§ 11.5-7 — Stormwater utility fee credits

Code of Ordinances of the City of Roanoke, Virginia (Codified through Ordinance No. 43473, enacted September 21, 2026. (Supp. No. 95, Update 1)) · Roanoke Code of Ordinances § 11.5-7

Corpus is an independent public-information project, not the official City of Roanoke website. Stable reference: corpuslaw.us/code/b8c22155-0198-4d9a-a6cd-7ba3b2efe656

Sec. 11.5-7. - Stormwater utility fee credits.

Sections 15.2-2114.B, 15.2-2114.D, and 15.2-2114.E, Code of Virginia, as amended, recognize that a continued investment in an on-site stormwater management facility or other best management practice results in a reduced impact on the public stormwater management system or on the receiving surface waters downstream of the parcel. The city manager is authorized to adopt policies, procedures, and manuals necessary to implement, administer, and enforce this section. (a) Credit eligibility. Only on-site stormwater management facilities and other best management practices meeting the following criteria are eligible for a credit against the stormwater utility fee: (1) The parcel owner must submit a credit application form provided by the city in accordance with subsection (c) below. (2) The parcel owner must maintain the structure and function of a stormwater management facility and operate the stormwater management facility, or implement and maintain any such other best management practice set forth in the credit application. (3) The parcel owner must have a properly executed maintenance agreement with the city that has been properly recorded in the land records of the Office of the Clerk of the Circuit Court of the City of Roanoke. (4) The parcel owner must demonstrate to the city's satisfaction that the facility or any such other best management practice is functioning as originally designed. The structure must be maintained to the satisfaction of the city manager in accordance with the properly executed maintenance agreement. (5) The facility or any other best management practice must have met the criteria in existence at the time of construction in at least one (1) of the following sections of the regulations, or the predecessor sections of the City Code as noted, if applicable: (i) 9VAC25-870-96, Virginia Administrative Code, as amended, water quality; or the applicable predecessor section of City Code, including section 11.4-16; or (ii) Both 9VAC25-870-97, Virginia Administrative Code, as amended, stream channel erosion, and 9VAC25-870-98, Virginia Administrative Code, as amended, Flooding; or both applicable predecessor sections of City Code related to stream channel erosion and flooding, including section 11.4-17 (stream channel erosion) and section 11.4-18 (flooding). (6) Facilities or other best management practices that do not meet the minimum criteria in subsection (5) above may still be considered on a case-by-case basis at the discretion of the city manager if it is demonstrated that the facility or any other best management practice achieves a permanent reduction in post-development stormwater flow and pollutant loading. The credit may be prorated based on an analysis of the benefits of the reduction. (7) The city manager shall have the discretion to modify one (1) or more of the credit eligibility requirements set forth in this section for residential and non-residential credit applications, including establishing the definition of residential properties and non-residential properties for purposes of credit applications. The definition of residential properties and non-residential properties entitled to submit credit applications and any such other modifications shall be included in the policies, procedures, or manuals adopted by the city manager pursuant to this section 11.5-7. (b) Credit amounts. (1) The maximum credit allowed is fifty (50) percent of the total annual stormwater utility fee, except as provided in subsection (6) below. (2) For an on-site stormwater management facility, the credit amount is based on the amount of impervious surface located on the parcel draining to the facility, and not the total amount of impervious surface cover on the parcel. (3) Credits for on-site stormwater management facilities or other best management practices are as follows if the facility or any other best management practice was required under the provisions of Chapter 11.6, Stormwater Management, of the City Code: (i) A ten (10) percent credit is allowed if the facility, facilities, or other best management practices, provide water quality benefits in accordance with 9VAC25-870-96, Virginia Administrative Code, as amended. (ii) A ten (10) percent credit is allowed if the facility, facilities, or other best management practices, provide both stream channel erosion control benefits in accordance with 9VAC25-870-97, Virginia Administrative Code, as amended, and flood control benefits in accordance with 9VAC25-870-98, Virginia Administrative Code, as amended. (4) At the city manager's discretion, a credit of up to five percent in addition to that provided in subsection (3) above may be granted for a facility or any other best management practice that achieves benefits above those required by the City Code. (5) If an on-site stormwater management facility is part of a voluntary retrofit, the amount of credit the facility is eligible to receive in accordance with subsections (3) and (4) above shall be doubled. (6) The owner of an eligible facility that treats off-site impervious surface located within the city may take a credit for treating the off-site impervious surface. The off-site credit amount shall be calculated in the same manner as if the facility was located on the off-site parcel. However, in no case shall the total credit exceed the total amount of the annual stormwater utility fee charged to the parcel owner. (7) On-site stream restoration credits are available to non-residential parcels that contain non-ephemeral streams that have been identified in (i) a city watershed master plan; or (ii) a city total maximum daily load action plan, as being in need of restoration due to existing erosion, potential erosion, water quality impairments, or other ecosystem health issues. The annual credit shall be based on an amount equal to the lesser of (x) one-seventh ( 1/7 ) of the costs paid by the owner of the parcel upon completion and acceptance of the work in the proposed project, or (y) fifty (50) percent of the annual stormwater utility fee determined before application of any credit. Prior to receiving a credit under this subsection (7), the parcel owner shall have executed