§ 1.3 — Definitions
Code of the City of Virginia Beach, Virginia (Supp. No. 170: codified through Ordinance No. 3872, adopted September 1, 2026) · Virginia Beach City Code, App. K, art. I, § 1.3
Corpus is an independent public-information project, not the official City of Virginia Beach website. Stable reference: corpuslaw.us/code/4408820e-4e35-4152-b604-0b2f377633f8
Sec. 1.3. - Definitions.
Base flood. The flood having a one (1) percent chance of being equaled or exceeded in any given year; also referred to as the one hundred (100) year flood. Base flood elevation. The FEMA designated one (1) percent annual chance water surface elevation. The water surface elevation of the base flood in relation to the datum specified on the city's FIRM. Basement. Any area of the building having its floor sub-grade (below ground level) on all sides. Breakaway wall. A wall that is not part of the structural support of the building and is intended, through its design and construction, to collapse under specific lateral loading forces without causing damage to the elevated portion of the building or the supporting foundation system. City council. The body designated to review appeals made by individuals with regard to decisions of the floodplain administrator in the interpretation of this ordinance. City manager. The City Manager of the City of Virginia Beach, or his designees. Design Flood Elevation (regulatory flood protection elevation). The base flood elevation plus the freeboard required by this ordinance. Development. Any man-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, the placement of manufactured homes, streets, mining, dredging, filling, grading, paving, excavation or drilling operations, storage of equipment or materials, or the subdivision of land. Elevated building. A non-basement building built to have the lowest floor elevated above the ground level by means of solid foundation perimeter walls, pilings, or columns (posts and piers). Encroachment. The advance or infringement of uses, plant growth, fill, excavation, buildings, permanent structures, or development into a floodplain, which may impede or alter the flow capacity of a floodplain. Existing construction. Structures for which the "start of construction" commenced before the effective date of the most recent FIRM (January 16, 2015) "Existing construction" may also be referred to as "existing structures." Flood or flooding. 1. A general or temporary condition of partial or complete inundation of normally dry land areas from: a. The overflow of inland or tidal waters; b. The unusual and rapid accumulation or runoff of surface waters from any source; or c. Mudflows, which are proximately caused by flooding as defined in paragraph 1.b. of this definition and are akin to a river of liquid and flowing mud on the surfaces of normally dry land areas, as when earth is carried by a current of water and deposited along the path of the current. 2. The collapse or subsidence of land along the shore of a lake or other body of water as a result of erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of water, accompanied by a severe storm, an unanticipated force of nature such as flash flood or an abnormal tidal surge, or by some similarly unusual and unforeseeable event that results in flooding as defined in paragraph 1.a. of this definition. Flood Insurance Rate Map (FIRM). An official map of the city, on which FEMA has delineated both the special flood hazard areas and the risk premium zones applicable to the community. A FIRM that has been made available digitally is called a Digital Flood Insurance Rate Map (DFIRM). Flood Insurance Study (FIS). A report by FEMA that examines, evaluates, and determines flood hazards and, if appropriate, corresponding water surface elevations, or an examination, evaluation, and determination of mudflow and flood-related erosion hazards. Floodplain. Any land area susceptible to being inundated by water from any source. Flood proofing. Any combination of structural and non-structural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, or structures and their contents. Floodway. The channel of a river or other watercourse and the adjacent land areas that shall be reserved to discharge the base flood without cumulatively increasing the water surface elevation more than one (1) foot. The "floodway" may also be referred to as the "regulatory floodway". Freeboard. A factor of safety usually expressed in feet above the base flood elevation for purposes of floodplain management. "Freeboard" tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization in the watershed. When a freeboard is included in the height of a structure, the flood insurance premiums may be less expensive. Functionally dependent use. A use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for loading and unloading of cargo or passengers, and ship building and ship repair facilities, but does not include long-term storage or related manufacturing facilities. Highest adjacent grade. The highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure. Historic structure. Any structure that is: 1. Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; 2. Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district; 3. Individually listed on a state inventory of historic places in states with historic preservation programs that have been approved by the Secretary of the Interior; or 4. Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either: a. By an approved state program as determined by the Secretary of the Interior; or b. Directly by the Secretary of the Interior in states without approved programs. Hydrologic and Hydraulic Engineering Analysis. Analyses performed by a professional engineer licensed by the Commonwealth of Virginia, in accordance with standard engineering practices that are accepted by the Virginia Department of Conservation and Recreation and FEMA, used to determine the base flood, other frequency floods, flood elevations, floodway information and boundaries, and flood profiles. Letters of map change (LOMC). A letter of map change is an official FEMA determination, by letter, that amends or revises an effective FIRM or FIS. Letters of map change include: 1. Letter of map amendment (LOMA): An amendment based on technical data showing that a property was incorrectly included in a designated special flood hazard area (SFHA). A LOMA amends the current effective FIRM and establishes that a land as defined by metes and bounds or a structure is not located in a SFHA. 2. Letter of map revision (LOMR): A revision based on technical data that may show changes to flood zones, flood elevations, floodplain and floodway delineations, and planimetric features. A letter of map revision based on fill (LOMR-F) is a determination that a structure or parcel of land has been elevated by fill above the base flood elevation and is, therefore, no longer exposed to flooding associated with the base flood. In order to qualify for this determination, the fill must have been permitted and placed in accordance with the city's floodplain management ordinance. 