For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 19.256.200 — Removal of facility

Federal Way Revised Code (The Federal Way Revised Code is current through Ordinance 26-1052, passed September 1, 2026.) · Federal Way Revised Code § 19.256.200

Corpus is an independent public-information project, not the official City of Federal Way website. Stable reference: corpuslaw.us/code/bf6c5600-813a-462c-969b-151e2a153828

19.256.200 Removal of facility.

(1) Abandonment and removal. The owner or operator of a WCF shall provide the city with a copy of the notice of intent to cease operations required by the FCC at the time it is submitted to the FCC. Additionally, the owner or operator of a WCF shall notify the city in writing of the abandonment of a particular facility within 30 days of the date the WCF is abandoned. The abandoned WCF shall be removed by the facility owner within 90 days of the date the WCF is abandoned, the permit is revoked, or if the facility falls into disrepair and is not maintained, as determined by the city. Disrepair includes structural features, paint, landscaping, or general lack of maintenance that could result in adverse safety or visual impacts. If there are two or more users of a single tower, then the city’s right to remove the tower shall not become effective until all users abandon the tower. (2) Partial abandonment and removal. If the abandoned antennas on any major WCF are removed or relocated to a point where the top 20 percent or more of the height of the supporting structure is no longer in use, the major WCF shall be considered partially abandoned. The owner or operator of any partially abandoned major WCF shall notify the city in writing of the partial abandonment of a particular facility within 30 days of the date the major WCF is partially abandoned. The owner of the major WCF shall have 120 days from the date of partial abandonment to collocate another service on the major WCF. If another service provider is not added to the major WCF within the allowed 120-day collocation period, the owner shall, in 210 days of partial abandonment, dismantle and remove that portion of the supporting structure that exceeds the point at which the highest operational antenna is mounted. (3) Removal and lien. If the owner or operator fails to remove the abandoned or partially abandoned facility upon 210 days of its abandonment or partial abandonment, the responsibility for removal falls upon the property owner on which the abandoned or partially abandoned facility is located. The city may enforce this subsection using the procedures as set forth in Chapter 1.15 FWRC.

(Ord. No. 21-906, § 5, 1-19-21.)

Ask a question about Federal Way law

Corpus searches the Federal Way sections it holds and shows the ones that match, with their citations. Free, no sign-in.