SEC. 31-716. - TELECOMMUNICATIONS FACILITIES.
(a) PURPOSE. The purpose of this Ordinance is to establish general guidelines for the siting of wireless communications towers and Antennas. The goals of this Ordinance are to: (1) Protect residential areas and land uses from potential adverse impacts of towers and Antennas; (2) Encourage the location of towers in non-residential areas; (3) Minimize the total number of towers throughout the community; (4) Strongly encourage the joint use of new and existing tower sites as a primary option rather than construction of additional single-use towers; (5) Encourage users of towers and Antennas to locate them, to the extent possible, in areas where the adverse impact on the community is minimal; (6) Encourage users of towers and Antennas to configure them in a way that minimizes the adverse visual impact of the towers and antennas through careful design, siting, landscape screening, and innovative camouflaging techniques; (7) Enhance the ability of the providers of telecommunications services to provide such services to the community quickly, effectively and efficiently; (8) Consider the public health and safety of communication towers; and (9) Avoid potential damage to adjacent properties from tower failure through engineering and careful siting of tower structures. In furtherance of these goals, the City shall give due consideration to the Comprehensive Plan, the zoning Ordinance (Article 4 of this Ordinance), existing land use, and environmentally sensitive areas in approving sites for the location of towers and Antennas. It is the policy of the City of Suffolk that new telecommunications towers be built at the lowest height possible that will still allow for Co-Location opportunities. (b) DEFINITIONS. For the purpose of this section the following terms are defined below: ADMINISTRATIVE REVIEW-ELIGIBLE PROJECT. A Project that provides for the installation or construction of a New Structure that is not more than 50 feet above ground level, provided that the structure with attached wireless facilities is (i) not more than 10 feet above the tallest existing Utility Pole located within 500 feet of the New Structure within the same public right-of-way or within the existing line of Utility Poles; (ii) not located within the boundaries of a local, state, or federal historic district; (iii) not located inside the jurisdictional boundaries of a locality having expended a toll amount equal to or greater than 35 percent of its general fund operating revenue, as shown in the most recent comprehensive annual financial report, on undergrounding Projects since 1980; and (iv) designed to support small cell facilities; or the Co-Location on any Existing Structure of a Wireless Facility that is not a Small Cell Facility. ANTENNA. Communications equipment that transmits or receives electromagnetic radio signals used in the provision of any type of wireless communications services. BASE STATION. A station that includes a structure that currently supports or houses an Antenna, transceiver, coaxial cables, power cables, or other associated equipment at a specific site that is authorized to communicate with mobile stations, generally consisting of radio transceivers, Antennas, coaxial cables, power supplies, and other associated electronics. CO-LOCATE. To install, mount, maintain, modify, operate, or replace a Wireless Facility on, under, within, or adjacent to a Base Station, building, Existing Structure, Utility Pole, or Wireless Support Structure. "Co-Location" has a corresponding meaning. EXISTING STRUCTURE. Any structure that is installed or approved for installation at the time a Wireless Services Provider or Wireless Infrastructure Provider provides notice to the City of an agreement with the owner of the structure to Co-Locate equipment on that structure. "Existing Structure" includes any structure that is currently supporting, designed to support, or capable of supporting the attachment of wireless facilities, including towers, buildings, Utility Poles, light poles, flag poles, signs, and Water Towers. MICRO-WIRELESS FACILITY. A Small Cell Facility that is not larger in dimension than 24 inches in length, 15 inches in width, and 12 inches in height and that has an exterior Antenna, if any, not longer than 11 inches. NEW STRUCTURE. A Wireless Support Structure that has not been installed or constructed, or approved for installation or construction, at the time a Wireless Services Provider or Wireless Infrastructure Provider applies to the City for any required zoning approval. PROJECT. Means (i) the installation or construction by a Wireless Services Provider or Wireless Infrastructure Provider of a New Structure or (ii) the Co-Location on any Existing Structure of a Wireless Facility that is not a Small Cell Facility. "Project" does not include the installation of a Small Cell Facility by a Wireless Services Provider or Wireless Infrastructure Provider on an Existing Structure to which the provisions of [Code of Virginia] § 15.2-2316.4 apply. SMALL CELL FACILITY. A Wireless Facility that meets both of the following qualifications: (i) each Antenna is located inside an enclosure of no more than six cubic feet in volume, or, in the case of an Antenna that has exposed elements, the Antenna and all of its exposed elements could fit within an imaginary enclosure of no more than six cubic feet and (ii) all other wireless