3. Conditional letter of map revision (CLOMR): A formal review and comment as to whether a proposed flood protection project or other project complies with the minimum National Flood Insurance Program (NFIP) requirements for such projects with respect to delineation of SFHAs. A CLOMR does not revise the effective FIRM or FIS. Lowest floor. The lowest floor of the lowest enclosed area (including basement). An unfinished or flood-resistant enclosure, usable solely for parking of vehicles, building access, or storage in an area other than a basement area is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of the applicable non-elevation design requirements of Federal Code 44CFR § 60.3. Manufactured home. A structure, transportable in one or more sections, that is built on a permanent chassis and is designed for use with or without a permanent foundation when connected to the required utilities. For floodplain management purposes the term "manufactured home" also includes park trailers, travel trailers, and other similar vehicles placed on a site for greater than one hundred eighty (180) consecutive days, but does not include a recreational vehicle. Manufactured home park or subdivision. A parcel (or contiguous parcels) of land divided into two (2) or more manufactured home lots for rent or sale. Market value. The value of a structure, established prior to the damage in question, as determined by property values used for tax assessment purposes (assessment) as adjusted by the Virginia Beach Real Estate Assessor (market factor) to reflect current market conditions, or as determined by an independent appraisal done by a professional appraiser. New construction. For the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after October 3, 1970 and includes any subsequent improvements to such structures. For floodplain management purposes, new construction means structures for which the start of construction commenced on or after the effective date of a floodplain management ordinance adopted by the city and includes any subsequent improvements to such structures. Post-FIRM structures. A structure for which construction or substantial improvement occurred after October 3, 1970. Pre-FIRM structures. A structure for which construction or substantial improvement occurred on or before October 3, 1970. Recreational vehicle. A vehicle that is: 1. Built on a single chassis; 2. Four hundred (400) square feet or less when measured at the largest horizontal projection; 3. Designed to be self-propelled or permanently towable by a light duty truck; and 4. Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational camping, travel, or seasonal use. Repetitive loss. Flood-related damages to a structure sustained on two (2) separate occasions during a ten-year period for which the cost of repairs at the time of each flood event, on average, equals or exceeds twenty-five (25) percent of the market value of the structure before the most recent damage occurred. Special flood hazard area (SFHA). The land in the floodplain subject to a one (1) percent or greater chance of being flooded in any given year as set forth in this ordinance. These areas are designated as AE, AH, AO, A, and VE on the FIRM. Start of construction. For other than new construction and substantial improvement under the Coastal Barrier Resources Act (P.L. 97-348), means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement, substantial improvement, or other improvement was within one hundred eighty (180) days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation, or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation, such as clearing, grading, and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure. For a substantial improvement, the actual start of the construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building. Structure. For floodplain management purposes, a walled and roofed building, including a gas or liquid storage tank, that is principally above ground, as well as a manufactured home. Substantial damage. Damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed fifty (50) percent of the market value of the structure before the damage occurred. Substantial improvement. Any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds fifty (50) percent of the market value of the structure before the start of construction of the improvement. This term includes structures that have incurred substantial damage regardless of the actual repair work performed. The term does not, however, include either: 1. Any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications that have been identified by the local code enforcement official and are the minimum necessary to assure safe living conditions; or 2. Any alteration of a historic structure provided that the alteration will not preclude the structure's continued designation as a historic structure. 3. Historic structures undergoing repair or rehabilitation that would constitute a substantial improvement as defined above, shall comply with all ordinance requirements that do not preclude the structure's continued designation as a historic structure. Documentation that a specific ordinance requirement will cause removal of the structure from the National Register of Historic Places or the State Inventory of Historic places shall be obtained from the Secretary of the Interior or the State Historic Preservation Officer. Any exemption from ordinance requirements will be the minimum necessary to preserve the historic character and design of the structure. Violation. The failure of a structure or other development to be fully compliant with the provisions of the floodplain ordinance in effect at the time of construction or development. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in this ordinance is presumed to be in violation until such time as that documentation is provided. Watercourse. Any natural or artificial lake, river, creek, stream, ditch, channel, waterway, gully, ravine, swale, or wash in which water flows, either continuously, periodically, or intermittently, and which has a definite channel, bed, or banks.
(Ord. No. 3309, 11-26-13; Ord. No. 3376, 10-7-14; Ord. No. 3580, 2-5-19; Ord. No. 3685, 2-1-22; Ord. No. 3828, 9-16-25)
Ask a question about Virginia Beach law
Corpus searches the Virginia Beach sections it holds and shows the ones that match, with their citations. Free, no sign-in.
