For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3124 — Extraction Operations

Code of Ordinances of the City of Montpelier, Vermont (Codified through Ordinace No. 2026-0413, adopted April 8, 2026. (Supp. No. 2, Update 1)) · Montpelier Code of Ordinances § 3124

Corpus is an independent public-information project, not the official City of Montpelier website. Stable reference: corpuslaw.us/code/262d28e2-c48e-41e6-b3e9-03680c9da00d

Section 3124. - Extraction Operations

3124.A Applicability. The provisions of this subsection apply to quarrying and sand or gravel excavation as specified below: (1) Quarrying is a development activity principally designed to mine, extract, or remove limestone, minerals or bedrock materials for commercial purposes. (2) Sand or gravel excavation is a development activity principally designed to mine, extract, or remove unconsolidated sediments for commercial purposes. (3) The provisions of this section do not apply to cut and fill operations associated with approved development. 3124.B Pre-Existing Sites. An expansion of a pre-existing or previously approved extraction site shall require a complete review of the use as if an original application was being made. The review shall consider the relationship and coordination of activities between the original site and the expanded portion of the site. The additional and cumulative impacts that shall be caused by the combined operations on factors such as the environment, traffic, safety, noise, air pollution, neighborhoods, and adjacent land uses shall be of principal concern during this review. 3124.C Setback Distances. Figure 3-15 establishes minimum setback distances for specific on-site activities associated with an extraction operation from adjacent property. 3124.D Buffer Yards. A minimum buffer yard of 100 feet shall be maintained adjacent to all property boundaries and street rights-of-way in accordance with the following: (1) No excavation or storage of equipment or materials may occur within the buffer yard. (2) Natural vegetation shall be maintained or supplemented as needed within the buffer yard. The Development Review Board may require additional screening, including berms, to protect adjacent property owners from the impacts of the excavation activity. (3) The Development Review Board may approve the location of vegetated earthen berms for erosion control or stormwater management purposes within the buffer yard. 3124.E Operational Standards. The following minimum operational standards shall apply to all excavation operations unless otherwise approved by the Development Review Board: (1) Any topsoil removed from the surface and retained on the site for reapplication to disturbed areas during reclamation shall be carefully removed and stockpiled to prevent erosion. (2) Extraction activities shall be phased. A new phase shall not begin until at least 50% of the active/current phase is reclaimed in accordance with the approved reclamation plan and the Administrative Officer has verified completion of the reclamation. The Development Review Board may place conditions on the size and sequence of the phases. (3) The applicant shall submit and implement plans for erosion control and stormwater management. The Administrative Officer may periodically inspect the site to ensure compliance with erosion control and stormwater management plans. (4) An excavation operation shall not cause the drainage of a wetland except as permitted by the Vermont Agency of Natural Resources. (5) No excavation activity may occur within riparian areas as established in Subsection 3004.D. (6) Operational activities, including blasting, excavation, processing and hauling are prohibited between the hours 7 p.m. (or dusk if earlier) and 7 a.m. The Development Review Board may further limit hours as deemed necessary to mitigate impacts to adjacent properties and streets. (7) Designated truck routes shall be used for all hauling and access to the site to the maximum extent feasible. Upon the recommendation of the Department of Public Works, the Development Review Board may impose weight limits on truck leaving the site if the streets serving the site are not suitable for heavy truck traffic. (8) A 6-foot continuous security fence shall be provided around the entire perimeter of the site on which quarrying activity shall take place. The Development Review Board may impose additional fencing requirements on portions of the site abutting residential areas, community facilities, and other public gathering places. (9) The applicant shall install warning signs on the property and along haul routes as deemed necessary to protect safety and general welfare in the area. (10) Operations shall maintain compliance with local standards for noise, dust, and vibration. All equipment and machinery shall be operated and maintained in such a manner as to minimize dust, noise, and vibration. Access and haul roads shall be maintained in a dust-free condition by surfacing, watering or other treatment on a regular basis. (11) Stockpiles shall not exceed 50 feet in height. The Development Review Board may further restrict the height of stockpiles as necessary to mitigate their visibility from public vantage points and adjacent property. 