management facilities required at the time of approval. Linear development project means a land disturbing activity that is linear in nature, such as, but not limited to, (1) The construction of electric and telephone utility lines, and natural gas pipelines; (2) Construction of tracks, rights-of-way, bridges, communication facilities and other related structures of a railroad company; (3) Highway construction projects; (4) Construction of stormwater channels and stream restoration activities; and (5) Water and sewer lines. Private subdivision roads or streets shall not be considered linear development projects. Localized flooding means smaller scale flooding that may occur outside of a stormwater conveyance system. This may include high water, ponding, or standing water from stormwater runoff, which is likely to cause property damage or unsafe conditions. Main channel means the portion of the stormwater conveyance system that contains the base flow and small frequent storm events. Minimize means to reduce or eliminate the discharge of pollutants to the extent achievable using stormwater controls that are technologically available and economically practicable. Minor modification means amendment modifications and amendments to an existing permit before its expiration, not requiring extensive review and evaluation, and including, but not limited to, changes in test protocols promulgated by the U.S. Environmental Protection Agency, increased monitoring frequency requirements, changes in sampling locations, and changes to compliance dates within compliance schedules. A minor permit modification or amendment does not substantially alter permit conditions, substantially increase or decrease the amount of surface water impacts, increase the size of an operation, or reduce the capacity of a facility to protect human health or the environment. Natural channel design concepts means the utilization of engineering analysis and fluvial geomorphic processes to create, rehabilitate, restore, or stabilize an open conveyance system for the purpose of creating or recreating a stream that conveys its bankfull storm event within its banks and allows larger flows to access its bankfull bench and its floodplain. Natural stream means a tidal or nontidal watercourse that is part of the natural topography. It usually maintains a continuous or seasonal flow during the year and is characterized as being irregular in cross-section with a meandering course. Constructed channels such as drainage ditches or swales shall not be considered natural streams; however, channels designed utilizing natural channel design concepts may be considered natural streams. Nonpoint source pollution means pollution such as sediment, nitrogen, phosphorous, hydrocarbons, heavy metals, and toxics whose sources cannot be pinpointed but rather are washed from the land surface in a diffuse manner by stormwater. Operator means the owner or operator of any facility or activity subject to regulation pursuant to this article. In the context of stormwater associated with a large or small construction activity, operator means any person associated with a construction project that meets either of the following two criteria: (1) The person has direct operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications; or (2) The person has day-to-day operational control of those activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other permit or Richmond erosion and stormwater management program permit authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). Owner means the same as that term is defined in § 62.1-44.3 of the Code of Virginia. For a regulated land disturbing activity that does not require a permit, the term "owner" also means the owner of the freehold of the premises or lesser estate therein, mortgagee or vendee in possession, assignee of rents, receiver, executor, trustee, lessee, or other person, firm, or corporation in control of a property. Permit or Richmond erosion and stormwater management program permit means an approval to conduct a land disturbing activity, issued by the Administrator after the Administrator has confirmed, if applicable, general permit coverage with the Department of Environmental Quality. Permittee means the person to whom a Richmond erosion and stormwater management program permit is issued. Person means any individual, corporation, partnership, association, state, municipality, commission, political subdivision of a state, governmental body (including Federal, State, or local entity, as applicable), interstate body, or any other legal entity. Point of discharge means a location at which concentrated stormwater runoff is released. Point source means any discernible, confined, and discrete conveyance, including any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, rolling stock, concentrated animal feeding operation, landfill leachate collection system, vessel, or other floating craft from which pollutants are or may be discharged. The term "point source" does not include return flows from irrigated agriculture or agricultural stormwater runoff. Pollutant discharge means the average amount of a particular pollutant measured in pounds per year or other standard reportable unit as appropriate, delivered by stormwater runoff. Pollution means such alteration of the physical, chemical, or biological properties of any state waters as will or is likely to create a nuisance or render such waters: (1) Harmful or detrimental or