§ 8-34 — Same—Electrical permits
Code of the City of Virginia Beach, Virginia (Supp. No. 170: codified through Ordinance No. 3872, adopted September 1, 2026) · Virginia Beach City Code § 8-34
Corpus is an independent public-information project, not the official City of Virginia Beach website. Stable reference: corpuslaw.us/code/9a7e6cd1-6af1-4155-a5f1-6bc8d3201377
Sec. 8-34. - Same—Electrical permits.
(a) The fee for a permit for electrical work, as required by the building code, shall be as specified in this section. (b) There shall be charged a minimum fee of fifty dollars ($50.00) for each permit issued. (c) For a permit issued for a temporary service, such as a trailer, house meter or meter loop added to an existing service, the fee shall be fifty dollars ($50.00). (d) For a permit for any special condition, such as and including temporary electrical release for construction purposes, buildings moved, swimming pools, carnivals, services relocated but not increased and the like, the fee shall be a minimum of seventy-five dollars ($75.00). The fee for a permit for prefabricated buildings for out-of-city use shall be fifty dollars ($50.00). (e) For a permit issued for original construction, the following fees include all equipment outlets only if specifically listed on the application and installed by the permit holder before the final inspection, such fees being based on the maximum current carrying capacity of each set or subset of service conductors installed, to the nearest fifty (50) amperes: (1) Single-phase: Fifty dollars ($50.00) plus twenty dollars ($20.00) for each additional fifty (50) amperes. (2) Three-phase: Eighty dollars ($80.00) plus twenty dollars ($20.00) for each additional fifty (50) amperes. When services are increased or phases added, the fee shall be one-half the rate above, plus the added equipment fee. For fee purposes, the service-panel nameplate amperage rating shall be used. (f) For each piece of equipment connected and for each circuit or feeder installed, extended, relocated or repaired, the fee shall be fifty dollars ($50.00) plus five dollars ($5.00) per circuit. (g) On any electrical work commenced before an electrical permit has been issued and the requisite fee paid therefore, an administrative fee of two hundred fifty dollars ($250.00) per unit shall be added to the fee due. Payment of such administrative fee shall not in any way relieve the violator from such penalties as may be imposed by the courts.
(Code 1965, § 8-22; Ord. No. 939, 4-23-79; Ord. No. 1207, 7-13-81; Ord. No. 1868, 5-15-89; Ord. No. 2318, 5-9-95; Ord. No. 2528, 5-11-99; Ord. No. 2754, 5-13-03; Ord. No. 2877, 5-10-05; Ord. No. 3410, § 1, 5-12-15, eff. 7-1-15; Ord. No. 3499, 4-18-17; Ord. No. 3695, 5-10-22)
Ask a question about Virginia Beach law
Corpus searches the Virginia Beach sections it holds and shows the ones that match, with their citations. Free, no sign-in.
