§ 15.35.090 — Use of explosives
Code of Ordinances of the City of Kennewick, Washington (Codified through Ordinance No. 26-6253, enacted September 15, 2026 (Supp. No. 19)) · Kennewick Municipal Code § 15.35.090
Corpus is an independent public-information project, not the official City of Kennewick website. Stable reference: corpuslaw.us/code/df8bd860-f6ad-4b03-aaf3-a7b99440afd0
15.35.090: - Use of explosives.
The use of explosives within the city must comply with federal and state regulations concerning the use of explosives, including, but not limited to, Chapter 70.74 RCW and the current edition of WAC 296-52. (1) General Blasting Plan. A blasting plan for each discrete project requiring the use of explosives shall be submitted to and approved by the city prior to the issuance of a blasting permit. The plan shall be accompanied by additional documentation (e.g., maps, site plans and excavation drawings) in order to detail the proposed blasting operation. The plan shall include: (a) The location where the blasting is to occur. This shall include, at a minimum, a plan showing the proposed blast area, construction site and surrounding structures. Provide a second drawing showing the layout of the blast area accompanied by a minimum of one long section and two cross sections showing the limits of the blasting work to be completed. The City may require resubmittal of plans if the limits of the work and the blast area are not clearly defined; (b) The approximate total volume of material to be blasted; (c) The incremental volumes, per blast, of material to be blasted. Provide a plan and two orthogonal cross sections through the first two planned blasts showing proposed blast hole layouts and depths, proposed hole loads and stemming, estimated powder factor, delay sequencing, planned maximum number of pounds of explosive that will detonate in any eight-month period, and predicted Peak Particle Velocities at the closest adjacent structures (in minimum of four different orthogonal directions); (d) The types and packaging of explosive materials to be used along with Manufacturer's product information sheets and Material Safety Data Sheets (MSDS) for all explosives, blasting agents, primers and initiator products, blasting devices, lightning detectors, blasting mats, and all other blasting equipment proposed for use; (e) The drill hole diameters, depths, patterns, sub-drilling depths and drill hole orientations to be used; (f) The initiation system, the incremental delay times and the location of the primers in the explosive column; (g) The stemming depths and stemming material for the various estimated depths of drill holes to be blasted; (h) The approximate powder factors anticipated; (i) The fly-rock control procedures and equipment, if any, to be used; (j) The maximum number of blasts to be made in any one day; (k) The blast warning sound system and equipment to be used; and (l) The scheduled start date and finish date of blasting operations. (2) Blasting Safety Plan. (a) A complete description of the warning, clearing and guarding procedures that will be employed to ensure personnel, staff, visitors, and all other persons are at safe locations during blasting. This information will include details regarding visible warning signs or flags, audible warning signals, method of determining blast areas (all areas affected by any potentially harmful blast effects), access blocking methods, guard placement and guard release procedures, primary initiation method, and the system by which the blaster-in-charge will communicate with site security guards; (b) Detailed description of how explosives will be safely stored transported and used at the site. Plans will explain how day storage magazines and explosive transport vehicles will satisfy all applicable BATF, OSHA, DOT, Federal, and State regulations. This plan will also indicate how explosives will be inventoried secured and guarded to prevent theft or unauthorized use of explosives. (c) Equipment that will be used to monitor the approach of lightning storms and in the event of such, evacuation and site security plans. (d) Detailed contingency plans for handling of misfires caused by cutoffs or other causes. (e) Fire prevention plan details, including, smoking policies, procedures and limitations for work involving any open flames or sparks, description and location of all firefighting equipment, and firefighting and evacuation plans. The fire prevention plan will be subject to approval by the Fire Code Official. (f) Description of the personal protective equipment that will be used by the Contractor's personnel, including, but not limited to, safety glasses, hard-toe footwear, hard hats, and gloves and any special provisions required by the Fire Code Official related to PPE. (3) Traffic Control Plan. A traffic control plan, acceptable to the city detailing signing, flagging, temporary road closures and detour routes for blasting operations must be provided prior to the issuance of a blasting permit. If any road closures are proposed, the traffic control plan must account for school bus schedules and shall not delay school buses on regularly scheduled routes. (4) Pre-Blast Notification Plan. A plan outlining a program of pre-blast public notifications, structural inspections and blast effect monitoring within a specified distance of the blasting is required prior to the issuance of a blasting permit. (a) The distances from the blasting within which the (a) notification, (b) pre-blast structural inspection, and (c) blast monitoring are required and shall be determined by the scaled distance formulas set forth below. No blasting will be permitted until the notification and inspection requirements are completed. The Fire Code Official can increase the minimum distances. (i) Distance from the blast within which notification of all occupied structures is required: Da = 180√w. (ii) Distance from the blast within which inspection of all occupied structures is required: Db = 150√w. (iii) Distance from the blast within which monitoring of selected structures is required: Dc = 120√w. (b) In the scaled distance formulas (noted above), Da, Db, and Dc are the actual distances in feet from the closest point in the blast. "√w" is the square root of the maximum weight of the explosives in pounds detonated with a minimum eight millisecond separation from another detonation event in a sequentially delayed blast. (c) Notification