Sec. 24-63. - Permit fees.
Each permit issued under this article is subject to the applicable fee set forth in this section. The fee for a permit for which the fee is not associated with another section of this article is as set forth in this section. The applicable fee must be paid at the time the application for the permit is submitted to the City. Fees for permits for encroachments or other use of a street, sidewalk or public way issued in accordance with this article Application and processing fee for a work-in-street permit | $75.00 Fees for sidewalk closures (barricades, ladders, scaffolding, fences, covered walkways, swinging stages, trash dumpsters and storage or stockpiling of materials) Per first 30 days per block | $50.00 After 30 days per week per block | $25.00 Fee for street or lane closure—Arterial or collector or City center, per week per street or lane per block | $30.00 Fee for street or lane closure—Residential, per week per street or lane per block | $15.00 Fee for driveways—Residential per driveway | $50.00 Fee for driveways—Commercial per driveway | $150.00 Fees for major and minor utility construction and street cuts Per square foot for local road | $0.25 Per square foot for collector road | $0.50 Per square foot for arterial road | $1.00 Fee for sheeting and shoring per 100 linear feet | $100.00 Fee for dumpster per week | $40.00 Fees for cranes Rubber tire crane per crane per day | $20.00 Track crane per crane per day | $50.00 Fee for man-lift per occurrence (30 day maximum) | $50.00 Fee for covered walkways per week per block | $20.00 Fee for construction entrance | $100.00 Fee for portable storage container per week | $40.00 Fee for construction trailer per trailer per month | $75.00 Fee for portable toilet | $25.00 Fees for steel plates Local road per plate per week | $100.00 Collector road per plate per week | $200.00 Arterial road per plate per week | $300.00 Fee for test pits, borings, and cores, per hole, pit, or bore | $20.00
(Code 1993, § 25-45; Code 2004, § 90-70; Code 2015, § 24-63; Code 2020, § 24-63; Ord. No. 2018-334, §§ 1, 2, 1-28-2019)
Ask a question about Richmond law
Corpus searches the Richmond sections it holds and shows the ones that match, with their citations. Free, no sign-in.