3124.F Reclamation Standards. Sites shall be reclaimed at the completion of extraction activities in accordance with the following: (1) No approvals or permits for subsequent development on the extraction site shall be issued prior to reclamation of the site. (2) Topsoil capable of sustaining vegetative growth shall be provided and evenly spread on all disturbed areas. (3) Disturbed areas shall be stabilized and seeded at the earliest possible time following completion of extraction operations in an area in accordance with the approved erosion control plan. Progressive reclamation practices shall be implemented to continue to reclaim and stabilize disturbed areas prior to moving to a new phase. Final reclamation of each phase shall be completed within 6 months of the completion of each phase of the operation. (4) All equipment, stockpiles, debris, signs, and other materials or improvements associated with excavation shall be removed from the site after completion of the activity. (5) Erosion control measures shall be kept in place until permanent vegetation has been established on the site and erosion is controlled. (6) If the extraction activities will result in the creation of a water body, at the completion of the operation the water body shall have a natural form with variation in shoreline and depth. (7) Following reclamation, no slope on the site shall exceed a 30% slope (horizontal to vertical) over a distance of 30 feet. The Development Review Board may require a flatter angle if it is shown that the site will not be stable at a 30% slope or that vegetation cannot be established on the 30% slope. The Development Review Board may waive this requirement for areas of exposed ledge. (8) In addition to being seeded to prevent erosion, the reclaimed site shall be landscaped. The applicant shall submit a landscape plan that best suits the ultimate proposed use and design of the site provided that at least 8 deciduous and 8 evergreen large trees are planted for each disturbed acre. (9) The applicant shall submit a master plan for the post reclamation use of the site that demonstrates that the reclaimed site shall be suitable for a use allowed in the district and for development in accordance with the applicable provisions of these regulations. 3124.G Performance Bond. The Development Review Board may require the applicant to provide a performance bond or other financial security in an amount satisfactory to and approved by the city to ensure that all standards are fully met during operation and that proper site reclamation is completed in a timely manner. Failure to stabilize the site, failure to make necessary repairs and improvements to streets damaged by the excavation activity, failure to reclaim the site as specified in the approved reclamation plan, or any other inconsistencies between the approved operation and reclamation plans and the actual extraction or reclamation activities carried out will be cause for the City of Montpelier to redeem the performance bond or other financial security to make the necessary corrections. 3124.H Inspection and Monitoring. As a condition of approval, the Development Review Board may require that the Administrative Officer inspect the site at a specified interval to ensure that the extraction activity is being undertaken in accordance with the approved plans. As a condition of approval, the Development Review Board may require on-going monitoring of the operation to ensure that extraction activities are not adversely impacting the natural environment, the surrounding neighborhood or public infrastructure. 3124.I Review Criteria. The Development Review Board shall find that the proposed extraction activity meets the conditional use criteria and that the development shall: (1) Not result in a danger to life or property due to: steep or unstable slopes; unsafe access to the property; excessive traffic; or proximity to existing or planned neighborhoods, parks, and roadways. (2) Adequately mitigate visual, noise, dust and excessive on- or off-site environmental impacts on existing or planned neighborhoods, parks and roadways. (3) Adequately mitigate the effects of the use of trucks and heavy equipment on road safety and maintenance and shall not cause excessive congestion of public roads providing access to the site. (4) Not adversely affect the quality of air, groundwater, or surface water, and shall minimize impacts of significant ecological resources and natural communities. (5) Not result in negative impacts on drainage patterns or stormwater management facilities. (6) Adequately restore the site following completion of the excavation activity so that upon completion any adverse effects to scenic quality, natural landscapes, wildlife, or habitat shall be mitigated. (7) Provide buffers to screen unsightly features of the excavation operation year-round from public vantage points and adjoining properties. (8) Be appropriate in intensity and anticipated duration given the size and location of activity. Figure 3-15. Setback Distances for Extraction Activities Required Distance from Adjacent Property in the: | EG District | RL District | All Other Districts Excavation areas with an elevation change >10 ft. | 100 ft. min | 150 ft. min | 250 ft. min Stockpiles (long-term storage) | 100 ft. min | 150 ft. min | 250 ft. min Stockpiles (short-term storage) and loading points | 100 ft. min | 200 ft. min | 300 ft. min Crushing or processing | 100 ft. min | 500 ft. min | 1,000 ft. min Blasting (from a developed property) | 300 ft. min | 500 ft. min | 1,000 ft. min

Ask a question about Montpelier law

Corpus searches the Montpelier sections it holds and shows the ones that match, with their citations. Free, no sign-in.