§ 14.28.045 — Design, Construction, and Post Construction
Code of Ordinances of the City of Kennewick, Washington (Codified through Ordinance No. 26-6253, enacted September 15, 2026 (Supp. No. 19)) · Kennewick Municipal Code § 14.28.045
Corpus is an independent public-information project, not the official City of Kennewick website. Stable reference: corpuslaw.us/code/ebcd7ea2-aac7-4e78-bca0-762e6179dd24
14.28.045: - Design, Construction, and Post Construction.
The City formally adopts the Stormwater Management Manual of Eastern Washington. All design, construction, and post construction management of erosion and sediment control and storm drainage facilities shall be in accordance with Appendix 1 of the NPDES Stormwater Permit, the Stormwater Management Manual for Eastern Washington, City Standards and Comprehensive Plans. See Chapter 5.56 and 14.29. (1) Stormwater shall be retained and disposed of onsite meeting the volume determined by the Soil Conservation Service (SCS) Type 1A storm design method for the 25-year 24-hour frequency. Design of the flow based treatment BMPs will be based on the six-month three-hour hydrograph and volume based BPMs shall be based on the six-month 24-hour hydrograph. Alternative methods must be approved by the Public Works Director. (2) This storm design shall satisfy the core elements of Appendix 1 of NPDES Stormwater Permit, the SMMEW, State Underground Injection Control Rule (Chapter 173-218 WAC) and COK Standard Specifications. In order to meet Section 5.6.4 of the SMMEW, storm design shall be further demonstrate retention up to the 100 year storm with allowance for on-site surface pooling. Where it is shown not feasible to retain, treat and dispose of stormwater on site, as approved by the Public Works Director, storm flows may be conveyed to, treated and disposed of at a regional infiltration facility within the same drainage basin. Discharging flows to surface waters of the state are the last resort. Design of treatment and flow control facilities shall meet the requirements listed above and shall include an assessment of the impacts to the downstream conveyance from the project site to the outfall or as approved by the Public Works director. On site infiltration infeasibility criteria include: (a) Shallow ground water. (b) Impermeable or very low permeability subsurface material. (c) Proximity to known hazardous waste site or landfill, proximity to drinking water, well or spring, proximity to onsite sewage system, or underground storage tank, setback from structures, landslide hazard areas or slopes, incompatibility with surrounding drainage system from elevation or location or areas prone to erosion. (d) Incompatibility with uses related to concerns such as public safety, protection from spills, contaminated sites, or frequently flooded areas. (e) Incompatibility with state or federal laws.
(Ord. 6005, Sec. 4, 2023; Ord. 5656 Sec. 2, 2016; Ord. 5290 Sec. 7, 2010)
Ask a question about Kennewick law
Corpus searches the Kennewick sections it holds and shows the ones that match, with their citations. Free, no sign-in.