and recorded a best management practices or facilities maintenance agreement. The city manager shall include additional criteria, requirements and procedures for implementing the credit set forth in this subsection (7). (c) Application and maintenance verification. (1) There is no fee for a credit application. (2) To apply for the initial credit for an on-site stormwater management facility or any other best management practice, the parcel owner must submit, at his or her own expense, a credit application form to be provided by the city manager. The credit application form shall require the following information: (i) A description of the type of facility or any other best management practice, the stormwater control standard met by the facility, and the year the facility was built or the other best management practice implemented; (ii) A drainage area map, drawn to scale, for the facility or other best management practice showing the drainage boundaries and the impervious area treated by the facility or other best management practice in square feet; (iii) As-built or other acceptable engineering plans for the facility or other best management practice; (iv) A narrative of the known maintenance history of the facility or other best management practices, including routine maintenance and significant structural maintenance and repair; (v) A copy of the city's standard maintenance agreement that has been executed by the city and properly recorded in the land records of the Office of the Clerk of the Circuit Court of the City of Roanoke. If there is no existing maintenance agreement, then one (1) must be completed and properly recorded; (vi) Information on any public funds used to construct, repair, upgrade, or retrofit the facility or other best management practice, including the amount and the date(s); (vii) Calculations to determine the monetary amount of the claimed credit; and (viii) A completed inspection checklist certifying that the facility or other best management practice is functioning as originally designed. "Functioning as originally designed" means that the facility or other best management practice is operating in accordance with the original design specifications, regardless of the standard in effect at the time of the installation. The checklist must be signed and sealed by a professional engineer. The inspection checklist shall be no more than one (1) year old at the time of application. (3) Once approved, the parcel owner will continue to receive the credit as long as the facility or other best management practice continues to function as originally designed, and subject to reporting requirements established by the city manager. The city manager may revoke the credit if an inspection by the city manager or a designated representative determines that the facility or other best management practice is no longer being properly maintained or functioning as designed. Such revocation will be effective thirty (30) days after the city manager has notified the parcel owner in writing of the deficiency(s) and if the problems are not resolved. The revocation may be delayed for an additional period, at the discretion of the city manager, provided that the parcel owner is diligently pursuing work to eliminate deficiencies. (4) Any maintenance or functional deficiencies must be remedied at the owner's expense before a facility or other best management practice may qualify, or re-qualify (after revocation), for a credit. (5) The city manager shall have the discretion to modify the application and maintenance verification criteria and the credit application form for credit applications, including the definition of properties qualified to submit credit applications and any such other modifications shall be included in the policies, procedures, or manuals adopted by the city manager pursuant to this section 11.5-7. (d) Public improvements to private facilities. A privately owned and operated facility or any other best management practice that was constructed or upgraded using city provided funds shall be treated in the following manner: (1) Newly constructed facility or any other best management practice. The parcel owner shall not be eligible for a credit until such time that the cumulative amount of credit that otherwise would have been allowed if the facility or any other best management practice was constructed using private funds equals or exceeds the city's investment. (2) Existing, non-functioning facility or any other best management practice upgraded to function properly. The parcel owner shall not be eligible for a credit until such time that the cumulative amount of credit that otherwise would have been allowed if the upgrade or retrofit was constructed using private funds equals or exceeds the city's investment. (3) Existing, functioning facility or any other best management practice upgraded and eligible for higher credit. The parcel owner shall be eligible for the original credit. At such time that the cumulative difference between the original credit and the higher credit equals or exceeds the city's investment, the parcel owner shall also be eligible for the higher credit. For purposes of this section 11.5-7(d) only, a privately owned and operated facility or any other best management practice implemented by a parcel owner does not include parcels owned and managed by the city or a governmental entity, agency, institution, or instrumentality. (e) Credit for industrial stormwater permits. Subject to the maximum credit in subsection (b)(1) above, a ten percent credit is allowed for any parcel, or portion of a parcel, that is subject to, and in compliance with, an individual or general Virginia pollutant discharge elimination system industrial stormwater permit issued in accordance with 9VAC25-31-120, Virginia Administrative Code, as amended. To apply for the initial credit, the parcel owner must provide the city manager with proof of permit coverage, the date of permit expiration, and a cover letter affirming that the parcel is in full compliance with the permit requirements. The credit will expire on permit expiration unless the parcel owner provides proof to the city manager that the permit has been renewed. (f) Affirmative duty and timing. It is the sole responsibility of the parcel owner to apply for a credit in accordance with policies, procedures, and manuals adopted by the city manager. A credit that is approved by January 1 of a given year thereafter will be applied in full to the upcoming billing cycle.

(Ord. No. 39808, § 1, 11-18-13; Ord. No. 39977, 6-16-14, eff. 7-1-14; Ord. No. 41172, § 1, 6-18-18)