For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-307 — EXTENSIONS OF TIME

Code of Ordinances of the City of Montpelier, Vermont (Codified through Ordinace No. 2026-0413, adopted April 8, 2026. (Supp. No. 2, Update 1)) · Montpelier Code of Ordinances § 4-307

Corpus is an independent public-information project, not the official City of Montpelier website. Stable reference: corpuslaw.us/code/debc9fa7-f759-4b9d-82cd-b763ffd1d57b

Sec. 4-307. - EXTENSIONS OF TIME.

A. Time Limit The time limit set for the correction of any violation not prohibited by Section 4-306 subsection (C) below may be extended by the Building Inspector for a reasonable time upon a showing that the person ordered to make the repair has made a good faith effort to comply with said order, and that the repair could not have been accomplished within the time originally set, or, in the case of owner-occupied, two-family dwellings, upon the showing of unusual hardship. Unusual hardship can only be applied to the owner- occupied portion of the building. Each such extension shall be recorded in the file for the affected property and such record shall include a description of good faith effort, inability to accomplish within the original time, and hardship relied upon in granting the extension. No single extension shall exceed 60 calendar days unless weather conditions would prohibit correction of the violation within 60 calendar days. The Building Inspector or the Housing Board of Appeals may grant a time extension due to the owner's inability to gain access to the unit if the owner has requested, by a letter sent by certified mail, reasonable times when the work can be done. B. Good Faith Effort "Good Faith Effort" is defined as a substantial portion of the work completed or: (1) The owner or agent has a signed and completed contract with a company that is capable of making the repair, and the contract was signed at a time that would have allowed the work to be completed in the time allowed by the Building Inspector had not weather or natural disaster prevented; or (2) If the owner or agent or his/her staff is capable of making the repair, the owner or agent must present to the Building Inspector a paid invoice or delivery order for the materials needed to make the repair and the materials must have been ordered at a time that would have allowed the repair to be made in the time allowed by the Building Inspector, had weather conditions or natural disaster not prevented. C. Hazardous Conditions Time extensions shall not be granted by the Building Inspector in imminently hazardous conditions, such as, but not limited to, gas leaks, no utilities, inadequate heat as required by this ordinance, unsafe fire exit, etc. D. Total Time The total time for making repairs of violations not constituting a hazard to health and safety, including the initial time and extensions by the Building Inspector, shall not exceed six months. E. Additional Extensions Additional extensions of reasonable periods, not to exceed three months, may be granted by the Housing Board of Appeals in cases where a person ordered to correct a violation has not been able to do so within the time set by the Building Inspector, despite all diligent effort. A bond or an irrevocable letter of credit may be required to be posted with the Building Inspector if the Board determines one necessary to guarantee completion of the repairs. The bond or letter of credit amount shall be determined by the Board based upon the repairs required by the Building Inspector. F. Time Limits for Extensions of Applications Extensions must be sought within one working day after the expiration of the preceding time period, and decisions as to whether extensions will be granted must be made within two working days after the preceding time period. The Building Inspector shall keep written records of the reasons for granting time extensions.

Ask a question about Montpelier law

Corpus searches the Montpelier sections it holds and shows the ones that match, with their citations. Free, no sign-in.