equipment associated with the facility has a cumulative volume of no more than 28 cubic feet, or such higher limit as is established by the Federal Communications Commission. The following types of associated equipment are not included in the calculation of equipment volume: electric meter, concealment, telecommunications demarcation boxes, back-up power systems, grounding equipment, power transfer switches, cut-off switches, and vertical cable runs for the connection of power and other services. STANDARD PROCESS PROJECT. Any Project other than an Administrative Review-Eligible Project. UTILITY POLE. A structure owned, operated, or owned and operated by a public utility, local government, or the Commonwealth that is designed specifically for and used to carry lines, cables, or wires for communications, cable television, or electricity. WATER TOWER. A water storage lank, or a standpipe or an elevated tank situated on a support structure, originally constructed for use as a reservoir or facility to store or deliver water. WIRELESS FACILITY. Equipment at a fixed location that enables wireless communications between user equipment and a communications network, including (i) equipment associated with wireless services, such as private, broadcast, and public safety services, as well as unlicensed wireless services and fixed wireless services, such as microwave backhaul, and (ii) radio transceivers, Antennas, coaxial, or fiber-optic cable, regular and backup power supplies, and comparable equipment, regardless of technological configuration. WIRELESS INFRASTRUCTURE PROVIDER. Any person that builds or installs transmission equipment, wireless facilities, or Wireless Support Structures, but that is not a Wireless Services Provider. WIRELESS SERVICES. (i) "Personal wireless services" as defined in 47 U.S.C. § 332(c)(7)(C)(i); (ii) "personal wireless service facilities" as defined in 47 U.S.C. § 332(c)(7)(C)(ii), including commercial mobile services as defined in 47 U.S.C. § 332(d), provided to personal mobile communication devices through wireless facilities; and (iii) any other fixed or mobile wireless service, using licensed or unlicensed spectrum, provided using tireless facilities. WIRELESS SERVICES PROVIDER. A provider of wireless services. WIRELESS SUPPORT STRUCTURE. A freestanding structure, such as a monopole, tower, either guyed or self-supporting, or suitable Existing Structure or alternative structure designed to support or capable of supporting wireless facilities. "Wireless Support Structure" does not include any telephone or electrical Utility Pole or any tower used for the distribution or transmission of electrical service. (c) APPLICABILITY. (1) NEW TOWERS AND ANTENNAS. All new towers or Antennas and other telecommunications facilities in the City shall be subject to these regulations except for the following: (2) EXCEPTIONS. A. Amateur radio station operators and receive only operations. This Section shall not govern any tower, or the installation of any Antenna, that is under the maximum building height of the zoning district in which such structure is located and which is owned and operated by a federally-licensed amateur radio station operator or is used exclusively for receive only operations. B. Preexisting towers or Antennas. Legally established preexisting towers and preexisting Antennas shall not be required to meet the requirements of this Section. C. AM array. For purposes of implementing this Section, an AM array, consisting of one (1) or more tower units and supporting ground system which functions as one (1) AM broadcasting Antenna, shall be considered one (1) tower. Measurements for setbacks and separation distances shall be measured from the outer perimeter of the towers included in the AM array. Additional tower units may be added within the perimeter of the AM array by right. D. Towers or Antennas used primarily by governmental agencies for public safety communications and emergency services. (d) MONOPOLE STRUCTURES shall be permitted in any zoning district in which telecommunications towers are permitted. Guyed towers or lattice towers shall be permitted only in the M-l or M-2 zoning districts. Except where permitted, in residential areas, towers shall be located only where suitable Co-Location opportunities are utilized. (e) NOTWITHSTANDING any provision to the contrary in Section 31-407, towers shall be set back not less than one foot from the edge of the public right-of-way for each foot of structure height. (f) WHERE LIGHTING IS REQUIRED and permitted by the FAA or other federal or state authority, it shall be oriented inward so as not to project onto surrounding property at ground level. In lieu of stripping, alternate lighting shall be identified per FAA requirements. The use of strobe lighting on towers is prohibited, unless required by the Federal Aviation Administration (FAA). (g) CO-LOCATION AND CAMOUFLAGING. (1) No telecommunication facility that is readily visible outside of the parcel on which it is located shall be installed closer than one-half (½) mile from another readily visible telecommunication facility that is not camouflaged unless: A. It is a Co-Located facility; B. It is situated on a multiple-user site; or C. It blends with the surrounding existing natural and man-made environment in such a manner that not more than twenty (20) feet of the facility is visible from outside of the boundaries of