Sec. 209. - Wind energy conversion systems.
(a) Purpose. The purpose of this section is to promote the use of renewable energy sources by allowing wind energy conversion systems in appropriate locations while minimizing visual, safety and environmental impacts and promoting the safe, effective and efficient use of such systems. (b) Application requirements. (1) Conditional use permit applications. In addition to the information required by section 221, applications for a conditional use permit for a wind energy conversion system shall include the following items: a. A site plan or plan drawn to scale, showing the location, height and design of the proposed system, including any accessory buildings or other appurtenances, adjacent land uses, and any other applicable information required by the planning director; b. A certification from a professional engineer licensed in the Commonwealth of Virginia that the proposed system complies with all applicable regulations and requirements of the Virginia Uniform Statewide Building Code and Federal Aviation Administration; c. A certification from a professional engineer licensed in the Commonwealth of Virginia that the structure upon which the proposed wind energy conversion system is to be mounted will have the structural integrity to carry the weight and wind loads of the wind energy conversion system and have minimal vibration impacts on the structure; and d. Elevation drawings, computer-generated photographic simulations, or such other documentation as the planning director may require that depict how the proposed wind energy conversion system, including accessory buildings, will appear as constructed on the proposed site; provided, however, that this requirement shall not apply if the proposed wind energy system is allowed as a principal use. (2) Building permit/site development plan applications. In addition to information otherwise required by ordinance, applications for building permits or site development plans shall include the information specified in subdivisions a., b. and c. (c) Lot area, setback, height, etc. requirements. Wind energy conversion systems shall be subject to the following requirements: (1) Lot area. Minimum lot area requirements for wind energy conversion systems shall be as follows: a. For freestanding wind energy conversion systems outside of residential districts, forty thousand (40,000) square feet plus an additional twenty thousand (20,000) square feet for each such system in excess of one (1); b. For roof-mounted wind energy conversion systems, the minimum lot area specified in the district regulations; and c. For wind energy conversion systems allowed as a conditional use, the city council may approve an application in which the subject property fails to meet the specified minimum lot area requirements upon a finding that the proposed system is of such size or in such location, or that the conditions attached to the conditional use permit are sufficiently restrictive, that the deficiency in lot area will not result in any adverse effects upon surrounding properties. The planning director shall include in his report to the planning commission the specific factors, if any, that would support the granting of a conditional use permit on lots that fail to meet the minimum lot area requirements of this section. (2) Setbacks. a. No tower in any freestanding wind energy conversion system shall be located closer to any property line or public right-of-way than a distance equal to one hundred ten (110) percent of the height of the tower or the setback specified in the applicable district regulations, whichever is greater, or closer to any residential structure or overhead utility transmission line than a distance equal to one hundred ten (110) percent of the height of the tower. b. No support structure of a freestanding wind energy conversion system, including guy wires, shall be located in any required front yard or any required side yard adjacent to a street. (3) Height. a. Unless otherwise specified in this section or the conditional use permit, wind energy conversion systems shall be subject to the height regulations of the zoning district in which they are located; provided, that in no event shall the height of any such system exceed that recommended by the manufacturer. b. The height of a freestanding wind energy conversion system shall be measured as the distance from ground level to the highest point on the tower, including the vertical length of any extensions such as rotor blades. The height of a roof-mounted wind energy conversion system shall be measured as the distance from the point at which the base of the system is attached to the building or the lowest point of any component of the wind energy conversion system, whichever is lower, to the highest point on the wind energy conversion system, including the vertical length of any extensions such as rotor blades. c. Notwithstanding any contrary height limitation specified in the district regulations, roof-mounted wind energy conversion systems may project a maximum of eight (8) feet above the roofline of the structure on which they are located unless a greater height is allowed by the conditional use permit. d. The minimum rotor clearance of freestanding wind energy conversion systems shall be twenty-five (25) feet above ground level for systems incorporating horizontal-axis turbines and ten (10) feet for systems incorporating vertical-axis turbines. (4) Signage. No signage, other than safety and warning signs, shall be allowed. (5) Tower construction. All freestanding towers shall be of monopole construction, without guy wires or visible anchors, unless allowed by the conditional use permit. (6) Noise. The highest level of noise generated by the system, as measured at any adjoining property line, shall not exceed an A-weighted decibel level of 55 dB(A). (7) Illumination. No portion of a system shall be illuminated unless required by the Federal Aviation Administration. (8) Siting. Systems shall be sited in a manner to minimize shadowing and flickering effects on any adjacent property. (9) Electrical connections. All electrical controls, control wiring and power lines shall be located underground or otherwise hidden from view. (10) Braking. All systems shall be equipped with a redundant braking system that engages at wind speeds in accordance with the manufacturer's specifications so as to minimize the potential for wind damage to the system or its supporting structure. (11) [Appearance.] Unless otherwise required by the Federal Aviation Administration or other governmental authority or allowed by the conditional use permit, all portions of a wind energy conversion system shall be of a nonreflective white, black, galvanized steel, aluminum or other matte-finish color designed to blend with the surrounding environment; provided, however, that blades may be painted black to facilitate deicing. Where more than one system is located on a lot, all such systems shall be of a uniform appearance. (d) Inspections. All wind energy conversion systems, including all associated equipment, shall be inspected every two (2) years to ensure compliance with this section and the conditional use permit. The report of such inspection shall be provided to the planning director. (e) Discontinuance. Any wind energy conversion system that is not in use for a period of one (1) year shall be removed within ninety (90) days after notification by the planning director.
(Ord. No. 3102, 9-8-09)
Ask a question about Virginia Beach law
Corpus searches the Virginia Beach sections it holds and shows the ones that match, with their citations. Free, no sign-in.