§ 11.7-6 — Plan requirements
Code of Ordinances of the City of Roanoke, Virginia (Codified through Ordinance No. 43473, enacted September 21, 2026. (Supp. No. 95, Update 1)) · Roanoke Code of Ordinances § 11.7-6
Corpus is an independent public-information project, not the official City of Roanoke website. Stable reference: corpuslaw.us/code/5be1fa5a-0248-40e5-b51d-9687c649f615
Sec. 11.7-6. - Plan requirements.
(a) Except as provided herein, no person may engage in any land-disturbing activity until an erosion and sediment control plan for the land-disturbing activity has been submitted to the program administrator and has been approved by the program administrator. No approval to begin a land disturbing activity will be issued unless evidence of state permit coverage is obtained where it is required. (b) Required contents for an erosion and sediment control plan and required certification of the plan preparer shall be as set forth below: (1) Where the land disturbance involves the construction of any single-family dwelling and such disturbed area is less than ten thousand (10,000) square feet: (i) The plan shall consist of an agreement in lieu of a plan, such agreement to be supplied by the department of planning, building and development. (ii) When the agreement in lieu of a plan form is submitted with a building and zoning permit application, it shall be considered as an executed agreement between the owner and the city when the building and zoning permit is issued. The program administrator may impose additional requirements as a condition of approval or as field changes require once the project is underway. (2) Where the disturbed area is two thousand five hundred (2,500) square feet or more, but less than ten thousand (10,000) square feet: (i) The plan shall consist of a site plan demonstrating compliance with 9VAC25-840-40, Minimum Standards 1 through 18. The Program Administrator may require documentation of compliance with Minimum Standard 19, if the Program Administrator determines that a proposed conveyance or downstream channel is inadequate based on documented flooding issues, or the proposed work could impede flow causing upstream flooding. (ii) The plan shall be prepared by a certified responsible land disturber, a certified landscape architect, or a professional engineer. (iii) Exception - the program administrator may allow an agreement in lieu of a plan for temporary activities, such as a construction laydown area, when the area of disturbance will be restored by a permanent seeding, or by permanent seeding or restoration to its original established condition if the existing condition is not a lawn or yard. (3) Where the disturbed area is ten thousand (10,000) square feet or more: (i) The plan shall consist of a site plan and narrative demonstrating compliance with 9VAC25-840-40, Minimum standards 1 through 19. (ii) The plan shall be prepared by a certified landscape architect or a professional engineer. (iii) When an erosion and sediment control plan or agreement in lieu of a plan is required, it shall be incorporated into the basic development plan or comprehensive development plan required by chapter 36.2, Zoning, of the City Code, or into a subdivision site plan required by chapter 31.1, subdivisions, of the City Code. The review of such plan or agreement shall occur within sixty (60) days of their submittal, or such review time frames as set out for such plans in chapters 31.1, subdivisions, and 36.2, Zoning of the City Code, whichever is shorter. (iv) The standards contained within the Virginia Erosion and Sediment Control Regulations and the Virginia Erosion and Sediment Control Handbook, as amended, are to be used by the applicant when making a submittal under the provisions of this chapter and in the preparation of an erosion and sediment control plan. The program administrator, in considering the adequacy of a submitted plan, shall be guided by the same standards, regulations and guidelines. When the standards vary between the publications, the state regulations shall take precedence. (c) The program administrator shall review erosion and sediment control plans submitted to the city and grant written approval if the program administrator determines that the plan meets the requirements of sections 62.1-44.15:51 through section 62.1-44.15:65 of the Code of Virginia and the regulations promulgated by the Virginia Department of Environmental Quality, and if the person responsible for carrying out the plan certifies that such person will properly perform the measures included in the plan and will conform to the provisions of this chapter. In addition, as a prerequisite to engaging in the land-disturbing activities shown on the approved plan, the person responsible for carrying out the plan shall provide the name of the responsible land disturber, to the program authority, who will be in charge of and responsible for carrying out the land-disturbing activity. Failure to provide the name of the responsible land disturber, prior