injurious to the public health, safety, or welfare, or to the health of animals, fish or aquatic life; (2) Unsuitable with reasonable treatment for use as present or possible future sources of public water supply; or (3) Unsuitable for recreational, commercial, industrial, agricultural, or other reasonable uses, provided that: a. An alteration of the physical, chemical, or biological property of state waters, or a discharge or deposit of sewage, industrial wastes or other wastes to state waters by any owner which by itself is not sufficient to cause pollution, but which, in combination with such alteration of or discharge or deposit to state waters by other owners, is sufficient to cause pollution; b. The discharge of untreated sewage by any owner into state waters; and c. Contributing to the contravention of standards of water quality duly established by the State Water Control Board, are pollution for the terms and purposes of this article. Post-development refers to conditions that reasonably may be expected or anticipated to exist after completion of the land development activity on a specific site or tract of land. Predevelopment refers to the conditions that exist at the time that plans for the land disturbing activity are submitted to the City. Where phased development or plan approval occurs (preliminary grading, demolition of existing structures, roads, and utilities, etc.), the existing conditions at the time prior to the commencement of land disturbing activity shall establish predevelopment conditions. Prior developed lands means land that has been previously utilized for residential, commercial, industrial, institutional, recreation, transportation, or utility facilities or structures, and that will have the impervious areas associated with those uses altered during a land disturbing activity. Qualified personnel means a person knowledgeable in the principles and practices of erosion and sediment and stormwater management controls who possesses the skills to assess conditions at the construction site for the operator that could impact stormwater quality and quantity and to assess the effectiveness of any sediment and erosion control measures or stormwater management facilities selected to control the quality and quantity of stormwater discharges from the construction activity. Regulations means the Virginia Stormwater Management Program Permit Regulations, 9VAC25-875-10 et seq., as amended. Responsible land disturber or RLD means an individual holding a certificate issued by the department who is responsible for carrying out the land disturbing activity in accordance with the approved erosion and sediment control plan or ESM plan. The RLD may be the owner, applicant, permittee, designer, superintendent, project manager, contractor, or any other project or development team member. The RLD must be designated on the erosion and sediment control plan, ESM plan, or permit, as defined in this section, as a prerequisite for engaging in land disturbance. Runoff or stormwater runoff means that portion of precipitation that is discharged across the land surface or through conveyances to one or more waterways. Runoff characteristics includes maximum velocity, peak flow rate, volume, and flow duration. Runoff volume means the volume of water that runs off the land development project from a prescribed storm event. Sediment basin means a temporary impoundment built to retain sediment and debris with a controlled stormwater release structure. Sheet flow (also called overland flow) means shallow, unconcentrated and irregular flow down a slope. The length of strip for overland flow usually does not exceed 100 feet under natural conditions. Site means the land or water area where any facility or land disturbing activity is physically located or conducted, including adjacent land used or preserved in connection with the facility or land disturbing activity. Areas channelward of mean low water in tidal Virginia shall not be considered part of a site. Small construction activity means: (1) Construction activities including clearing, grading, and excavating that results in land disturbance of equal to or greater than one acre and less than five acres. Small construction activity also includes the disturbance of less than one acre of total land area that is part of a larger common plan of development or sale if the larger common plan will ultimately disturb equal to or greater than one and less than five acres. Small construction activity does not include routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original purpose of the facility. The department may waive the otherwise applicable requirements in a general permit for a stormwater discharge from construction activities that disturb less than five acres where stormwater controls are not needed based on an approved "total maximum daily load" (TMDL) that addresses the pollutants of concern or, for nonimpaired waters that do not require TMDLs, an equivalent analysis that determines allocations for small construction sites for the pollutants of concern or that determines that such allocations are not needed to protect water quality based on consideration of existing in-stream concentrations, expected growth in pollutant contributions from all sources, and a margin of safety. For the purpose of this subdivision, the pollutants of concern include sediment or a parameter that addresses sediment (such as total suspended solids, turbidity, or siltation) and any other