For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.22.030 — Public Sewer System Connections

Code of Ordinances of the City of Kennewick, Washington (Codified through Ordinance No. 26-6253, enacted September 15, 2026 (Supp. No. 19)) · Kennewick Municipal Code § 14.22.030

Corpus is an independent public-information project, not the official City of Kennewick website. Stable reference: corpuslaw.us/code/03a83b91-0603-43ab-897e-f63e974e10b1

14.22.030: - Public Sewer System Connections.

It is unlawful to make any connection to a building sewer, side sewer, public sewer system, or natural outlet without complying with all of the provisions of this Chapter and Chapters 14.24 through 14.28, and other ordinances in relation thereto, and before paying required fees and obtaining an approved connect order. A licensed contractor, person or duly authorized agent shall not break, alter, or tamper with any public sewer system or its appurtenances except to make a connection to an existing wye or tee after obtaining a connect order. (1) Fees. Before making any connection or receiving an approved connect order, required fees shall be paid. Sanitary sewer fees are defined in Chapter 14.24. Storm sewer fees are defined in Chapter 14.28. (2) Connect Order. Before making any connection, a completed connect order shall be filed with the City Finance Department and approved by the Director. (a) The Director may change or modify the application and designate the manner and place where the side sewer shall connect to the public sewer system, may specify the material, size and grade of the side sewer, and may determine whether or not the order shall be granted. The Director may require the applicant to furnish plans prepared and stamped by a professional engineer, licensed in this state. (b) If, in the opinion of the Director, physical conditions make compliance with the provisions of this chapter and Chapters 14.24 and 14.28 impracticable, the Director may issue a connect order for installation of a connection or side sewer requiring compliance with said provisions insofar as is reasonably possible, and such connect order shall be issued only upon the condition that the property owner shall record with the Benton County Auditor an instrument acceptable to the Director agreeing to save harmless and indemnify the City from any damage or injury resulting from such installation. This section is not intended to be used to alter prescribed usage of storm and sanitary sewers. (3) Inspection. (a) Any licensed contractor or person performing the connection shall, prior to backfilling, call for inspection of the building sewer by the building official and for inspection of the side sewer connection by the Director, 48 hours in advance of the desired inspections, excluding Saturday, Sunday and holidays. The location of the premises by address and the file number of the permit shall be given. (b) If the inspector finds the work performed or materials used not in accordance with this chapter and Chapters 14.24 through 14.28, and rules and regulations, and the city standard plans and specifications, he shall notify the person doing the work and the owner or occupant of the premises by written notice. Such notice shall be all that is required to be given of the defects in the work or materials found in such inspection that must be corrected before acceptance of the work. Either the contractor, person, or a competent representative shall be on the premises, whenever so requested to meet the Director. The property owner shall also meet the Director at a mutually convenient time during regular hours of business when requested. (4) Service Taps. When a public sewer system service tap is required for the connecting property's side sewer connection, the City shall perform the service tap. (5) Required Connections. Whenever any land, buildings, or premises are required to be connected with the public sewer system as provided in Section 14.22.020, the Director, upon a field investigation that a connection is accessible, shall serve upon the owner, agent, lessee or occupant of said land, buildings, premises or habitable structures, a notice in writing specifying the time within which such connection must be made, which time shall not be more than 30 days from the date of delivery of such notice. If such owner, agent, lessee or occupant fails, neglects or refuses to connect said land, buildings, premises or habitable structures to the public sewer system within the time specified, the Director may make such connection, and the cost, plus overhead thereon shall become the connection charge to the owner, agent, lessee or occupant, and a bill showing the amount thereof shall be mailed or delivered to him, or posted upon the premises, whereupon the amount shall immediately be paid to the City Finance Department. (6) Connection Easements. Before a building sewer may be located on