§ 16.30.050 — Experimental design adjustments
Federal Way Revised Code (The Federal Way Revised Code is current through Ordinance 26-1052, passed September 1, 2026.) · Federal Way Revised Code § 16.30.050
Corpus is an independent public-information project, not the official City of Federal Way website. Stable reference: corpuslaw.us/code/384fdb49-e3cd-48d0-b155-17723b40ef43
16.30.050 Experimental design adjustments.
Adjustments utilizing an experimental water quality facility or flow control facility may be approved by the director on a limited basis if the following criteria are met: (1) The experimental design is likely to meet the identified target pollutant removal goal or flow control performance based on performance data and theoretical considerations; and (2) Construction of the facility can, in practice, be successfully carried out; and (3) Maintenance considerations are included in the design, and costs are not excessive or are borne and reliably performed by the applicant or property owner; and (4) The applicant or property owner contributes a share of the cost of monitoring to determine facility performance. The director may condition approval of an experimental design adjustment upon the applicant’s agreement to reserve sufficient land area and post a bond or other financial guarantee satisfactory to the director, for construction of a conventional facility should the experimental facility fail. The director may approve release of the set aside area and financial guarantee upon proof of operation of the experimental facility to the satisfaction of the director.
(Ord. No. 09-630, § 16, 10-20-09; Ord. No. 99-352, § 3, 11-16-99. Code 2001 § 21-21.)
Ask a question about Federal Way law
Corpus searches the Federal Way sections it holds and shows the ones that match, with their citations. Free, no sign-in.