19.105.040 Regulation of work hours.
(1) Work hours permitted. Development activities and heavy equipment operations are permitted between the hours of 7:00 a.m. and 8:00 p.m. Monday through Friday, and between 9:00 a.m. and 8:00 p.m. Saturday, and are not permitted on Sundays or holidays observed by the city, unless otherwise allowed under subsection (2) of this section. (2) Exceptions. The director of community development may grant revocable, written permission to engage in a development activity or to operate heavy equipment other than permitted in subsection (1) of this section, in accordance with the following: (a) Any exception must be requested by advance written request to the director, including a description of the specific exception(s) requested; proposed temporary construction mitigation measures for any related impacts such as traffic, noise, and glare; and an analysis of how the request meets the following criteria: (i) The work will not result in substantial adverse impacts to surrounding properties. (ii) The exception is necessary to avoid undue delay of project completion and/or long-term inconvenience or disruption to the public. (3) Notice. Unless waived, modified, or exempted by the director under subsection (4) or (5) of this section, applicants granted an exception under subsection (2) of this section shall mail written notice, at least seven calendar days in advance of the approved work, to owners and occupants of property located within 300 feet of project boundaries; and post one or more notice boards on the project site, as determined by the director. Such notice shall include the approved construction hours, general description of construction activities, summary of mitigation measures accepted by the director, and two 24-hour project contacts for the duration of the project. (4) Waiver of notice. The director may waive or modify the requirements of subsection (3) of this section, based on project location, scope, scale, or alternative comparable notification methods, and/or other reasonable considerations. (5) Emergency exemption. Projects deemed by the director to be necessary to ensure the immediate safety, health, or welfare of the community, or individuals of the community, or to restore property to a safe condition following a natural or manmade disaster or other emergency, are exempt from the provisions of this section. (6) Revocations. The director may revoke or modify any exception approved under this section based on verified complaints that the development activity or heavy equipment operation does not meet the terms of the approved exception, or if the activity creates some unanticipated and verifiable adverse effect.
(Ord. No. 09-608, § 3(Exh. A), 4-7-09; Ord. No. 99-341, § 3, 5-4-99; Ord. No. 90-43, § 2(115.25), 2-27-90. Code 2001 § 22-1006.) | Cross references: Licenses and business regulations, FWRC Title 12; buildings and building regulations, FWRC Title 13.
Ask a question about Federal Way law
Corpus searches the Federal Way sections it holds and shows the ones that match, with their citations. Free, no sign-in.