Letter. The pre-blast notification shall consist of a letter advising all residents within a specified distance of the blasts of the character and intent of the blasting program, its anticipated impact on local residents, the proposed duration of blasting activities and providing telephone numbers for public contact. Distribution of this notification shall be made a minimum of seven days prior to the start of blasting. Copies of the Notification Letter(s) shall be provided to the Fire Code Official. (d) Pre-Blast Inspection. A pre-blast inspection of residents' property shall be offered to all residents within the specified distance of the blasting at the permit holder's expense and done by a qualified third party who is not an employee of the contractor. A copy of the individual inspection reports and a log of all photos taken are to be sent to the Fire Code Official or their designees. Where inspections are disallowed by the resident or not possible for other reasons, a certified letter shall be sent to the occupant/owner at the unsurveyed address advising them of their right to a pre-blast inspection and the possible consequences of denying an inspection. (e) The pre-blast inspection program for residences within the specified distance shall be completed no later than two days prior to the start of blasting with notification to the Fire Code Official or their designees. (5) Blast Plan Compliance Inspections. During the first scheduled blast operation a representative(s) of the Fire Official's Office shall be present and witness the blast operation. The Fire Code Official, or their designee, shall conduct additional site visits to observe subsequent blasting operations at the discretion of the Fire Code Official. (6) Post-Blast Inspection. Building owners may request an inspection of their property if, following a blast, they feel damage has occurred to their property because of the blasting. This request may be made regardless of scaled distance formula criteria given in subsection (4a) of this section. This inspection is to be made by an operator's representative within 15 days of the request. If no agreement is arrived at between the operator and property owner, the city, upon request by the operator or the property owner, shall arrange to have a qualified third party do an inspection and submit a timely report to all parties concerned. The cost of the inspection will be borne equally between the affected party and the blasting contractor. The report will be provided to both parties and the city. (7) Monitoring. All blasts are to be monitored using blast-monitored equipment designed for that purpose and carrying a certificate of calibration dated within the current calendar year. The blast monitors shall record Peak Particle Velocity (PPV) and frequency in three orthogonal directions and air over pressure in dBL. For shots in which the pounds detonated per eight millisecond time increment are less than ten pounds and the closest structures are more than 200 feet away, one blast monitor is required. When ten or more pounds are detonated per eight millisecond time interval, two blast monitors are required. All blasting-monitoring records are to be signed and submitted to the city within 24 hours of each blast. (8) Maximum Peak Particle Velocity. The maximum peak particle velocity in any seismic trace at the dominant frequency to be allowed on any residential, business or public structure shall conform to WAC 296-52-67065, Figure 8a or 8b shall be modified as follows: (a) If the estimated/predicted vibration levels at any adjacent structure, for any of the blasts, are greater than 50% of the maximum allowable limits in WAC 296-52-67065, Figure 8a or 8b then the Permittee shall retain a Professional Engineer (PE) licensed in the State of Washington to examine the planned blasting program, adjacent structures and any condition surveys performed and to prepare and stamp a report demonstrating and affirming that the adjacent structures will not be damaged by the proposed or revised blasting program. The City shall review the Professional Report and may increase the allowable limits beyond the 50% maximum allowable limits in WAC 296-52-67065, Figure 8a or 8b at their sole discretion. They may also determine that the 50% maximum allowable limits in WAC 296-52-67065, Figure 8a or 8b be retained to afford mitigation to the potentially affected parties. (b) The methods to be used for blast vibration monitoring shall be provided in the Blast Plan along with the methods used to predict vibration levels and the magnitudes of predicted vibration levels for planned blasts. (9) Air Blast. The maximum air blast over pressure permitted at the closest residential, business or public structure designed for human occupancy is not to exceed 133 dBL @ 2.0 Hz hi pass system per the USMB RI 8485. (10) Utilities. Whenever blasting is being conducted in close proximity to or under existing utilities, the utility owner shall be notified a minimum of 24 hours in advance of blasting, by the applicant. The Fire Code Official shall be notified that this was accomplished prior to blasting. (11) Blast (Shot) Report. A signed Blast (Shot) Report on a form approved by the Fire Code Official, Community Development Director, or their designee, shall be filed with the city within 24 hours of making the blast. The report shall include the following blast information: (a) Date, time and location of shot; (b) Number of drill holes; (c) Maximum, minimum and average drill hole depth; (d) Drill hole diameter; (e) Sub-drill depth; (f) Total pounds of each type of explosive used; (g) A drill hole section schematic showing the loading of a typical hole; (h) Amount and type of stemming material; (i) Schematic showing drill hole pattern; (j) Initiation delay sequence; (k) Maximum pounds of explosives detonated in any eight millisecond time interval; (l) Type and size of any fly-rock protection devices used if any; (m) Seismic reports; (n) Comments regarding the outcomes of the blast. (12) The city shall be notified: (1) immediately of any blasting accident, and (2) within 24 hours by the permittee of any incident, damage claim or neighbor annoyance report brought to the permittee's attention.
(Ord. 5876 Sec. 7, 2020;Ord. 5868 Sec. 5, 2020)
Ask a question about Kennewick law
Corpus searches the Kennewick sections it holds and shows the ones that match, with their citations. Free, no sign-in.
