Sec. 33-19. - Hauling of sand, gravel, topsoil, fill, or other excavated material off an excavation site.

(a) It shall be unlawful for any person to haul more than three hundred thirty-seven (337) in situ cubic yards of sand, gravel, topsoil, fill, or other excavated material from an excavation site by vehicle upon any street in the City of Virginia Beach without a hauling permit from the department of planning in accordance with the provisions of this section. (1) If the hauling project is associated with a site plan or subdivision construction plan, the hauling plan shall be reviewed, approved, and permitted as part of that plan. The hauling work will be covered as part of the project right of way permit, and will not need a separate hauling permit. The fifty dollar ($50.00) application fee and annual renewal fee will not be required. All other requirements outlined below shall apply. (b) Application for a permit required by this section shall be filed with the department of planning on forms supplied by the city. The application fee shall be fifty dollars ($50.00). The application shall be signed by the property owner, hauler and operator and shall include the following information: (1) The names and addresses of all haulers; (2) If the hauler is a corporation, the name and address of its corporate offices and registered agent; (3) The name and address of the excavator and/or operator; (4) The names and addresses of owners of all property from which the fill material is to be hauled. If the hauled material is to be deposited within the limits of the City of Virginia Beach, provide proof of current VPDES or VESMP permit coverage for the disposal site; (5) The proposed date on which the hauling operation will commence and the proposed date on which the operation will be completed; (6) The total number of cubic yards of material to be hauled; (7) The number, type, carrying capacity, and weight of vehicles to be used in the hauling operation on a daily basis; (8) The location of all haul roads leading to public streets and highways within the hauling area; (9) A statement listing the public streets to be used as haul routes to access an arterial or major street or highway; (10) A statement of the methods to be used to maintain or repair any public street or highway to be used for hauling purposes; (11) A site plan or survey of the excavation site, with a location map, showing the locations of the area to be excavated, the on-site haul road, the point at which the haul road intersects the public right-of-way, the nearest street intersections in all directions leaving the excavation site and all existing and proposed entrances on both sides of the public street within five hundred (500) feet of the proposed entrance; (12) A detailed description of the on-site haul road and the entrance to the public right-of-way, including width, radii, composition of surface material and length of improved surface; (13) Erosion and sediment control measures to be employed at the haul road entrance and all access points; (14) The method by which dirt and dust will be controlled on the public streets and in the air; (15) A traffic maintenance/control plan, including, but not limited to, sign type, size, color, lettering size and locations; (16) Location and description of public structures and improvements immediately adjacent to and under the haul road entrance; and (17) A description or plan of all proposed improvements to mitigate the traffic impacts associated with the hauling activity including, but not limited to, turn lanes, signalization, striping and other traffic control measures. In the event any changes in the above-required information are needed, the applicant shall submit such changes to the planning department for review and approval prior to the commencement thereof. (c) The director of the department of planning or his designee shall determine the acceptability of the hauling methods and routes proposed by the applicant, and shall grant the hauling permit unless: (1) Under accepted engineering standards, it is determined that the public streets and highways to be used in the proposed hauling route cannot sustain the weight or frequency of the hauling vehicles without substantial damage thereto; or (2) The proposed hauling operation would render the streets and highways affected by the hauling unsafe for public travel; or (3) The noise or dust generated by the hauling operation is of such character, intensity and duration as to be detrimental to the life or health of persons of reasonable sensitivity, or to disturb or annoy the quiet, comfort or repose of reasonable persons who reside in close proximity to the hauling operation; or (4) Any of the information required under this subsection is incomplete, incorrect, or false. Any person aggrieved of the decision of the planning director or his designee may appeal such decision to the city manager or his designee within thirty (30) days of the date of such decision. Any person aggrieved of the decision of the city manager or his designee may appeal such decision to the circuit court within thirty (30) days of the date of such decision. (d) In the event the planning director or his designee issues a hauling permit under this section, he may attach such conditions and safeguards as are deemed necessary to protect the public safety and to ensure against the creation of a public nuisance or substantial damage to the streets due to the hauling and may require the posting of a bond with surety, cash, escrow, letter of credit, any combination thereof, or such other legal arrangement acceptable to the city attorney, to assure compliance. (e) No permit issued under this section shall be transferred to another person without approval by the planning department. Such approval shall be granted in the same manner as for original applications for permits. (f) A hauling permit issued under this section shall expire one (1) year from the date of issuance. The holder of the permit may thereafter apply annually to the department of planning for a renewal of the permit upon the payment of a fifty dollar ($50.00) renewal fee and verification of all information required under subsection (b). (g) A violation of any of the provisions of this section or failure to comply with the terms and conditions of a hauling permit shall constitute a Class 1 misdemeanor. In addition to the penalties imposed hereunder, the city may institute legal action to enjoin a continuing violation of any of the provisions of this section or of any of the terms and conditions of a hauling permit issued pursuant to this section. (h) In addition to, and not in lieu of, the remedies set forth in subsection (g) hereof, the director of planning or his designee may revoke a hauling permit issued pursuant to this section as a result of the violation of any of the terms or conditions of the permit. (i) This section shall not apply to excavation operations conducted pursuant to an excavation permit and a conditional use permit for a borrow pit or to stormwater management facilities constructed pursuant to approved subdivision construction plans or site plans.

(Ord. No. 2395, 6-11-96; Ord. No. 3858, 6-16-26)

Ask a question about Virginia Beach law

Corpus searches the Virginia Beach sections it holds and shows the ones that match, with their citations. Free, no sign-in.