pollutant that has been identified as a cause of impairment of any water body that will receive a discharge from the construction activity. The operator shall certify to the department that the construction activity will take place, and stormwater discharges will occur, within the drainage area addressed by the TMDL or provide an equivalent analysis. As of the start date in Table 1 of 9VAC25-31-1020, all certifications submitted in support of the waiver shall be submitted electronically by the owner or operator to the department in compliance with this subdivision and 40 CFR Part 3 (including, in all cases, 40 CFR Part 3 Subpart D), 9VAC25-875-940, and Part XI (9VAC25-31-950 et seq.) of the Virginia Pollutant Discharge Elimination System (VPDES) Permit Regulation. Part XI of 9VAC25-31 is not intended to undo existing requirements for electronic reporting. Prior to this date, and independent of Part XI of 9VAC25-31, permittees may be required to report electronically if specified by a particular permit. (2) Any other construction activity designated by either the department or the EPA regional administrator, based on the potential for contribution to a violation of a water quality standard or for significant contribution of pollutants to surface waters. Soil erosion means the movement of soil by wind or water into state waters or onto lands in the Commonwealth. Soil erosion control and stormwater management plan, commonly referred to as the "erosion control and stormwater management plan," or "ESM plan" means a document describing methods for controlling soil erosion and managing stormwater in accordance with the requirements adopted pursuant to the VESMA. The ESM plan may consist of aspects of the erosion and sediment control plan and the stormwater management plan as each is described in this article. State means the Commonwealth of Virginia. State permit means an approval to conduct a land disturbing activity issued by the State Water Control Board in the form of a State stormwater individual permit or coverage issued under a State general permit, or an approval issued by the State Water Control Board for stormwater discharges from a municipal separate storm sewer system. The State imposes and enforces requirements pursuant to the Clean Water Act and regulations, the Virginia Stormwater Management Act, and the Regulations through the use of State permits. State Water Control Board means the Virginia State Water Control Board. State Water Control Law means Code of Virginia, Title 62.1, Ch. 3.1 (Code of Virginia, § 62.1-44.2 et seq.). State waters means all water, on the surface and under the ground, wholly or partially within or bordering the Commonwealth, or within its jurisdiction, including wetlands. Storm sewer inlet means a structure through which stormwater is introduced into an underground conveyance system. Stormwater means precipitation that is discharged across the land surface or through conveyances to one or more waterways and may include stormwater runoff, snow melt runoff, and surface runoff and drainage. Stormwater conveyance system means a combination of drainage components that are used to convey stormwater discharge, either within or downstream of the land disturbing activity. This includes: (1) Manmade stormwater conveyance system means a pipe, ditch, vegetated swale, or other stormwater conveyance system constructed by man except for restored stormwater conveyance systems; (2) Natural stormwater conveyance system means the main channel of a natural stream and the floodprone area adjacent to the main channel; or (3) Restored stormwater conveyance system means a stormwater conveyance system that has been designed and constructed using natural channel design concepts. Restored stormwater conveyance systems include the main channel and the floodprone area adjacent to the main channel. Stormwater detention means the process of temporarily impounding runoff and discharging it through a hydraulic outlet structure to a downstream conveyance system. Stormwater management facility means a control measure that controls stormwater runoff and changes the characteristics of that runoff including the quantity and quality, the period of release or the velocity of flow. Stormwater management plan means a document containing material that describes methods for complying with the requirements of this article. Stormwater pollution prevention plan means a document that is prepared in accordance with good engineering practices, that identifies potential sources of pollutants that reasonably may be expected to adversely affect the quality of stormwater discharges from a construction site, and that otherwise meets the requirements of this chapter. In addition, a stormwater pollution prevention plan shall identify and require the implementation of control measures, and shall include, but not be limited to, the inclusion of, or the incorporation by reference of, an approved erosion and sediment control plan, an approved stormwater management plan, and a pollution prevention plan. Subdivision means a division, subdivision, or resubdivision of a lot, tract, or parcel of land situated wholly or partly within the corporate City limits into three or more lots, tracts, or parcels of land for the purpose, whether immediate or in the future, of transferring ownership of any one or more of such lots, tracts, or parcels of land or for the purpose of the erection of buildings or other structures on any one or more of such