the parcel; or D. Technical evidence is submitted showing the infeasibility of Co-Locating it on one of these former sites. (2) If Co-Location on an existing tower is not possible due to tower height, the applicant is encouraged to rebuild the tower to the height needed for Co-Location. Space shall be provided for at least two (2) or more additional users on the tower. (3) For purposes of this Subsection: A. "Camouflaged" means a telecommunications facility that is disguised, hidden, or integrated with an Existing Structure that is not a monopole or tower, or a personal wireless service facility that is placed within an existing or proposed structure or, New Structure, tower, or mount within trees so as to be screened from view or camouflaged to appear as a non-Antenna structure (i.e., a tree, flagpole with flag, or similar items). B. "Multi-user site" means a site or parcel comprised of multiple telecommunication towers or buildings supporting one (1) or more Antennas owned or used by more than one public or private entity, excluding research and development industries with Antennas to serve internal uses only. C. "Readily visible" means an object that stands out as a prominent feature of the landscape when viewed with the naked eye. (h) SMALL CELL FACILITIES. (1) Zoning permit required for Small Cell Facilities placed on existing structures: A. A zoning permit application must be obtained and reviewed for compliance with all applicable sections of this ordinance by the Zoning Administrator. B. The Zoning Administrator must approve or deny the application within sixty (60) days of receipt of a complete application. Within ten (10) days after receipt of an application and a valid electronic mail address for the applicant, the Zoning Administrator will notify the applicant by electronic mail whether the application is incomplete and specify any missing information: otherwise, the application will be deemed complete. The sixty (60) day review period may be extended by the Zoning Administrator in writing for a period not to exceed an additional thirty (30) days. The application will be deemed approved if the Zoning Administrator fails to act within the initial sixty (60) days or an extended thirty (30) day period. C. Each single application may include up to thirty-five (35) permit requests. D. Each permit request must include the specific location of each proposed Small Cell Facility including specific identification of the Existing Structure on which the facility will be installed, specifications showing the size of the Antennas and associated equipment of each Small Cell Facility, and a statement from the owner of the Existing Structure consenting to Co-Location of the Small Cell Facility on the Existing Structure. Additionally, all applications must be accompanied by the following: (i) A technical report must be submitted by the applicant demonstrating that the proposed facility will not result in any material potential interference with other pre-existing communications facilities or with future communications facilities that have already been designed and planned for a specific location or that have been reserved for future public safety communications facilities. (ii) Documentation that access to existing and planned communications facilities will not be obstructed or impacted. (iii) Evidence that facilities do not interfere with other existing or planned utility, transportation, or other infrastructure improvements. Evidence must demonstrate that the facilities will not encroach into visibility triangles and installation of facilities will result in no adverse impacts to public safety or other critical public service needs. (2) In writing and accompanied by an explanation for denial, the Zoning Administrator may deny a proposed location or installation of a Small Cell Facility only for the reasons listed below: A. Potential interference with other pre-existing communications facilities or with future communications facilities that have already been designed and planned for a specific location or that have been reserved for future public safety communications facilities. B. The installation adversely impacts public safety or other critical public service needs. C. The installation is on publicly owned or publicly controlled property, excluding privately owned structures where the applicant has an agreement for attachment to the structure, and the installation would have an adverse aesthetic impact, (i) Facilities placed on publicly owned or publicly controlled property, excluding privately owned structures where the applicant has an agreement for attachment to the structure, shall blend with the surrounding existing natural and man-made environment in such a manner that visual impacts arc minimized. D. The absence of all required approvals from all departments, authorities, and agencies with jurisdiction over such property. E. When located within the Historic Conservation Overlay District and does not comply with Article 4, Section 31-413 of this Ordinance. F. When the application is determined to not comply with any applicable provisions of this section. (3) Removal: A. A Small Cell Facility must be removed by the Wireless Services Provider or Wireless Infrastructure Provider that installed the facility or is otherwise responsible for the facility within one (1) year after the owner of the Existing Structure withdraws or revokes its consent