§ 19.90.010 — Definitions
Federal Way Revised Code (The Federal Way Revised Code is current through Ordinance 26-1052, passed September 1, 2026.) · Federal Way Revised Code § 19.90.010
Corpus is an independent public-information project, not the official City of Federal Way website. Stable reference: corpuslaw.us/code/205cdae5-81ef-4f60-a8f4-2f40d99b572e
19.90.010 Definitions.
The definitions in this section apply throughout this chapter unless the context clearly requires otherwise. Terms not defined here are defined according to Chapter 19.05 FWRC or FWRC 1.05.020 in that order. The director shall have the authority to resolve questions of interpretation or conflicts within this chapter. “Affected intersection” means any intersection within the city meeting the requirements of FWRC 19.90.070 and having a direct traffic impact as a result of development activity. “Available capacity” means capacity which can be encumbered, reserved, or committed to future users, expressed in an appropriate unit of measure, such as p.m. peak hour trips. “Background traffic” means existing traffic levels and the anticipated traffic from all proposals for which CRCs have been approved under the provisions of this chapter. “Build-out year conditions” means the volume of traffic that is projected to occur on the roadway system as of the anticipated date of occupancy of a proposal. Traffic conditions include regional traffic and the anticipated traffic from all proposals for which CRCs have been approved under the provisions of this chapter. “Capacity” means the availability of an affected intersection to accommodate increased traffic resulting from a development without causing the LOS to fall below the standards established in the comprehensive plan. “Capacity reserve certificate (CRC)” means the certificate issued by the city pursuant to the terms and conditions of this chapter which constitutes the proof that adequate capacity for each affected intersection has been reserved to serve the densities and intensities of development within the time frame designated on the certificate. “City of Federal Way development standards” means those development standards adopted by the city. “Concurrency denial letter” means a letter issued by the director which summarizes the results of the concurrency evaluation and the reason for denying the request for a concurrency reserve certificate. “Concurrency evaluation” means the evaluation by the director to ensure that necessary roadway improvements are made concurrent with proposed development activity, pursuant to RCW 36.70A.070. “Concurrency management” means the process local jurisdictions use to ensure that necessary roadway improvements are made concurrent with proposed development activity, pursuant to RCW 36.70A.070. “Direct traffic impact” means any net increase in vehicle traffic generated by a proposed development. “Director” means either the director of the department of community development or the department of public works, consistent with their respective scopes of authority under FWRC 19.90.030, unless the context clearly indicates otherwise. “Level of service (LOS)” means a qualitative measure describing operational conditions within a traffic stream, described with alphabetical representations of “A” through “F” as defined in the Highway Capacity Manual prepared by the Transportation Research Board of the National Research Council, to indicate the amount of congestion and delay at particular locations, and adopted by the city. “Net new trips” means the trip generation of the development activity less any allowable credit for existing activity that will be replaced, demolished or abandoned as part of the development activity. “Peak hour” means the highest volume of traffic for a continuous hour between 4:00 p.m. and 6:00 p.m. on weekdays. “Reserved capacity” means capacity which has been allocated to a particular property through issuance of a capacity reserve certificate reserving capacity for a set period of time. “Select zone analysis” means a travel demand model analysis that identifies trips generated within a selected transportation analysis zone. “Six-year transportation improvement program (TIP)” means the annually adopted transportation improvement program which identifies all the city’s transportation needs over the next six years, including the total project costs. “Standards” means the adopted city of Federal Way development standards. “Total project cost” means the total cost for the transportation projects, as defined in the current TIP. This cost includes, but is not limited to, studies, design, right-of-way acquisition, utility relocation, grading, and construction. “Transportation analysis zone” means the area defined within a travel demand model representing all the land uses contained within that area. “Trip assignment” means the determination within a travel demand model of the number and type of trips using a defined roadway. “Trip distribution” means the determination within a travel demand model of the number and type of trips traveling between any given pair of transportation analysis zones. “Trip generation” means the number of peak hour trips estimated to be produced by the development activity using Institute of Transportation Engineers (ITE), current edition, or other methodology approved by the director. “Trip generation credit” means a reduction in the number of new peak hour trips attributed to an application as described in FWRC 19.90.080, equal to the number of peak hour trips generated on the site described on the application from uses that have had a SEPA analysis prior to the effective date of the ordinance adopting this chapter that have ceased or will cease if the development permit is granted.
(Ord. No. 26-1044, § 48, 6-16-26; Ord. No. 09-628, § 3, 10-20-09; Ord. No. 09-593, § 20, 1-6-09; Ord. No. 06-525, § 1(Exh. A), 6-6-06. Code 2001 § 19-151.)
Ask a question about Federal Way law
Corpus searches the Federal Way sections it holds and shows the ones that match, with their citations. Free, no sign-in.
