For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 36.2-335 — River and Creek Corridors Overlay District (RCC)

Code of Ordinances of the City of Roanoke, Virginia (Codified through Ordinance No. 43473, enacted September 21, 2026. (Supp. No. 95, Update 1)) · Roanoke Code of Ordinances § 36.2-335

Corpus is an independent public-information project, not the official City of Roanoke website. Stable reference: corpuslaw.us/code/1fe78b6a-d71b-4c46-a6af-c37ad980a80a

Sec. 36.2-335. - River and Creek Corridors Overlay District (RCC).

(a) Purpose. The purpose of the River and Creek Corridors Overlay District (RCC) is to recognize the Roanoke River and its tributaries as valuable water resources in the City and to designate certain areas along their banks as being critical to their protection in order to ensure that such streams and adjacent lands will fulfill their natural functions. Stream systems are comprised of the stream and their drainage basins. Streams have the primary natural functions of conveying storm and ground water, storing floodwater, and supporting aquatic and other life. Vegetated lands adjacent to the stream channel in the drainage basin serve as a buffer to protect the stream system's ability to fulfill its natural functions. Primary natural functions of the buffer include protection of water quality by filtering pollutants, provision of storage for floodwaters, and provision of suitable habitats for wildlife. The intent of the regulations of this section is to establish performance and development standards in the critical areas along the banks of the Roanoke River and certain tributaries in a manner that protects and restores water quality and conserves surface water functions. The regulations of this district shall be in addition to those of the Floodplain Overlay District (F). In order to provide for the health, safety, and general welfare of the citizens of the City, the regulations of the RCC Overlay District are intended to: (1) Avoid land uses and development activities that pose a danger to, and degradation of, these water resources; (2) Minimize clearing and grading activities or similar activities that disturb or destroy site vegetation, with the goal that the natural vegetation, features, and qualities of properties along the Roanoke River and its tributaries will be protected to the maximum extent possible, consistent with the recommendations of the City's Comprehensive Plan; and (3) Implement additional erosion and sediment control practices, the maintenance and installation of buffer areas of natural vegetation, and the use of best management practices in order to minimize the impacts of excessive soil loss and the adverse effects of nonpoint source pollutants on the water quality of the Roanoke River and its tributaries. (b) Applicability. (1) The City Council may, in the manner provided for amending this chapter, pursuant to the procedures set forth in Section 36.2-540, apply the River and Creek Corridors Overlay District (RCC) to properties that abut the banks of the Roanoke River or its unenclosed tributaries. For purposes of the application of this overlay district, any property separated from the bank of the Roanoke River or a tributary by a public right-of-way or railroad right-of-way shall not be deemed to be abutting the bank. (2) Any River and Creek Corridors Overlay District (RCC) designated by the City Council as provided for in subsection (1), above, shall be shown as an overlay to the existing underlying district on the Official Zoning Map. As such, the provisions in this section shall serve as a supplement to the underlying base zoning district regulations. Where a conflict exists between the regulations relating to the RCC Overlay District and those of any underlying base zoning district, the more restrictive provisions shall apply. (3) Upon development of any property within the River and Creek Corridors Overlay District (RCC), such property shall comply with the buffer requirements of this section, except those which, as of the effective date of this chapter, have previously secured a vested property right pursuant to Section 36.2-108. (4) Redevelopment of a property, or expansion of existing structures or uses, shall comply with the buffer requirements of this section; however, uses and structures previously approved and constructed in a buffer may remain. (5) Nothing in this section shall be construed to affect the applicability of the regulations of the Floodplain Overlay District (F). The regulations of this section are in addition to those of the Floodplain Overlay District (F). When any conflict exists between this section and the regulations of the Floodplain Overlay District, the stricter provision shall govern. (c) Definitions. Certain words and terms used in this section shall be defined as set forth below. Where any conflict exists between the definitions below and those set forth in Appendix A, the definitions of this subsection shall govern for the purposes of the regulations of this section. Best Management Practices (BMPs): A structural or nonstructural management based practice used singularly or in combination to reduce nonpoint source input to receiving waters in order to achieve water quality protection goals. Nonstructural BMPs are nonengineered methods to control the amount of nonpoint source pollution and may include land use controls and vegetated buffers. Structural BMPs are engineered structures that are designed to reduce the delivery of pollutants from their source or to divert contaminants away from the rivers and tributaries. Structural BMPs may include wet detention ponds, detention basins, grass swales and ditches, and infiltration devices. Drainage basin: The area of land which drains to a given point on a body of water. Riparian buffer: A natural vegetated area left undisturbed or an established vegetated area, adjacent to the bank of a watercourse, through which stormwater runoff flows in a diffuse manner so that the runoff does not become channelized and which provides for infiltration of the runoff and filtering out sediment and