For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 36.2-407.3 — Data center

Code of Ordinances of the City of Roanoke, Virginia (Codified through Ordinance No. 43473, enacted September 21, 2026. (Supp. No. 95, Update 1)) · Roanoke Code of Ordinances § 36.2-407.3

Corpus is an independent public-information project, not the official City of Roanoke website. Stable reference: corpuslaw.us/code/96161ece-94a6-4d22-afc1-4bb492e1bd10

Sec. 36.2-407.3. - Data center.

(a) Applicability. The supplemental regulations set out in this section shall apply to data centers as defined by this chapter as of right or by special exception. (b) Procedure. All information required in the supplemental regulations is required with the initial application for use, including a zoning amendment application and application for special exception. (c) Minimum development requirements for data centers: (1) Data center must be served by public water and public sewer. (2) Any water cooling must use a closed loop or recycled water system. (3) Cooling water flushing and refills are limited to times approved by Western Virginia Water Authority. (d) Setbacks. Data center buildings and all associated equipment and accessory structures (such as generators, HVAC, and battery backup) must be set back at least: (i) one hundred fifty (150) feet from all lot lines and (ii) three hundred (300) feet from any residential or multi-purpose zoning district. (e) Generators. (1) Routine generator exercise maintenance is limited to Monday — Friday between the hours beginning at 10:00 a.m. and ending at 4:00 p.m. (2) Generators must be enclosed in an enclosure limiting sound to seventy (70) dBA measured twenty-three (23) feet from the generator. (3) Onsite generators must meet or exceed EPA Tier 4 emission standards. (4) Battery energy storage systems are permitted. (f) Landscaping/screening. (1) Fencing may not be placed in front of landscaping adjacent to roads. There must be landscaping in front of any fence adjacent to public roads. Barbed wire fencing is not permitted. (2) Tree plantings adjacent to public roads abutting residential or multi-purpose zoning districts, must consist of a minimum of three (3) staggered rows of evergreen trees from approved tree list, planted fifteen (15) feet on center. The Zoning Administrator or their designated agent may require the plantings to be placed where they will best reduce noise from the facility and block the view from public streets and nearby properties. (g) Building design. (1) Any building facade visible from public streets must incorporate a differentiation that breaks the mass of the facade every one hundred (100) horizontal linear feet by including at least one (1) of the following changes in form and one (1) of the following design elements: (i) Change in building height of a minimum of five (5) feet for buildings less than thirty (30) feet tall and ten (10) feet for buildings thirty (30) feet tall and taller; or (ii) Building step-backs or recesses with a minimum depth of two and one-half (2.5) feet; (iii) Design elements that are either: (a) Change in building materials; or (b) Change in pattern, texture and/or color. (iv) The building design must include a main entrance that is differentiated from the rest of the façade. (2) The following materials are not permitted on building façades: aluminum siding, unfinished or untreated wood siding, plywood siding (T1-11), vinyl siding, scored stucco (imitation brick or stone), and foam-based products. (h) Noise. (1) Any noise that emanates from all activity associated with any data center is limited to a maximum sound level of sixty (60) dBa during the daytime and fifty-five (55) dBa at nighttime. Such levels are measured at the property line. The maximum sound level in this section does not apply to: (i) Demolition work on buildings, structures, or appurtenances and/or the testing of generators consistent with the requirement of the Department of Environmental Quality; (ii) Any situation arising from sudden and reasonably unforeseen events (beyond) the control of the facility operator) that require the response of emergency vehicles or temporary use of emergency generators. (iii) Generator testing conducted between 10:00 a.m. until 4:00 p.m. unless testing at a time outside of this range is required by the Department of Environmental Quality. (2) Noise studies. The following noise propagation studies must be conducted and submitted to the Zoning Administrator: (i) A sound modeling study that demonstrates compliance with the maximum sound levels must be submitted prior to approval of a final site plan. This study must be specific to the proposed site topography, layout and building type, scale, height and construction proposed. This study must show noise conditions at the site prior to project development at set locations determined by the Zoning Administrator and must provide model-predicted noise conditions resulting from the proposed project post-development. (ii) The sound study must be prepared by a professional engineer licensed in the Commonwealth in accordance with ISO 9613 standards. (iii) The sound modeling study must include recommendations for sound mitigation measures, if they are necessary for the use to comply with maximum sound levels. These mitigation measures, if applicable, must be reflected on the site plan and incorporated into conditions of site plan approval. If mitigation measures are building related, they must be included in the building plans prior to issuance of building permit(s). In the event the sound modeling study shows compliance with the maximum sound levels of Section 36.2-407.3(g)(1) without the use of sound mitigation, no mitigation measures are required. (iv) Within sixty (60) days of issuance of a certificate of occupancy for each phase or development and at any time the Zoning Administrator requests it, a post-development sound study must be submitted. The study must be conducted at a time generally known for peak data center cooling operations. In the event the study shows that the use exceeds maximum allowable decibel levels, the operator must immediately undertake all necessary efforts to comply. (i) Equipment. All equipment necessary for cooling, ventilating, or otherwise operating the facility must be contained within an enclosed building, walled courtyard or roof parapet with a wall of sufficient height to eliminate visibility of the equipment from public streets or adjacent properties. Access to any walled courtyard or enclosed building must provide for solid doors/gates. (j) Infrastructure Impact and Analysis Study. The purpose of the infrastructure analysis is to ensure that proposed data center developments do not exceed the capacity of local utility systems, degrade public service levels, or impose unmitigated external costs on the City and its residents. The analysis shall be sealed by a professional engineer (PE) authorized to practice in the Commonwealth of Virginia, and include, at a minimum, the following subsections: (1) Electrical Grid Capacity and Redundancy Study: (i) A statement of anticipated peak load in megawatts (MW) at full build-out. (ii) A letter of support or capacity from the electrical utility provider confirming that the existing grid can support the load without degrading service to existing customers. (iii) Detailed specifications for any proposed on-site substations, including required acreage and screening. (iv) An Emergency Power Plan detailing the number, capacity, and testing schedules of backup diesel or natural gas generators, including a strategy for fuel storage and spill containment. (2) Water Supply and Thermal Management Plan: (i) An estimate of average and peak daily water consumption for cooling purposes (gallons per day). (ii) A description of the cooling technology (e.g., air-cooled, evaporative, or liquid cooling). (iii) If using evaporative cooling, an Impact Assessment on the local water table or municipal supply, including a contingency plan for operations during "Drought Stage" declarations. (iv) A Wastewater Discharge Report detailing the volume and chemical composition of "blowdown" water or thermal discharge entering the municipal sewer system. (3) Connectivity and Right-of-Way Analysis: (i) A map of proposed fiber optic route connections. (ii) An assessment of any required trenching or overhead line installations within public rights-of-way, including a restoration plan for disturbed infrastructure. (4) Transportation and Public Safety Assessment: (i) A Traffic Impact Analysis (TIA) focusing on the construction phase (peak heavy vehicle trips) and permanent staffing levels. (ii) A Hazardous Materials Management Plan for on-site battery storage (UPS) and backup fuel, reviewed and signed off by the City of Roanoke Fire Marshall's office.

(Ord. No. 43434, § 1, 7-6-2026)

Ask a question about Roanoke law

Corpus searches the Roanoke sections it holds and shows the ones that match, with their citations. Free, no sign-in.