to engaging in land-disturbing activities may result in revocation of the approval of the plan and the person responsible for carrying out the plan shall be subject to the penalties provided in this chapter. (1) When the plan is determined to be inadequate, written notice of disapproval stating the specific reasons for disapproval shall be communicated to the applicant. The notice shall specify such modifications, terms and conditions that will permit approval of the plan. If no action is taken within forty-five (45) days, the plan shall be deemed approved and the person authorized to proceed with the proposed activity. (2) The program administrator shall approve or disapprove any erosion and sediment control plan that has been previously disapproved within twelve (12) business days after the plan has been revised and resubmitted. (d) The program administrator shall approve the plan when it is determined that the plan meets the requirements of sections 62.1-44.15:51 through section 62.1-44.15:65 of the Code of Virginia and the regulations promulgated by the Virginia Department of Environmental Quality and the applicant certifies on the plan that such applicant will properly perform the measures included in the plan and will conform to the provisions of this chapter. (e) Once a land disturbing permit has been issued, the program administrator may require changes to an approved plan if an inspection reveals that the plan is inadequate to satisfy applicable regulations, or if the permittee finds that the approved plan cannot be effectively carried out because of changed circumstances or for other reasons. Any proposed amendments to the plan shall be consistent with the requirements of this chapter and agreed to by the program administrator and the permittees. (f) Variances: The program administrator may waive or modify any of the standards that are deemed to be inappropriate or too restrictive for site conditions, by granting a variance. A variance may be granted under these conditions: (1) At the time of plan submission, an applicant may request a variance to become part of the approved erosion and sediment control plan. The applicant shall explain the reasons for requesting variances in writing. Specific variances which are allowed by the program administrator shall be documented in the plan. (2) During construction, the person responsible for implementing the approved plan may request a variance in writing from the program administrator. The program administrator shall respond in writing either approving or disapproving such a request. If the program administrator does not approve a variance within ten (10) days of receipt of the request, the request shall be considered to be disapproved. Following disapproval, the applicant may resubmit a variance request with additional documentation. (3) The program administrator shall consider variance requests judiciously, keeping in mind both the need of the applicant to maximize cost effectiveness and the need to protect off-site properties and resources from damage. (g) In order to prevent further erosion, the program administrator may require approval of a plan for any land identified in the local program as an erosion impact area. (h) When a land-disturbing activity will be required of a contractor performing construction work pursuant to a construction contract, the preparation, submission, and approval of an erosion and sediment control plan shall be the responsibility of the owner. (i) In accordance with the procedure set forth in section 62.1-44.15:55(E) of the Code of Virginia, any person engaging, in more than one jurisdiction, in the creation and operation of wetland mitigation or stream restoration banks, which have been approved and are operated in accordance with applicable federal and state guidance, laws, or regulations for the establishment, use, and operation of wetland mitigation or stream restoration banks, pursuant to a mitigation banking instrument signed by the Virginia Department of Environmental Quality, the Marine Resources Commission, or the U.S. Army Corps of Engineers, may, at the option of that person, file general erosion and sediment control specifications for wetland mitigation or stream restoration banks annually with the Virginia State Water Control Board for review and approval consistent with guidelines established by the Virginia State Water Control Board. Approval of general erosion and sediment control specifications does not relieve the owner or operator from compliance with any other local ordinances and regulations including requirements to submit plans and obtain permits as may be required by such ordinances and regulations. (j) State agency and federal entity projects are exempt from the provisions of this chapter except as provided for in section 62.1-44.15:56 of the Code of Virginia.
(Ord. No. 41142, § 2, 5-21-18)
Ask a question about Roanoke law
Corpus searches the Roanoke sections it holds and shows the ones that match, with their citations. Free, no sign-in.