other nonpoint source pollutants from runoff before it reaches a watercourse. Stream: Any part of a watercourse, naturally occurring or artificially created, for the purpose of conveying water from ground water or surface runoff. Top of bank: The boundary line between a body of water and the land. This line shall consist of the sloping margin of, or the ground bordering, a river or creek and serving to confine the water to the natural channel during the normal course of flow. It is best marked where a distinct channel has been eroded to the valley floor or where there is a cessation of land vegetation. (d) Riparian buffer requirement. (1) Within the RCC Overlay District, a riparian buffer shall be established and shall consist of all land adjacent to, and fifty (50) feet landward from, the top of the banks of the Roanoke River or the applicable tributary. The fifty-foot buffer width shall be measured horizontally on a line perpendicular to the surface water, landward from the top of the bank on each side of the river or tributary. When the landward boundary of the riparian buffer falls within an improved public right-of-way, the riparian buffer shall be defined as the remainder of the improved public right-of-way and shall not extend beyond that public right-of-way. (2) The riparian buffer boundaries shall be clearly delineated on all site-specific plans submitted for approval pursuant to this chapter. (3) The riparian buffer boundaries shall be clearly marked on-site prior to any land disturbing activities, and shall remain marked until all land disturbing activity has been completed. (4) All land disturbing activity within the required riparian buffer shall comply with Chapter 11.1, Erosion and Sediment Control, of this Code. (5) No principal or accessory uses or structures shall be permitted within the area of the required riparian buffer. (e) Riparian buffer standards. (1) To minimize the adverse effects of land use activities on the Roanoke River and its tributaries, a fifty-foot buffer area of vegetation that is effective in retarding runoff, preventing erosion, and filtering nonpoint source pollution from runoff, shall be retained and maintained if present, and where it does not exist, shall be established and maintained upon any land disturbing activity, except as provided in Section 36.2-335(f)(1), in any area delineated in subsection (d) above as a riparian buffer. (2) In order to maintain the functional value of the riparian buffer area, indigenous vegetation shall be preserved to the maximum extent possible. (3) Within the required riparian buffer area, no vegetation may be cleared or otherwise significantly disturbed, except as provided in subsection (4) below, no grading or excavation work may be performed, and no fill or other materials may be placed except as shown on the approved Erosion and Sediment Control Plan. (4) Removal of vegetation within the required riparian buffer area shall be permitted only in accordance with the following provisions: (A) Trees may be pruned or removed as necessary to provide limited sight lines and vistas, provided that where removed, they shall be replaced with other vegetation that is equally effective in retarding runoff, preventing erosion, and filtering nonpoint source pollution from runoff. (B) Dead, diseased, or dying trees may be removed. (5) All unvegetated areas within the required riparian buffer area shall be vegetated with appropriate riparian, erosion controlling plant material. Riparian material shall be defined as indigenous vegetation which naturally occurs along the river and creek and is suited to local conditions. (6) With the approval of the Zoning Administrator, manmade materials may be used in conjunction with vegetation to stabilize the riverbank or creek bank only where it is shown that vegetation alone will not stabilize the bank. (7) Access paths shall be constructed and surfaced so as to effectively control erosion. (8) Runoff from new development or redevelopment shall be directed toward areas covered with vegetation for surface infiltration catch basins, avoiding channeling and preventing concentrated flows of surface water. Piped storm sewers shall be permitted. (f) Permitted buffer impacts. The following development activities shall be permitted within the required riparian buffer area of the RCC Overlay District, provided no more land is disturbed than is necessary to provide for the desired installation or construction, all required permits have been issued, and any land disturbance activity complies with all erosion and sediment control requirements of Chapter 11.1 of this Code for the stabilization of disturbed areas to minimize negative effects on the quality of surface waters: (1) Any maintenance activity of an existing use or structure, provided it does not change or affect the quality, rate, volume, or location of surface water discharge, or involve the destruction of vegetation, as determined by the Zoning Administrator in consultation with the City Engineer; (2) Emergency removal of debris resulting from floods or other natural disasters; (3) Linear utility lines, railroad tracks, public streets or other public infrastructure improvements, and private streets; (4) Public passive recreation uses such as greenways and pervious trails, provided that to the extent possible, such pathways use existing and proposed utility alignments or previously cleared areas and minimize tree cutting to the maximum extent practicable; (5) Individual pedestrian paths connecting homeowners to the river or creek in the form of narrow, pervious footpaths with minimal tree disturbance; or (6) Historic preservation of existing structures or archaeological activities. (g) Variances. When a hardship would result from adherence to the application of the requirements of this section, a request for a variance may be made pursuant to the procedures set forth in Section 36.2-561.

(Ord. No. 40710, § 1, 12-5-16)

Ask a question about Roanoke law

Corpus searches the Roanoke sections it holds and shows the ones that match, with their citations. Free, no sign-in.