private property other than the property being served by the building sewer, and before the Director issues a permit authorizing the laying of such building sewer, the owner of the building sewer shall secure a written easement from the owner of the property to be crossed. The easement shall be duly acknowledged, and shall grant the right to occupy the property for building sewer or utility purposes. The easement shall be recorded in the office of the Benton County Auditor by the owner of the building sewer, and the recording number shall be exhibited to the Director. (7) Connection Reuse. Where a new or converted building or new installation replaces an old one, the use of an existing side sewer will be permitted when approved by the Director as conforming to all requirements of this Chapter and Chapters 14.24 through 14.28. (8) Connection Standards. The connection of the building sewer and side sewer to the public sewer system shall conform to the requirements of the Uniform Building Code, the Uniform Plumbing Code, A.P.W.A. Standard Specifications, or other applicable standard rules and regulations of the City. (9) Special Connections. (a) In any building, structure or premises in which the plumbing outlets or other drainage facilities are too low in elevation, as determined by the Director, to permit gravity flow to the public sewer system, wastewater shall be lifted mechanically and discharged into the public sewer. (b) Whenever a situation exists involving danger of backups of sewage or drainage from a public sewer system, the Director may prescribe a minimum elevation at which the building drain may be discharged to the public sewer system. Wastewater from drains or side sewers below such minimum elevation shall be lifted mechanically to an elevation determined by the Director, or, if approved by the Director, a backwater sewage valve may be installed, provided the property owner records with the Benton County Auditor an instrument as described in subsection (b) of subsection (2) of this section. The effective operation and maintenance of the backwater sewage valve or the mechanical lifting device shall be the responsibility of the property owner. (10) Connection Size. Every dwelling unit or building shall be separately and independently connected with the public sewer, when such sewer is provided, unless such connection is six-inch diameter pipe or larger, except in accordance with subsection (b) of subsection (2) of this section, and except for certain accessory dwelling units in accordance with subsection (12) of this section. Four inches shall be the minimum diameter of pipe for gravity flow building sewers and side sewers. Pipe diameter of side sewers, for multiple dwelling, industrial or commercial buildings, shall be in accordance with the Uniform Plumbing Code and/or as required by the Engineer or Director. (11) Outside City Limit Connections. (a) The Director, in addition to the application for water and sewer service set out above, will require from all applicants residing outside the territorial limits of the City, such documents as he deems necessary to ensure that the property of the applicant, or any persons claiming title through the applicant, will be annexed to the City when it becomes reasonably contiguous. In the event that the applicant refuses to execute any document as required or attempts to impair or repudiate any document or agreement executed either by himself or a predecessor in interest, the City's duty to supply services shall cease. In the event that property reasonably contiguous to the City becomes annexed and then removed as the result of a reduction of the City limits (except when initiated by resolution) or when the proposed annexation of an area fails or is held invalid, the City's duty to provide service thereto shall cease. (b) Developments or groups requesting connection to the public water and sewer systems outside the City limits shall be submitted for approval to the Director and the City Council after completion of pre-zoning per RCW 35A.14.330, subject to the conditions imposed thereby. (12) Connections for Additional Dwelling Units. When additional dwelling units are added to a single residential lot, the following applies: (a) Sewer Service Connection Allowances: Sewer Service Connection Allowances Number of Units | Minimum Number of Connections | Minimum Sewer Line Size 1—2 units | 1 | 4" 3+ units | 1 per every 2 dwelling units | 4" (b) Deviations from KMC 14.22.030(12)(a) may be permitted by the Public Works Director.

(Ord. 25-6099 Sec. 1, 2025; Ord. 5966 Sec. 1, 2022; Ord. 2609 Sec. 6, 1981; Ord. 2480 Sec. 3, 1980; Ord. 2247 Sec. 3, 1979; Ord. 2172 Sec. 1(part), 1978; Ord. 1941 Sec. 1 (Exhibit A), 1976; Ord. 1919 Sec. 2(part), 1976)

Ask a question about Kennewick law

Corpus searches the Kennewick sections it holds and shows the ones that match, with their citations. Free, no sign-in.