§ 34-364 — Operating and development requirements
Code of Ordinances of the City of Suffolk, Virginia (Codified through Ordinance No. 26-O-074, enacted June 17, 2026 (Supp. No. 55)) · Suffolk Code of Ordinances § 34-364
Corpus is an independent public-information project, not the official City of Suffolk website. Stable reference: corpuslaw.us/code/3b335117-9800-4647-b605-1d29af3cc61b
Sec. 34-364. - Operating and development requirements.
(a) Setbacks for borrow pits and other excavations. The edge of an excavation for borrow pits and other purposes shall be located at such distance as to protect adjoining property from collapse, caving or sliding, but in no event less than 25 feet from adjoining property lines. The setback area shall not be used for any purpose during the period of excavation, including overburden and spoil storage, except as accessory and temporary topsoil storage. (b) Access roads. All access roads shall be constructed so as to intersect as nearly as possible at right angles with public streets and highways, and no access road shall intersect any public road at an angle of less than 60 degrees. Where necessary, dust control measures shall be taken. (c) Roadside landscape. Existing trees and ground cover along public street frontage shall be preserved, maintained and supplemented for a depth of 50 feet. The type, design and spacing of supplemental planting shall be approved by the planning department. (d) Minimum slope of banks. All slopes around the edge of the excavated area shall be left with a slope of not less than three feet horizontal to one foot vertical to the water line. (e) Leveling of bottom area. Where deemed necessary by the planning commission, all excavated area shall be left in a level state. (f) Topsoil restoration and planting. All area not inundated shall be covered with topsoil and seeded as required by the planning department upon the conditions and recommendations made by the appropriate state agencies and officials. (g) Gate requirements. Gates shall be constructed at all entrances and shall be kept locked at all times when not in use. (h) Bond of operator. (1) Each operator at the time of filing his application shall furnish bond or irrevocable letter of credit in a manner approved by the city attorney payable to the city and conditioned that the operator shall faithfully perform all of the requirements of this article and of the plan of operation as approved and directed by the city council. The amount of the bond shall be not less than $500.00 per acre or part of an acre for each acre to be disturbed in an amount as determined by the planning department. Such bond or irrevocable letter of credit shall be executed by the operator and by a corporate surety licensed to do business in this state. In lieu of such bond, collateral security may be furnished satisfactory to the city manager. (2) Upon request of the operator, the planning department shall cause an inspection to be made of the land subject to the reclamation plan and, upon the planning department approval of the reclamation work completed by the operator, the planning department shall order the return of the bond or certified check to the operator. If the planning department does not approve the reclamation work, the planning department shall notify the operator immediately and advise the operator of what additional work will be required to satisfactorily complete the reclamation. The bond or other security posted by the operator for such land shall not be refunded until the planning department has obtained the operator's approval. If the operator does not undertake to complete the reclamation work as specified within 90 days of the order of the planning department, the planning department may order a forfeiture of the bond or other security posted by the operator and have the reclamation performed with the money so received. Any funds remaining after the costs of the reclamation shall be returned to the operator. (3) Within ten days following the anniversary date of any permit, the operator shall post additional bond in the amount determined by the planning department but not less than $500.00 per acre for each additional acre of land estimated by him to be disturbed during the next year following the anniversary date of the permit for which no bond has been previously posted by him. Bond or other security previously posted shall be released for the areas disturbed in the last 12 months if reclamation work has been completed and the approval of the planning department is obtained. (4) Upon receipt of an acceptable plan of operation and bond, the planning department shall present the plan to the planning commission for review and the planning commission shall make its recommendation to the city council. The city council may issue the permit with or without conditions to ensure compliance with this article unless they find that the applicant has had control or has had common control with a person who has had a borrow pit permit revoked or bond or other security forfeited for failure to reclaim lands as required by the provisions of this article, in which event no permit shall be issued; except, however, if an operator who has forfeited a bond pays the costs of reclamation in excess of the amount of the forfeited bond or if any bond is forfeited and the amount forfeited is equal to or more than the costs of reclamation, such operator shall then become eligible for another permit. (i) Unlawful interference with reclamation. It shall be unlawful for any owner of surface rights or the owner or owners of mineral rights to interfere with the operator in the discharge of his obligations to the city for the reclamation of land disturbed by him. If the owner of surface rights or the owner of mineral rights desires to conduct other mining operations on lands disturbed by the operator furnishing bond under this section, such owner or other person shall be in all respects subject to the provisions of this article; and the planning department shall then release an equivalent amount of bonds to the operator originally furnishing bond on the disturbed area.
(Code 1976, § 9-18)
Ask a question about Suffolk law
Corpus searches the Suffolk sections it holds and shows the ones that match, with their citations. Free, no sign-in.