for Co-Location of such facility: or the owner of the Existing Structure removes the Existing Structure; or such facility is no longer in use, in which case it will be deemed abandoned and must be removed by such provider on that basis. (i) ADMINISTRATIVE REVIEW-ELIGIBLE PROJECTS AND STANDARD PROCESS PROJECTS REQUIRING ZONING APPROVAL. (1) Zoning approval required for an Administrative Review-Eligible Project or a Standard Process Project shall be subject to the following: A. Within 10 business days after receiving an incomplete application, the Zoning Administrator shall notify the applicant that the application is incomplete. The notice shall specify any additional information required to complete the application. The notice shall be sent by electronic mail to the applicant's email address provided in the application. If the Zoning Administrator fails to provide such notice within such 10-day period, the application shall be deemed complete. Additionally, the Zoning Administrator must approve or deny applications within the following specified time periods: (i) For a New Structure within the lesser of 150 days of receipt of the completed application or the period required by federal law for such approval or disapproval; or (ii) For the Co-Location of any Wireless Facility that is not a Small Cell Facility, within the lesser of ninety (90) days of receipt of a complete application, or the period required by federal law for such approval. (iii) Any period specified above for the City to approve or disapprove an application may be extended by mutual agreement between the applicant and the City. (iv) A completed application shall be deemed approved if the Zoning Administrator fails to approve or disapprove the application within the periods specified above or any agreed extension thereof. B. All applications must be accompanied by the following: (i) Evidence that facilities do not interfere with other existing or planned utility, transportation, or other infrastructure improvements. Evidence must demonstrate that the facilities will not encroach into visibility triangles and installation of facilities will result in no adverse impacts to public safely or other critical public service needs. (ii) A technical report must be submitted by the applicant demonstrating that the proposed facility will not result in any material potential interference with other pre-existing communications facilities or with future communications facilities that have already been designed and planned for a specific location or that have been reserved for future public safety communications facilities. C. If the Zoning Administrator disapproves an application submitted under this section for any zoning approval: (i) The Zoning Administrator shall provide the applicant with a written statement of the reasons for such disapproval; and (ii) If the Zoning Administrator is aware of any modifications to the Project as described in the application that if made would permit the Zoning Administrator to approve the proposed Project, the Zoning Administrator shall identify them in the written statement provided under subsection (i) above. The Zoning Administrator's subsequent disapproval of an application for a Project that incorporates the modifications identified in such a statement may be used by the applicant as evidence that the Zoning Administrator's subsequent disapproval was arbitrary or capricious in any appeal of the Zoning Administrator's action. D. The Zoning Administrator's action on disapproval of an application submitted under this section shall: (i) Not unreasonably discriminate between the applicant and other Wireless Services Providers, Wireless Infrastructure Providers, providers of telecommunications services, and other providers of functionally equivalent services; and (ii) Be supported by substantial record evidence contained in a written record publicly released within 30 days following the disapproval. E. Appeals. Any applicant adversely affected by the disapproval of an application for an Administrative Review Eligible Project or Standard Process Project submitted under this subsection may file an appeal pursuant to [Code of Virginia] § 15.2-2285.F, or to § 15.2-2314 and Section 31-309 of the Unified Development Ordinance if the requested zoning approval involves a variance, within 30 days following delivery to the applicant or notice to the applicant of the record referenced herein. (j) SHOULD THE TOWER, SMALL CELL FACILITY, ADMINISTRATIVE REVIEW-ELIGIBLE PROJECT, OR STANDARD PROCESS PROJECT and associated equipment no longer be used for Wireless Services for a period in excess of one (1) year, they shall be dismantled and removed from the site. (k) EQUIPMENT BUILDINGS and associated structures shall be screened from view in accordance with the landscaping standards. (l) A PERFORMANCE SURETY, in a form approved by the City Attorney, shall be submitted by the applicant prior to the issuance of a building permit in order to ensure removal of the tower or Small Cell Facility, Administrative Review-Eligible Project, or Standard Process Project when it is no longer to be used for Wireless Services.
(Ord. No. 13-O-068, 7-17-2013; Ord. No. 17-O-055, § 2(Exh. B), 6-21-2017; Ord. No. 18-O-059, § 2(Exh. B), 6-20-2018)
Ask a question about Suffolk law
Corpus searches the Suffolk sections it holds and shows the ones that match, with their citations. Free, no sign-in.