lots, tracts, or parcels of land. The term "subdivision" shall not include a division of land for agricultural purposes in parcels of one acre or more, the average width of which is not less than 150 feet, when such division: (1) Does not require the opening of any new street or the use of any new public easement of access; (2) Does not obstruct, and is not likely to obstruct, natural drainage; (3) Does not adversely affect, and is not likely to adversely affect, the establishment of any expressway, major street, primary highway, or toll road; and (4) Does not adversely affect the execution or development of any plat or subdivision approved by the City Planning Commission or otherwise adversely affect the orderly subdivision of contiguous property. Surface waters means: (1) All waters that are currently used, were used in the past, or may be susceptible to use in interstate or foreign commerce, including all waters that are subject to the ebb and flow of the tide; (2) All interstate waters, including interstate wetlands; (3) All other waters such as intrastate lakes, rivers, streams (including intermittent streams), mudflats, sandflats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, or natural ponds the use, degradation, or destruction of which would affect or could affect interstate or foreign commerce including any such waters: a. That are or could be used by interstate or foreign travelers for recreational or other purposes; b. From which fish or shellfish are or could be taken and sold in interstate or foreign commerce; or c. That are used or could be used for industrial purposes by industries in interstate commerce; (4) All impoundments of waters otherwise defined as surface waters under this definition; (5) Tributaries of waters identified in Subsections (1) through (4) of this definition; (6) The territorial sea; and (7) Wetlands adjacent to waters (other than waters that are themselves wetlands) identified in Subsections (1) through (6) of this definition. Waste treatment systems, including treatment ponds or lagoons designed to meet the requirements of the CWA and the law, are not surface waters. Surface waters do not include prior converted cropland. Notwithstanding the determination of an area's status as prior converted cropland by any other agency, for the purposes of the CWA, the final authority regarding the CWA jurisdiction remains with the EPA. SWM means stormwater management. Ten-year storm means a storm that is capable of producing rainfall expected to be equaled or exceeded on the average of once in ten years. It may also be expressed as an exceedance probability with a ten percent chance of being equaled or exceeded in any given year. Total maximum daily load (TMDL) means the sum of the individual wasteload allocations for point sources, load allocations for nonpoint sources, natural background loading and a margin of safety. Total maximum daily loads can be expressed in terms of either mass per time, toxicity, or other appropriate measure. The total maximum daily load process provides for point versus nonpoint source trade-offs. Virginia Erosion and Stormwater Management Act (VESMA) means Article 2.3 of Chapter 3.1, State Water Control Law, of Title 62.1 of the Code of Virginia (Code of Virginia, § 62.1-44,15:24 et seq.). Virginia Erosion and Stormwater Management Program or (VESMP) means a program established by the City for the effective control of soil erosion and sediment deposition and the management of the quality and quantity of runoff resulting from land disturbing activities to prevent the unreasonable degradation of properties, stream channels, waters, and other natural resources. The program shall include such items as local ordinances, rules, requirements for permits and land disturbance approvals, policies and guidelines, technical materials, and requirements for plan review, inspection, and enforcement consistent with the requirements of the VESMA. Virginia Pollutant Discharge Elimination System (VPDES) permit means a document issued by the department pursuant to the State Water Control Law authorizing, under prescribed conditions, the potential or actual discharge of pollutants from a point source to surface waters. Virginia stormwater best management practice clearinghouse website means a website that contains detailed design standards and specifications for control measures that may be used in Virginia to comply with the requirements of the Virginia Erosion and Stormwater Management Act (Code of Virginia, § 62.1-44.15:24 et seq.) and associated regulations. Wasteload allocation means the portion of a receiving surface water's loading or assimilative capacity allocated to one of its existing or future point sources of pollution. Wasteload allocations are a type of water quality-based effluent limitation. Watershed means a defined land area drained by a river or stream, karst system, or system of connecting rivers or streams such that all surface water within the area flows through a single outlet. In karst areas, the karst feature to which water drains may be considered the single outlet for the watershed. Wetlands means those areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas.

(Code 2004, § 50-402; Code 2015, § 14-323; Code 2020, § 14-323; Ord. No. 2014-116-89, § 3, 5-27-2014; Ord. No. 2024-176, § 3, 7-22-2024)

Ask a question about Richmond law

Corpus searches the Richmond sections it holds and shows the ones that match, with their citations. Free, no sign-in.