For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-5 — Fee schedules

Code of the City of Richmond, Virginia, 2026 (Recodification codified through Ordinance No. 2025-207, adopted October 14, 2025) · Richmond, Va., City Code § 5-5

Corpus is an independent public-information project, not the official City of Richmond website. Stable reference: corpuslaw.us/code/cf82824f-ce0d-465a-89d0-5d79bb365f85

Sec. 5-5. - Fee schedules.

For the purposes of this chapter, fees for plan examination, permits and inspections shall be as established by the Council. Fee schedules shall be published and available to the public through the Office of the Commissioner of Buildings and shall be as set forth below: Building permits—Residential Value of work (higher of contractor's stated final value including material, labor, subcontracts, owner furnished materials, overhead and profit or estimated value from RSMeans manuals) From $0.00 to $2,000.00 | $63.00 Over $2,000.00 | $63.00* *Plus $6.07 per thousand or fraction thereof for single-family detached residential construction Re-stamping of residential plans will require an additional fee of $32.00 per set of plans Building permits—Commercial Value of work (higher of contractor's stated final value including material, labor, subcontracts, owner furnished materials, overhead and profit or estimated value from RSMeans manuals) From $0.00 to $2,000.00 | $131.00 Over $2,000.00 | $131.00* *Plus $8.50 per thousand or fraction thereof for commercial construction Re-stamping of commercial plans will require an additional fee of $55.00 per set of plans Administrative charge for extending permits | $25.00 Additional fee levy An additional two percent levy of fees shall be assessed for all permits used under the fee structure cited above. The fee shall be remitted to the State Department of Housing and Community Development to support training programs conducted at the Virginia Building Code Academy The minimum administrative fee for permits which have been either withdrawn or rejected shall be five percent of the initial permit fee but in no case less than $25.00 The minimum plans review fee for permits which have been either withdrawn (where the subject review has been undertaken) or rejected shall be ten percent of the initial permit fee but in no case less than $25.00 The minimum revised plan fee once a permit has been issued shall be ten percent of the initial permit fee, but in no case less than $30.00 Any excess fee greater than $2.00 shall be returned to the permit holder upon written request Demolition Residential | $184.00 Commercial | $368.00* *For commercial structures up to 10,000 square feet of floor area; add an additional $0.01 per square foot floor area above 10,000 square feet, not to exceed a maximum fee of $1,000.00 Additional fee levy An additional two percent levy of fees shall be assessed for all permits used under the fee structure cited above. The fee shall be remitted to the State Department of Housing and Community Development to support training programs conducted at the Virginia Building Code Academy Inspection fees Reinspection fee for failure to correct violations previously cited (any trip to a job site is considered an inspection) Residential | $32.00 Commercial | $63.00 Failure to appear for an on-site inspection Residential | $32.00 Commercial | $63.00 Fee for after-hours inspection (weekdays 5:00 p.m. to 8:00 a.m.; weekends, holidays) per hour | $110.00 Special inspection (request for an on-site inspection not required at the time of the request) during normal working hours Residential | $32.00 Commercial | $63.00 Egress lighting test Lighting test, per hour after normal working hours | $95.00 Retest due failure, per hour anytime | $184.00 Electrical certification for change in use Inspection, per hour for inspection and write up of report | $60.00 Fee for after-hours inspection (weekdays 5:00 p.m. to 8:00 a.m.; weekends, holidays) per hour | $90.00 Elevator test (includes coordinated routine inspections) Cable elevators (annual routine test fee) 1—4 floors/openings | $150.00 5—10 floors/openings | $175.00 10 floors/openings | $200.00 Cable hydraulic (annual routine test fee) | $150.00 Hydraulic (annual routine test fee) | $150.00 Escalator (annual routine test fee) | $150.00 Miscellaneous for units not listed above (annual routine test fee) | $100.00 New work (includes reinspection after lock-out) (see new work fee schedule) Reinspections (per visit) | $50.00 Elevator annual routine inspection (without test) | $125.00 Elevator certificate processing fee | $40.00 Appeals to the building code, electrical, mechanical or plumbing board of appeals (as provided for in Code of Virginia, § 36-105) Appeal fee | $184.00* Building maintenance code Certificate of occupancy, including temporary and partial | $263.00 Reprinting of certificate of occupancy | $32.00 Code modification request Code modification fee | $125.00* *Per code section modified, maximum fee $375.00 Small business permits Permit fee | $300.00 Work without a permit investigation Investigation of stop work order, per permit | $400.00 Final acceptance of new elevators or elevator modernization | $230.00 Elevator accidents, complaints, and emergencies per hour | $63.00 Billing of administrative support time per hour | $50.00

(Code 1993, § 5-5; Code 2004, § 14-5; Code 2015, § 5-5; Code 2020, § 5-5; Ord. No. 2006-173-172, § 2, 6-26-2006; Ord. No. 2007-291-274, § 1, 11-26-2007; Ord. No. 2008-52-114, § 1, 5-27-2008; Ord. No. 2008-289-275, § 1, 11-24-2008; Ord. No. 2011-80-65, § 1, 4-25-2011; Ord. No. 2024-099, § III(§ 1), 5-13-2024)

Ask a question about Richmond law

Corpus searches the Richmond sections it holds and shows the ones that match, with their citations. Free, no sign-in.