Sec. 2-648. - Design-build or construction management contracts when authorized; procedures.
(a) When authorized. (1) Prior to making a determination as to the use of design-build or construction management for a specific construction contract, the city shall have in its employ or under contract a licensed architect or engineer with professional competence appropriate to the project who shall advise the city regarding the use of design-build or construction management for that project and who shall assist the city with the preparation of the request for proposal and evaluation of such proposals. (2) Prior to issuing a request for proposal for any design-build or construction management contract for a specific construction project, the city shall follow the procedures set forth herein and shall have documented in writing that for a specific construction project: (i) a design-build or construction management contract is more advantageous than a competitive sealed bid construction contract; (ii) there is a benefit to the public body by using a design-build or construction management contract; and (iii) that competitive sealed bidding is not practical or fiscally advantageous. (3) Design-build construction projects shall include a two-step competitive negotiation process consistent with the standards established by the division of engineering and buildings of the department of general services for state agencies. (4) Construction management contracts shall include selection procedures and required construction management terms consistent with the procedures as adopted by the secretary of administration. (b) Procedures. The following procedures shall govern the selection, evaluation and award of design-build or construction management contracts: (1) Evaluation committee. The city shall establish an evaluation committee ("committee") to be responsible for evaluating the qualifications of potential offerors of design-build or construction management services and reviewing proposals submitted for such services. This committee shall consist of a minimum of five and a maximum of nine voting members. The members of the committee shall have expertise relevant to the project, with backgrounds in such areas as project design, construction, finance, contract review, and project management. The committee shall include the architect or professional engineer advising the city on the use of design-build or construction management contracts, who shall be a non-voting member unless he or she is an employee of the city. The membership of the committee shall be determined by the city manager or the city manager's designee. (2) Request for qualifications; prequalification. a. The city shall publish notice of its request for qualifications ("RFQ") at least ten days prior to the date set for receipt of qualifications by posting in the purchasing agent's office and in a local newspaper of general circulation in the city so as to provide reasonable notice to the maximum number of offerors that can be reasonably anticipated to submit qualifications in response to the particular request. Additionally, qualifications may be solicited directly from vendors. If practicable, the notice shall also be published in appropriate national trade publications. b. The RFQ shall indicate in general terms those services sought by the city, specifying the factors to be used in evaluating the potential offeror's qualifications. The RFQ shall contain or incorporate by reference other applicable contractual terms and conditions including any unique capabilities to be required by the offeror. The RFQ shall request of potential offerors only information as is appropriate for an objective evaluation of all offerors pursuant to such criteria. Prior to the issuance of the RFQ, the city shall establish procedures whereby comments concerning specifications or other provisions in the RFQ can be received and considered prior to the time set for receipt of qualifications. c. The committee shall evaluate each responding offeror's qualifications submittal, and any other relevant information, and shall select a minimum of two offerors deemed to be fully qualified and best suited. An offeror may be denied prequalification only upon the grounds set forth in Code of Virginia, § 2.2-4317. At least 30 days prior to the date established for the submission of proposals, the city shall advise each offeror in writing as to whether that offeror has been prequalified. In the event that an offeror is denied prequalification, the written notice shall state the reasons for the denial of prequalification and the factual basis for such reasons. (3) Request for proposal. a. The city shall prepare a request for proposal ("RFP") that includes and defines the criteria of the specific construction project in areas such as site plans; floor plans; exterior elevations; basic building envelope materials; fire protection information plans; structural, mechanical (HVAC), and electrical systems; and special telecommunications. The RFP may also define such other requirements as the city determines appropriate for a particular project. The RFP shall also include the criteria used to evaluate each proposal. The city shall establish procedures whereby comments concerning specifications or the provisions contained in the RFP can be received and considered prior to the time set for receipt of proposals. For construction management contracts, the RFP shall define the pre-design, design phase, bid phase, and/or construction phase services, as appropriate, to be provided by the construction manager. b. At least ten days prior to the date set for the receipt of proposals, the city shall invite those potential offerors identified by the qualification process described above to submit sealed technical and cost proposals. An offeror's cost proposal shall be sealed separately from its technical proposal, and, in the case of construction management contracts, shall include the offeror's lump sum price for all requested preconstruction phase services. For construction management contracts, a lump sum price or a guaranteed maximum price shall be established for all construction services using information provided in the RFP. Upon receipt of an offeror's technical and cost proposals, an offeror's cost proposal shall be secured and kept sealed until evaluation of all technical proposals is completed. (4) Evaluation and selection of construction manager. a. Based on criteria established in the RFP, the committee shall evaluate each of the proposals. As a part of the evaluation process, the committee shall grant each of the offerors an equal opportunity for direct and private communication with the committee. Each offeror shall be allotted the same fixed amount of time. In its conversations with offerors, the committee shall exercise care to discuss the same owner information with all offerors. In addition, the committee shall not disclose any trade secret or proprietary information for which the offeror has invoked protection pursuant to Code of Virginia, § 2.2-4342. b. Based upon its review of each offeror's proposal, the committee shall determine whether any changes to the RFP should be made to clarify errors, omissions or ambiguities in the RFP or to incorporate project improvements or additional details, or both, identified by the committee during its review. If such changes are required, an addendum shall be provided to each offeror. c. Based on any revisions to the proposal, the committee shall conduct negotiations with each offeror. Price shall be considered but need not be the sole determining factor. After negotiations have been conducted with each offeror, the committee shall make its recommendation on the selection of the construction manager to the city based on its evaluation and negotiations. d. The committee shall make its recommendation on the selection of the construction manager to the city based on its evaluations and negotiations. Unless otherwise specified in the RFP, award of the construction management contract shall be awarded to the fully qualified offeror who submits an acceptable proposal determined to be the best value in response to the RFP. (5) Evaluation and selection of design-builder. a. Based on the criteria established in the RFP, the committee shall evaluate each of the technical proposals. As a part of the evaluation process, the committee shall grant each of the offerors an equal opportunity for direct and private communication with the committee. Each offeror shall be allotted the same fixed amount of time. In its conversation with offerors, the committee shall exercise care to discuss the same owner information with all offerors. In addition, the committee shall not disclose any trade secret or proprietary information for which the offeror has invoked protection pursuant to Code of Virginia, § 2.2-4342. b. Based upon its review of each offeror's technical proposal, the committee shall determine whether any changes to the RFP should be made to clarify errors, omissions or ambiguities in the RFP or to incorporate project improvements or additional details, or both, identified by the committee during its review. If such changes are required, an addendum shall be provided to each offeror. c. Based on any revisions to the technical proposals, the committee and an offeror may negotiate additive and/or deductive modifications to the offeror's cost proposal. In addition, an offeror may submit sealed additive and/or deductive modifications to its original sealed cost proposal, which are not based upon revisions to the technical proposals. At the conclusion of this process, the committee shall publicly open, read aloud, and tabulate the cost proposals. The committee shall add or deduct from the appropriate cost proposal any cost adjustments contained in amendments submitted by an offeror. d. The committee shall make its recommendation on the selection of the design-builder to the city based on its evaluations and negotiations. Unless otherwise specified in the RFP, award of the design-build contract shall be awarded to the fully qualified offeror who submits an acceptable proposal determined to be the best value in response to the RFP. (c) The city shall not be required to award a contract; the city reserves the right to reject any and all proposals.
(Ord. No. 112-96, § 1(20.5-44), 12-4-1996; Ord. No. 11-O-097, § 1, 11-16-2011)